Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Paving and Asphalt Work

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the installation of asphalt pavement across parking lots, driveways, and access roads under a Small Business Set Aside designation, reserved exclusively for small businesses as defined by the SBA. The work falls under NAICS code 237310, which classifies it as heavy and civil engineering construction, specifically highway, street, and bridge construction. It is structured as a subcontract and is administered by the Department of Defense through the W7PA Uspfo Activity Prang 156 office. The solicitation was posted on August 4, 2026, with a firm deadline for responses on August 19, 2026, at 2:00 PM. The primary place of performance is located in Carolina, with a zip code of 00979, indicating the work is expected to occur at a U.S. military facility or associated infrastructure in that region. All proposers must be certified small businesses eligible for the set aside, and compliance with federal subcontracting requirements is mandatory.

General Info

Small business set aside for asphalt pavement installation at Carolina military facility under DoD subcontract.

Agency

Department Of Defense → W7PA Uspfo Activity Prang 156View Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Carolina, PR, 00979, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7PA Uspfo Activity Prang 156
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W7PA Uspfo Activity Prang 156
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of asphalt pavement for parking lots, driveways, and access roads.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.
Waterfront Project Management

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Unit Price Portwide 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haul and disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and drainage system enhancements. All work requires adherence to performance standards and may involve obtaining necessary permits for improvements to public infrastructure. This procurement is issued under the title Asphalt Paving & Striping Unit Price Portwide 2026 by the Port Construction Services division of the Port of Seattle. The solicitation is posted as a forecast with a NAICS code of 237310 indicating highway and street construction. Primary point of contact is Heather Bowden, with Lesley Miles serving as project manager; inquiries should be directed via their provided email addresses and phone numbers. The contract will be administered across numerous port-wide sites with performance expected to meet specified technical and safety requirements, though no specific location details are provided in the data. The forecast date of July 31, 2026, suggests this is a planning notice for future work, not an active solicitation.
Port Construction Services

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
NCMT Berth 24-11 Structural Repair
Solicitation # ncmt-berth-24-11-structural-repair-0
The project involves the rehabilitation of the existing concrete marginal wharf at National City Marine Terminal Berth 24-11 in San Diego, California, along with the reinstallation of the shore power system, as detailed in the contract drawings and specifications. The scope encompasses a wide range of specialized tasks including demolition, asbestos and lead abatement, contaminated soil removal, concrete coring and saw cutting, underwater pile jacket installation, diving services, electrical and utility work, storm drain upgrades, and miscellaneous metal fabrication. Numerous subcontracted services are required to support the main effort, including environmental monitoring, LIDAR surveys, materials testing, timber disposal, and water utility coordination. The work is being executed under the auspices of the San Diego Unified Port District with Kiewit Infrastructure West Co. serving as the prime contractor, managing the solicitation and coordination of qualified subcontractors and suppliers. Bidders must comply with a strict set of eligibility criteria, including possession of a valid California Contractor’s License and current registration with the Department of Industrial Relations. All firms performing onsite work are required to be signatories to collective bargaining agreements with key trades—carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters—and must adhere to the project’s Project Labor Agreement. Additionally, responsible subcontractors and material contractors must provide bonding equal to 100% of their contract value, with Kiewit agreeing to reimburse bond premiums. Insurance requirements are mandatory and must meet acceptable standards. The contract actively seeks participation from Disadvantaged Business Enterprises, Disadvantaged Veteran Business Enterprises, Minority Business Enterprises, and Woman Business Enterprises, with certification documentation required from recognized authorities such as the SBA, DOT’s DBE program, or state and private certification bodies. All bids must be submitted via Kiewit’s BuildingConnected platform in response to an Invitation to Bid, with a hard deadline of August 6, 2026, at 2:00 p.m. Proposals are subject to pass/fail evaluation on licensure, DIR registration, insurance, and labor compliance; no weighted scoring system is outlined, and award will be made to responsive and responsible bidders meeting all mandatory requirements. Plans and specifications are available upon request at Kiewit’s office in Santa Fe Springs, California.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
The CITY OF SHAW, BOLIVAR County, Mississippi, will receive bids for the removal, reconstruction, and installation of ADA/PROWAG compliant sidewalks along the southbound lane of US 61 S and Rogers St. for a total project length of 0.34 miles, Federal Aid
Solicitation # 3170036398
The City of Shaw in Bolivar County, Mississippi, is soliciting bids for the removal, reconstruction, and installation of ADA and PROWAG compliant sidewalks along the southbound lane of US 61 S and Rogers Street, covering a total distance of 0.34 miles. This federally funded project aims to improve pedestrian accessibility and safety in accordance with federal standards and is part of a larger initiative to enhance infrastructure under federal aid programs. Bidders must be prepared to meet all regulatory and design requirements for universal accessibility, including proper ramp slopes, detectable warning surfaces, clear pathways, and appropriate signage. The solicitation, identified by number 19-20260727131154 Shaw, was posted on August 4, 2026, with proposals due by September 1, 2026. The contracting authority is the Mississippi Department of Transportation’s Mississippi Public Transportation Assistance Program (MPTAP), and the work is to be performed entirely within the state of Mississippi. Interested parties must review the full solicitation details through the provided official link to ensure compliance with all technical specifications, submission guidelines, and contractual obligations. Only qualified contractors with experience in public infrastructure projects and ADA compliance will be considered.
MPTAP

POSTED

about 22 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Department Of Defense → W7PA Uspfo Activity Prang 156

Same awarding agency

NAICS: 332911
New
Federal
Replace Water Line Valves
Solicitation # W50S9326QA013
The 156th Wing at Muniz Air National Guard Base in Carolina, Puerto Rico is seeking a single firm-fixed-price contract under FAR Part 12 commercial services procedures to replace three failing main water distribution valves located 4 to 7 feet below ground. The scope includes full excavation, removal, installation of new valves, backfilling, compaction, and complete site restoration to ensure continued operational integrity of the base's water system, all to be completed within 30 calendar days after contract award, inclusive of inspections and punch list resolution. Work must strictly adhere to the Statement of Work and referenced technical standards including ASTM D1557 and D698 for soil compaction, UFC 3-230-01, UFGS Division 33 33 11 00, NFPA 24, and OSHA excavation safety regulations, with mandatory hydrostatic pressure testing at 150 PSI and negative bacteriological results prior to system reactivation. The procurement is a 100% small business set-aside under NAICS code 332911 with a size standard of 750 employees and a government target price range below $25,000, with award to be made without negotiations to the most advantageous offer considering price and other factors. All offerors must be registered in SAM.gov, a process requiring a notarized letter and taking up to 15 business days, and must submit a completed SF 1449 with all pricing, equipment lists, and proposed schedules via email by August 19, 2026 at 10:00 AM AST. A mandatory site visit is scheduled for August 11, 2026, requiring advance registration with valid photo ID, vehicle registration, and proof of insurance, as access to the secure Air Force installation is strictly controlled with no firearms permitted. RFIs must be submitted by August 13, 2026, and all communications must be in English. Contractors will be subject to stringent security protocols, including compliance with DoD PIV standards, submission of a Safety Plan and Health and Safety Plan within 10 days of award, completion of mandatory antiterrorism training, and adherence to an approved Waste Management Plan. All deliverables, including soil compaction reports, asphalt and concrete mix designs, and a one-year warranty certificate, must be submitted, and final acceptance requires Government inspection by the designated representative
Industrial Valve Manufacturing

POSTED

1 day ago

DEADLINE

in 14 days
View Details