This Solicitation opportunity from Ohio was posted on September 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Paving 2.02 miles on Little Miami Scenic Trail
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract for resurfacing 2.02 miles of the Little Miami Scenic Trail in Warren County, Ohio, is governed by a comprehensive set of state-specific terms, statutes, and regulations rather than federal FAR clauses. It mandates that the project be completed by May 17, 2026, during weekday daylight hours, with work performed at designated trail segments starting at coordinates 39.361071, -84.1656864, and includes optional alternates for additional paving segments. Bidders are required to submit separate bids for the main project and two alternates, with the lowest total bid determining the award, which will be made to a responsible and responsive bidder. The scope involves milling existing asphalt, placing new asphalt per Ohio Department of Transportation standards, reconditioning shoulders, and ensuring proper traffic control and site cleanup, all in accordance with ODOT CMS specifications from January 1, 2019. The contractual framework incorporates numerous Ohio statutes and regulations, including provisions for funding appropriations, compliance with safety and labor laws, prevailing wage requirements, nondiscrimination, and preferences for Ohio-made products and veteran-owned businesses. It emphasizes strict adherence to laws prohibiting offshore services and data storage outside the United States, with mandatory disclosures regarding service and data locations. The contractor must complete and update an Affirmation and Disclosure Form, certifying awareness of these restrictions and certifying business registration with the Ohio Secretary of State. The agreement also requires the contractor to coordinate trail closures and detours with the ODNR representative at least 14 days prior to work and notify 48 hours in advance of any closures, ensuring safety and minimal disruption. All work must comply with applicable safety, environmental, and construction standards, with inspection and acceptance responsibilities primarily assigned to the ODNR. The agency will review production samples before full-scale work begins, and final acceptance will be contingent upon compliance with specifications, industry standards, and the absence of defects. The contract emphasizes transparency, requiring detailed invoicing procedures, and stipulates that payments are contingent upon appropriations, with ODNR not liable beyond the available funds. The legal terms also specify that modifications must be in writing, and the contract is governed by Ohio law, with dispute resolution in Franklin County. Overall, the contract is structured to ensure legal compliance, quality standards, and accountability, with detailed provisions for project execution, legal obligations, and contractor responsibilities embedded within state law and administrative policies.
General Info
Agency
Place of Performance
OH, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The existing trail is approximately 10’ wide (actual dimensions may vary slightly and should be field verified prior to bidding) • Completion date is May 17th, 2026 • Monday – Friday daylight hours only, any variations will be coordinated with Park Manager, Tiffany DeChant-Hunt. The total width of the trail shall be improved per the following notes, specifications, and any additionally provided information. Specifications/Scope of Work. II. Paving Project task summaryA. Review proposed work (including detours and trail closure signage) with ODNR representative to verify and mark out work limits.B. Perform any trail adjacent site work as necessary for pavement improvements. Any trees that need limbed for equipment access shall be noted with ODNR Representative and trimmed per standard arborist recommended processesC. Provide a job mix formula to ODNR prior to the start of work.D. All construction joints to be sawcut.E. Provide all traffic control required (signage and barriers) to safely detour or close the trail to traffic. Barriers shall be Type III or similar and placed to span the entire width of the trail and shall extend into the trail corridor where necessary to limit access. Coordinate trail closure and detour signage with ODNR Representative minimum 14 days prior to start of work. Notify ODNR Representative 48 hours prior to implementing closures or detours.
