Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pavement Restoration and Surface Repairs

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract titled Pavement Restoration and Surface Repairs requires the complete restoration of roadways and surfaces impacted by prior excavation activities, with specific focus on asphalt or concrete patching to satisfy the technical and quality standards set by Caltrans and the City. All work must ensure seamless integration with existing pavements, proper compaction, durability, and alignment with regulatory specifications to maintain safe and functional public thoroughfares. The scope is strictly limited to surface rehabilitation following construction disturbances and does not include new infrastructure or major reconstruction. This is a subcontract under NAICS code 237310 issued by the Public Works agency of California, with a response deadline of June 16, 2026. The opportunity was posted on April 29, 2026, and all work is expected to be performed within the jurisdiction of the contracting authority, though the exact location details are unspecified. Interested parties must submit proposals by the stated deadline to be considered, and compliance with state and local pavement restoration protocols is mandatory. The contract is not subject to any set-aside classification, and further details can be accessed through the provided online portal.

General Info

Restoration of excavated roadways with asphalt and concrete to meet Caltrans and City standards.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of c401511.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Laurent St Sewer Rehabilitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Restoration of roadways and surfaces disturbed during excavation, including asphalt or concrete patching to meet Caltrans and City standards.

More opportunities from California → Public Works

Same awarding agency

NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Engineering Services

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
West Linda Multi-Use Basin Phase II Project
Solicitation # 3260070
The West Linda Multi-Use Basin Phase II Project (Contract No. 3260070) is a general construction solicitation issued by the Yuba County Public Works agency in California. With an estimated cost of $1,121,293.00, the project involves infrastructure improvements at the West Linda Detention Basin, including the construction of parking lot improvements, a multi-use path, a ramp to the basin, workout and bench areas, storm drains, and landscape enhancements. The work must be performed in accordance with 2025 Caltrans Standard Plans and Yuba County Improvement Standards. The project timeline is divided into three milestones: general work must be completed within 60 working days, plant establishment within 90 working days, and total project completion within 150 working days. Bids are due by 2:00 p.m. on November 19, 2026, and will be awarded to the lowest responsive and responsible bidder. Submissions must be sealed and include a bid bond or cashier's check for 10 percent of the total bid price. The successful contractor is required to provide separate performance and payment bonds, maintain insurance for the contract duration plus five years, and adhere to prevailing wage laws. Key compliance requirements include a Quality Assurance Program for material testing, a Worker Environmental Awareness Program for tribal cultural resources, and strict adherence to environmental commitments regarding dust control and biological protections. There is no DBE goal for this project, and no pre-bid meeting is scheduled.
Highway, Street, and Bridge Construction

POSTED

about 14 hours ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS