Pavement Rehabilitation EA 06-1K270
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Caltrans District 6 is forecasting a pavement rehabilitation project on State Route 198 near Coalinga, California. The scope of work involves the removal of existing asphalt concrete pavement to a depth of 0.25 feet and its replacement with hot mix asphalt and rubberized hot mix asphalt. All activities will be conducted within the existing road from edge of pavement to edge of pavement, including the application of 3-foot wide shoulder backing in designated areas. The project is limited to the Caltrans right of way and may include the installation of temporary signposts at the beginning and end of work areas at the county lines. This forecast is managed by the California Department of Transportation under the leadership of Senior Environmental Scientist Supervisor Pedram Mafi.
General Info
Agency
NAICS
Place of Performance
On State Route 198 and Beach Rd, Parkfield Junction and Firestone Ave, Coalinga, CASet-Aside
Documents
(2)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