F. Mill existing asphalt, remove and dispose of material as specified in the documents.G. Place new asphalt per ODOT CMS as specified in these documents.H. Recondition aggregate shoulders per ODOT CMS Item 617. All adjacent shoulders shall be adjusted to meet and match finish grade of asphalt trail and slope away from the trail in such a way to create a safe and stable shoulder.I. Provide all necessary supervision, labor, equipment, and materials to successfully complete the work.J. Seal all joints and utility structures, placing grit as necessary, within 24 hours of completion of paving.K. Clean up all debris from the performance of the work.L. The Contractor shall be responsible for the preservation of all Public and Private property, per ODOT Specification 107.12. The contractor shall repair or replace any and all existing work damage during or due to the execution of the contract to equal or better condition prior to the damage, at their own expense. All said work to be repaired or replaced to the satisfaction of the ODNR Representative. Any damage to other utilities caused by the contractor shall be repaired by the appropriate utility owner at the Contractor's expense.III. General RequirementsA. The Contractor, pursuant to the contract, shall at all times comply with all applicable Federal, State and local laws governing safety and health, including Federal Construction Safety Act (Public Law 91-54) Federal Register, April 17, 1971 (Title 29, Code of Federal Regulations, Part 1518 (No Part 1926) – Safety and Health Regulations for Construction.) The Contractor pursuant to the contract shall take any other needed actions on his own responsibility, or as directed by the ODNR, as reasonably necessary to protect the life and health of personnel on the job.B. The completion date of the work shall be May 17, 2026. Requests for extensions will only be considered for delays caused by extreme weather conditions or the lack of availability of asphalt due to seasonal closure of plants.C. Maintenance and protection of traffic, including but not limited to trail users, shall be the responsibility of the Contractor. No vehicular traffic, pedestrian traffic or bicycle traffic shall be permitted in the construction limits during work or on the newly completed surface course until adequate stability has been obtained and the material has cooled sufficiently to prevent distortion or loss of fines.D. All work shall be in accordance with Ohio Department of Transportation’s Construction and Material Specifications from January 1, 2019, and include all associated supplemental specifications, unless modified by these criteria specifications.IV. Specific RequirementsA. Milling Requirements1.ODOT CMS ITEM 251 – PARTIAL DEPTH PAVEMENT REPAIR• Remove existing bituminous pavement surface, with appropriate equipment, to a depth of 1.5 inches, as located and identified by the project limits, on the specified trail in preparation for overlay with surface course.• For areas where the asphalt is damaged beyond 1.5 inches, the contractor shall mill to a depth as needed remove such damage and correct the subgrade as necessary to ensure a smooth, durable, and continuous final Completion date is May 17, 2026 • Monday – Friday daylight hours only, any variations will be coordinated with Park Manager, Tiffany DeChant-Hunt • Contractor will be responsible for site clean-up • Contractor is responsible to supply all materials needed for the serviceDelivery: Little Miami State Park coordinates: 39.361071, -84.1656864.Cell: +1 (555) 000-0000 contact@example.gov for notifications, questions, concerns.Completion/Delivery Date: May 17, 2026Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.Site Visit & Point of ContactPrior to submitting a bid response, offerors are encouraged to visit the site. Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Maps and/or Photos: Sarting point for paving project on the Little Miami Scenic Trail at 39.361071, -84.1656864. Paving south 2.02 miles. Picture of the Little Miami State Park Scenic Trail Prevailing Wage All current wage rates apply for Warren County, Ohio. View Prevailing Wage Rates | Ohio Department of Commerce The Ohio Department of Commerce, Division of Labor and Worker Safety, Wage and Hour Bureau has identified that work in this solicitation and to be performed under contract may be subject to the requirements of Ohio Revised Code Sections 4115.03 to 4115.16, Prevailing Wage. Upon award of a Contract, the successful Contractor, and all of the sub-contractors, guarantees that the prevailing wage for the area, to include any adjustments thereto, as published by the Ohio Department of Commerce, Division of Labor and Worker Safety, Wage and Hour Bureau will apply to any workman assigned by the Contractor or all of the sub-contractors to this project. The DNR representative will serve as prevailing wage coordinator and will be responsible for proper application of labor rates as required by the Ohio Department of Commerce. Responsibilities of the Prevailing Wage Coordinator include, but are not limited to; setting up and maintaining payroll reports, monitoring when payments of wages are made, receiving the Contractor’s complete payroll records of each employee, establish procedures to monitor compliance, notify Contractor of any adjustment to the prevailing wage scales and report delinquencies on the part of the Contractor. The successful supplier and all of the sub-contractors shall strictly comply with the wage provisions of the contract.Veteran-Friendly Business Enterprise ProgramThe Veteran-Friendly Business Enterprise (VBE) program provides preference or bonus points to certified companies competing for State contracts, including eligible construction services. The legal authority for the program is R.C. 9.318, while its administrative rules are found in OAC 123:5-1-01 and 123:5-1-16.The VBE program applies to all state agencies' purchases made by bid or proposal under R.C. 125. The VBE program allows for:1.Prices on bids submitted by veteran-friendly businesses to exceed those prices on bids submitted by businesses not certified as veteran-friendly by up to five percent and still be eligible for winning the award; and2.Scores on proposals submitted by veteran-friendly businesses to be up to five percent lower than the proposal scores submitted by businesses not certified as veteran-friendly and still be eligible for winning the award.Buy Ohio and Buy AmericanBuy Ohio and Buy American bid preferences are enabled by RC 125.09, RC 125.11, and OAC 123:5-1-06. These preferences permit bids containing products that are produced in Ohio or a border state, or the United States of America, to be selected for contract award even if they exceed prices offered in bids not containing Ohio, border state, or American products by no more than 5% or 6%, respectively.The awarded supplier will be required to sign an Addendum to Bid Quote or Personal Services Agreement. Example attached.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
