Pavement Cut and Restoration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Georgia → Dalton UtilitiesView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-75553-NONST-2027-000000061.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 Water Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Dalton Utilities
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Dalton Utilities
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs cutting of existing pavement and subsequent restoration for prime contractors on Dalton Utilities water infrastructure projects. Executes pavement cutting for water main access and installs asphalt and concrete pavement restoration per City of Dalton road standards. Delivers restored road surfaces to original or specified conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, asbestos abatement, tunneling, boring, underground piping, asphalt and concrete paving, electrical work, and various site support services including traffic control and security. Bidders must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100% of their contract value, with Kiewit reimbursing the bond premiums. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms to maintain labor harmony and adhere to collective bargaining agreements with various trades. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating strict compliance with DBE Program requirements. Interested firms must provide certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bid packages and invitations are managed through the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Georgia → Dalton Utilities

Same awarding agency

NAICS: 335313
SLED
JD Cope MV/LV Switchgear
Solicitation # PE-75553-NONST-2027-000000062
Dalton Utilities is soliciting bids for the design, fabrication, and delivery of critical electrical equipment for the J.D. Cope Energy Facility, a 55.6 MW reciprocating-engine generation plant located in Whitfield County, Georgia. The scope of work requires the provision of one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup. The contract includes the delivery of engineering submittals, manufacturer field services for erection and start-up, spare parts, special tools, and comprehensive documentation. All equipment must be delivered DDP to the site in Chatsworth, Georgia, with a projected award date of September 16, 2026, and a planned delivery date of November 26, 2027. The project mandates strict adherence to quality and safety standards, including OSHA, NFPA, NEC, ASME, and the International Building Code, with an expected equipment service life of 30 years. The supplier is required to maintain a documented quality assurance program and develop an Inspection and Test Plan for approval by the purchaser prior to fabrication. Rigorous packaging and marking requirements are in place to prevent corrosion and damage during transit. Bids are due by September 11, 2026, and the owner will award the contract based on the best overall value rather than the lowest bid.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

23 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
SLED
2026 Water Rehabilitation Project
Solicitation # PE-75553-NONST-2027-000000061
The 2026 Water Rehabilitation Project is a solicitation issued by Dalton Utilities in Georgia for the construction of water infrastructure improvements across multiple roads, including Carr Dr, Hurricane Rd, and Rock Hill Dr. The scope of work involves replacing existing pipe infrastructure, valves, and fire hydrants, installing new services, and connecting existing mains, specifically utilizing 6-inch and 8-inch Class 350 Ductile Iron Pipe. The contractor is also responsible for comprehensive site restoration to ensure post-construction conditions are equal to or better than pre-construction states, as well as implementing all necessary erosion and pollution control measures. Bids are due by September 11, 2026, and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. The project must be completed within 365 calendar days from the notice to proceed, with a requirement to mobilize within three weeks of the award. Key requirements include the submission of a Georgia Utility Contractor License, proof of project management experience of at least two years, and the provision of performance and payment bonds. Payment is processed monthly with a 30-day turnaround following the approval of invoices and detailed work summaries. Final acceptance is contingent upon the submission of precise as-built drawings with specific GPS coordinates and elevations.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 5 days
View Details