Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pavement Rehabilitation project (EA 06-1K250) is a forecast contract managed by Caltrans District 6 in Tulare County, California. The scope of work is located on State Route 99, extending from 0.2 miles south of the Avenue 120 overcrossing to 0.1 miles north of Elk Bayou. All activities will be performed within the Caltrans right of way and include the removal and replacement of RHMA-O (0.10') and RHMA-G (0.20') pavement, dig-out repairs at failed locations between post mile 19.5 and 25.2, and the application of fog seal and 2-foot shoulder backing. Additionally, chevron markings will be applied to ramp gore areas from post mile 15.1 to 19.5. The project is categorized as routine maintenance and is categorically exempt under CEQA Section 15301, Class 1c, and qualifies for a NEPA categorical exclusion. Key environmental and safety requirements include adherence to Caltrans Standard Special Provisions for the management of lead-containing materials, specifically regarding residue from grinding, cold planing, and the removal of yellow thermoplastic pavement markings. Compliance plans for lead management are required under SSP 14-11.12, SSP 36-4, and SSP 84-9.03B. Pedram Mafi serves as the primary point of contact for the project.

General Info

Caltrans District 6 pavement rehabilitation and marking improvements on State Route 99, Tulare.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

Place of Performance

On State Route 99 from Ave. 120 overcrossing to Elk Bayou, Tulare, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A
Contacts
Pedram MafiSenior Environmental Scientist Supervisor

Full Description

Show more
Project is located on State Route 99 in Tulare, 0.2 miles south of Ave. 120 overcrossing to 0.1 mile north of Elk Bayou. Work involves removing and replacing RHMA-O (0.10’) and RHMA-G (0.20’) with dig-out repairs at various failed locations from post mile 19.5 to post mile 25.2, along with fog seal and 2-foot shoulder backing where needed. Chevron markings to be applied on gore areas of the ramps from post mile 15.1 to 19.5. All work stays within the Caltrans right of way.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Install 6 New Bus Shelters
Solicitation # SPC26-20
Solicitation SPC26-20 is a request for proposals from the City of Paramount, California, to furnish all materials, equipment, tools, and labor necessary to install six new bus shelters. The scope of work includes the removal, demolition, and renovation of existing shelters and trash cans, as well as the construction of new improvements, including foundations, footings, and reinforcement. Key deliverables involve the installation of the bus shelters, solar light systems, and site lighting, along with the replacement of approximately 900 square feet of concrete sidewalk paving. The project requires strict adherence to technical specifications for electrical marking, structural steel standards from the American Institute of Steel Construction, and welding codes from the American Welding Society. The contract will be awarded to the lowest responsible bidder following an investigation into the bidder's qualifications. Proposals must be submitted in a sealed envelope by October 27, 2026, and must include a proposal guarantee of at least 10 percent of the total bid amount via certified check, cashier's check, or bid bond. The successful contractor must provide a faithful performance bond and file insurance certificates within 10 working days of the award. Performance is restricted to weekdays between 7:00 a.m. and 3:30 p.m., and the contractor is required to submit a construction schedule within 10 working days of contract execution. Inspections will be conducted on-site by the Architect and City Engineer to ensure compliance with local codes and project plans.
City of Paramount

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Traffic Safety Flashing Stop Sign Program 2026
Solicitation # 20260930003
The Traffic Safety Flashing Stop Sign Program 2026 is a public works project for the City of Montclair, California, focused on enhancing road safety for motorists and pedestrians. The scope of work includes the installation of 21 solar LED flashing 30-inch stop sign assemblies and 3 solar LED flashing 36-inch stop sign assemblies, along with the removal and construction of approximately 371 square feet of new sidewalk. All work must adhere to City Standards 112 and 114, as well as the 2021 Edition of the Standard Specifications for Public Works Construction (Greenbook). The project must be completed by December 21, 2026, with a strict construction moratorium on major streets and around the Montclair Place Mall from November 21, 2026, to January 3, 2027. The contract will be awarded to the lowest responsible bidder based on the agency's estimated quantities. Bidders must demonstrate experience by listing at least three completed projects from the last five years and must provide a current contractor's license. Critical compliance requirements include California Air Resources Board fleet certifications, adherence to California Labor Code and Public Contract Code regulations, and the payment of prevailing wages. The successful contractor is required to provide both Faithful Performance and Payment bonds at 100 percent of the contract amount. Progress payments are issued monthly, provided the contractor submits itemized costs and prevailing wage reports. All project direction is managed by the City Engineer or her designee.
City of Montclair, California

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS