Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on May 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pavement Extension and Road Construction Project in Round Lake Beach

Closed
241-61J86 State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and 35 or more buildings, requiring mowing to a height of 3 to 4 inches, string trimming, edging, and general cleanup. The contract is for an initial one-year term with four optional one-year renewals. The award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. To be considered technically acceptable, offerors must be registered in the State of Kentucky and verified through the SAM portal. Required submission documents include a technical and price proposal, a staffing plan, a safety program, proof of insurance, a description of available equipment, and three references for similar contracts. The contract mandates strict adherence to the Davis-Bacon Act and Contractor Wage Rate Requirements, specifically Wage Determination Number KY20210041. Consequently, contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. All work is subject to inspection by the Center, and any identified deficiencies must be corrected within 48 hours at no additional cost. Quotes are due by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 6 hours ago

DEADLINE

in about 20 hours

AI Contract Overview

Show more

This project involves the construction of new pavement and roadway extensions in Round Lake Beach, specifically extending Hook Drive from Nicole Lane to Orchard Lane and constructing Nicole Lane from Hook Drive to Rollins Road. The scope includes excavation, laying aggregate base and sub-base layers, and installing hot mix asphalt pavement. Additionally, the work encompasses the construction of sidewalks, curbs, gutters, storm and sanitary sewer systems, water mains, landscaping, and lighting foundations with conduit installation. The contract aims to improve transportation infrastructure and drainage systems in the area. The project is managed by the Illinois Department of Transportation Construction, with a contract value estimated between 5 million and 10 million dollars. The solicitation was posted on May 15, 2025, with a response deadline of June 13, 2025. It is open to qualified contractors, and the project emphasizes comprehensive infrastructure upgrades to support local traffic flow and community development. The contract details are accessible through the designated project link for further specifications and bidding instructions.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois Department of Transportation Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS