Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pavement Management Plan Services

Closed
RFP NO. 26-07State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The City of Costa Mesa is seeking professional services to update and maintain its Pavement Management Plan for approximately 231.2 miles of paved roadways, which are categorized into three networks: the Master Plan of Arterial Highways (74.4 miles), local residential streets (156.8 miles), and alleys (14.7 miles). The pavement conditions for the arterial roads were last surveyed in 2024, while the local streets were surveyed in 2021. The contract requires the selected consultant to resurvey the arterial roads in 2026, 2028, and 2030, and the local streets in 2027, with final reports prepared in accordance with OCTA guidelines for each of these years. The most recent citywide pavement management report was submitted in June 2024, and the upcoming surveys will ensure ongoing assessment and maintenance planning for the city's road infrastructure. The solicitation, titled Pavement Management Plan Services (RFP NO. 26-07), was posted on October 21, 2025, with a response deadline of November 12, 2025. The project is estimated to have a contract value between $500,000 and $1,500,000. The City of Costa Mesa, part of the California organization, is the contracting agency, and interested vendors can contact Stephanie Urueta via email or phone for further information. The project aims to ensure the continued integrity and safety of the city's roadway network through systematic resurveying and reporting aligned with OCTA standards.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Costa Mesa
Contacts1 person available
OfficeN/A

Full Description

Show more
The City's roadways consist of approximately 231.2 centerline miles paved streets. The roadways are divided into three networks: Master Plan of Arterial Highways (MPAH), Local Streets, and Alleys.• 74.4 center miles of MPAH roadways• 156.8 center miles of local residential roads• 14.7 center miles of local alleysThe pavement conditions of the MPAH roads were last surveyed in 2024; however, the local networks were surveyed in 2021. The final report for the updated Citywide Pavement Management Plan was last submitted to OCTA in June 2024.The consultant shall resurvey the MPAH roads in 2026, 2028 and 2030, the local streets in 2027 and prepare Final reports in 2026, 2028 and 2030 per the OCTA guidelines.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS