Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Paving and Curb/Gutter Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Buena Park involves the installation of internal roads, driveways, and concrete curbing for residential infill projects. The scope of work includes sub-grade preparation, asphalt paving, and the pouring of concrete curbs and gutters specifically for a condominium complex to deliver a complete internal road network and parking areas. The project falls under NAICS code 237310 and is scheduled for posting on June 12, 2026. All performance activities will take place within Buena Park, California, supporting prime contractors in the completion of these essential infrastructure elements.

General Info

Subcontract for road, driveway, and curbing installation for Buena Park residential infill projects.

Agency

California → City of Buena Park

Place of Performance

Buena Park, CA

Set-Aside

NONE

Documents

This scope was carved out of TT-25-3.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tentative Tract Map No. TT-25-3

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Buena Park
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Buena Park
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs internal roads, driveways, and concrete curbing for prime contractors on City of Buena Park residential infill projects. Performs sub-grade preparation, asphalt paving, and pouring of concrete curbs and gutters for a condominium complex. Delivers a completed internal road network and parking areas.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed construction. Additional requirements encompass support services like traffic control, site security, and storm water pollution prevention, along with the supply of materials such as precast concrete, ready mix, and cathodic protection. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, WBE, and OBE certifications. To be considered, responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system, with primary coordination handled by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
The California Department of Transportation has issued solicitation 08-1N8804 for a construction project on State Highway Route 62 in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and has an estimated cost of 3,530,000 dollars. Primary work includes the installation of hot mix asphalt, imported borrow, and the implementation of signal and lighting systems. Technical requirements specify the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and wrong-way alerts, with network equipment integrated into the Inland Empire Transportation Management Center following IEEE 802.3 and NEMA TS-1/TS-2 standards. Bids must be submitted on a unit price basis by December 2, 2026. The contract mandates strict adherence to Buy America requirements under 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing DVBE quotes and adhering to prevailing wage rates determined by the California Department of Industrial Relations. Quality assurance involves source testing for service equipment and operational performance tests for network latency and bandwidth. Additionally, contractors must provide certifications from a registered civil engineer or professional geologist regarding the pH and lead levels of local materials used.
California Department of Transportation

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County About 8 Miles South Of Willits From 0.2 Mile North Of Ridgewood Ranch Road To 0.4 Mile South Of Black Bart Road
Solicitation # 01-OL3804
Solicitation 01-0L3804 is a cost-plus-time basis contract issued by the California Department of Transportation for highway construction on Route 101 in Mendocino County. The project is located approximately 8 miles south of Willits, extending from 0.2 mile north of Ridgewood Ranch Road to 0.4 mile south of Black Bart Road. With an estimated project cost of 13.7 million dollars, the scope of work includes roadway excavation, the placement of Hot Mix Asphalt and High Friction Surface Treatment, and the installation of Asphalt Concrete Pavement and concrete barriers. Additional infrastructure deliverables include concrete curbs, sidewalks, railings, fences, and the implementation of a comprehensive traffic control system. The project is governed by 2025 Standard Specifications and Standard Plans, with project-specific plans approved on June 9, 2026. Key compliance requirements include adherence to Buy America/Build America for manufactured products, the submission of a Lead Compliance Plan, and the use of LCPtracker Pro for electronic certified payroll records. Performance is subject to strict environmental and safety constraints, including a restricted work window for drainage channels from June 15 to October 15. Quality assurance involves source inspections for equipment and independent laboratory testing for materials, with final acceptance of the High Friction Surface Treatment managed by the Department. Bids for this solicitation open on December 8, 2026.
California Department of Transportation

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Santa Barbara County Near Santa Ynez From 0.1 Mile North Of Route 246 To 0.1 Mile South Of Route 246
Solicitation # 05-1R5704
Solicitation 05-1R5704 is a unit price construction contract issued by the California Department of Transportation for lighting, striping, and signage upgrades on State Highway 154 in Santa Barbara County, specifically from 0.1 mile north to 0.1 mile south of Route 246. The project scope includes micro-surfacing, tack coat application, extensive pavement delineation with thermoplastic stripes and markers, and the installation or relocation of roadside signs and flashing beacon systems. Additionally, the work involves the installation of Cast-In-Drilled-Hole concrete piles and the implementation of erosion control measures such as hydroseed and compost. Comprehensive temporary traffic control, including portable radar speed feedback signs and changeable message signs, is required to manage traffic flow. The estimated project cost is 820,000 dollars, with a performance period of 50 working days. Bids must be submitted electronically via the Bid Express website by 2:00 p.m. on November 19, 2026, and must include bidder security of at least 10 percent of the bid. The contract mandates adherence to Buy America/Build America standards, DIR general prevailing wage rates, and specific environmental product declarations for concrete and asphalt. Quality assurance requires QC personnel to hold ACI Concrete Field-Testing Technician Grade 1 certification and mandates strict adherence to NAD 83 and NAVD 88 survey accuracy standards. The project also emphasizes participation from Small Businesses and Disabled Veteran Business Enterprises.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

POSTED

about 5 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS