Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 6, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PAVING SUWON AIR BASE

Awarded
W90VN6-17-R-0041Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP# 2027022 is a unit price solicitation issued by the Spartanburg County Government in South Carolina for the Twin Tier 3 Subdivision Reclamation project, specifically focusing on Group 1, which includes the Timberlake and Wicklow areas. The scope of work involves roadway improvements and reclamation, with key pay items including the removal and disposal of existing asphalt pavement, the application of maintenance stone, 8-inch full depth patching, and wrecker services. Technical specifications require adherence to SCDOT Standard 401.3.19.2, specifically mandating the use of a sloped edge longitudinal shoulder joint attachment for all surface mixtures placed at 150 lb/sq yd or greater to ensure a consolidated wedge-shaped pavement edge between 25 and 35 degrees. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain statutory worker's compensation and commercial general liability insurance of at least $1 million, naming Spartanburg County as an additional insured. Proposals must be binding for 60 days and are subject to the South Carolina Freedom of Information Act. Award eligibility is contingent upon the proposer's certification of non-debarment by the State of South Carolina, compliance with federal civil rights and labor laws, and the absence of conflicts of interest. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments.
Spartanburg County Government

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-40 Capital Connector Construction Project
Solicitation # 2026-40
The City of Charleston, West Virginia, is soliciting bids for the Capital Connector Construction Project, a multimodal corridor improvement initiative funded by a federal RAISE grant. The project aims to transform approximately 3.25 miles of Kanawha Boulevard East (US Route 60) from Magic Island to the 35th Street Bridge, along with 0.25 miles of safety upgrades on Greenbrier Street, into a complete street. The scope of work includes roadway lane reductions, the widening of shared-use paths from 4-6 feet to a maximum of 16 feet, protected intersection improvements, signal modifications, and the installation of bioswale systems and new storm inlets. All work must adhere to WVDOH Standard Specifications, ADA Section 504, and PROWAG accessibility standards. Eligible bidders must be listed on the West Virginia Division of Highways Prequalified Contractors List and must not be delinquent in Business and Occupation taxes or owe more than 1,000 dollars to the state or its political subdivisions. The project has a performance period of 548 calendar days from the Notice to Proceed. Bidders are required to submit electronic bids via BidExpress.com by December 3, 2026, and must have attended a mandatory pre-bid meeting on October 29, 2026. A bid bond of 5 percent is required at submission, with performance and labor/material payment bonds of 100 percent required upon award. Because of the federal funding, the contract is subject to stringent federal requirements, including the Build America Act, Buy America regulations for iron and steel, and the Davis-Bacon Act for prevailing wages. Contractors must submit weekly certified payrolls and provide a signed Buy America Certification. Additionally, the project requires compliance with Title VI of the Civil Rights Act and NEPA environmental commitments. The City of Charleston will conduct final inspections and requires a minimum of 1,000,000 dollars in commercial general liability insurance per occurrence.
City of Charleston

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Department of Defense, through the 411th Contracting Support Brigade, Korea, issued solicitation W90VN6-17-R-0041 for the construction of an asphalt pavement parking lot at Suwon Air Base. The contractor is responsible for providing all labor, tools, equipment, and resources necessary to complete the project within a performance period of 210 days from the notice to proceed. All work must adhere to OMAF specification 2014 revision 1 (2015) and the provided technical drawings, with the contractor required to submit shop drawings following the award. The scope of work primarily involves civil engineering tasks, including the construction of approximately 4,800 square meters of asphalt pavement with specific subgrade, base course, and sub-base course thickness requirements. Additional project features include the application of 121 square meters of pavement markings, the installation of 70 vehicle wheel stops, solid sodding of disturbed un-paved areas, the installation of eight grounding posts in coordination with the 35th ADA, and the placement of 90 plastic bollards. The contractor is also responsible for the disposal and hauling of all waste material off the base.

General Info

Contract Value

$224,189.82

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Suwon Air Base 수 원 공 항 Jangji-dong, Gwonseon-gu, Suwon-si, Gyeonggi-do, Suwon, AP, KOR

Set-Aside

NONE

Award Issued Date

Documents

3

Drawings for WNHQ 17-5101 - Construct Asphalt Pavement Parking Lot (Suwon AB)

PDF, High priority: read this firstspecifications
High

Solicitation W90VN6-17-R-0041: Construct Asphalt Pavement Parking Lot

PDF, High priority: read this firstrfp
High

Entry Authority List

XLS, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0906 Aq Co Contracting Bat
Contacts2 people available
OfficeAPO, AP, 96202-0000, USA
Office AddressAPO, AP, 96202-0000, USA
Contacts

Full Description

Show more
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions contained herein. (1) The contractor shall provide shop drawings after award of the contract. (2) Contract performance period will be 210 days from the notice to proceed. (3) All work shall be completed by OMAF specification 2014 revision 1 (2015) and attached drawings. (4) The contractor shall request, in writing, the release of these facilities no less than 30 days prior to the start of work scheduled for the buildings. b. PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features: 0001. CIVIL WORK A. Asphalt Pavement A.1. EARTH/PLACING ASPHALT CONCRTE WORK 1. Construct approximately 4,800 square meters of asphalt pavement parking lot including subgrade preparation, minimum 127 millimeters thickness of base course, minimum 400 millimeters thickness of sub-base course, prime coating and tack coating work, asphalt pavement finishing, and compacting work as shown on the drawings. 2. Dispose and haul waste material off the base. B. PAVEMENT MARKING 1. Apply approximately 121 square meters of pavement marking for parking lot area as shown on the drawings. C. CAR WHEEL STOP 1. Install seventy (70) of vehicle wheel stops including form work, re-bars work, concrete work with finishing, and curing & protection work as shown on the drawings. D. SOLID SODDING 1. Apply the solid sodding on disturbed un-paved area around new pavement parking lot area as shown on the drawings. E. GROUNDING WORK 1. Install the eight (8) of new grounding post as shown on the drawings. Coordinate with 35th ADA for the grounding location before installing. F. PLASTIC BOLLARDS 1. Install the ninety (90) of plastic bollards as shown on the drawings. SITE VISIT An organized site visit has been scheduled for-- 1000 Hrs, 17 AUG 2017 Participants will meet at-- Suwon Air Base Walk-In Gate ? ? ? ? Jangji-dong, Gwonseon-gu, Suwon-si, Gyeonggi-do Site visits may be arranged during normal duty hours by contacting: Name: CPT Voglezon, Royston S. Email Address: royston.s.voglezon.mil@mail.mi Telephone: 031-661-1148 Offerors who intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit Clause FAR 52.236-27 Alt I. Offerors are required to have a valid Korean Identification card when attending the site visit orientation. Offeror shall submit the following information to CPT VOGLEZON, ROYSTON S. royston.s.voglezon.mil@mail.mil by 14:00 hours, 10 AUG 2017 for temporary access. Offerors who do not RSVP by 10 AUG 2017 will not gain access to Suwon Air Base. Attendees are encouraged to be early, late arrivals will not gain access to Suwon Air Base. Offerors shall complete the attached Entry Authority List no later than 14:00 hors, 10 AUG 2017. Those who do not submit Entry Authority List will not gain access to Suwon Air Base.

More opportunities from Department Of Defense → 0906 Aq Co Contracting Bat

Same awarding agency

NAICS: 561790
New
Federal
Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey.
Solicitation # W90VN827RA001
Solicitation W90VN827RA001 is a firm-fixed-price requirement for the cleaning of food service exhaust systems, including hoods, ducts, and rooftop fans, at dining facilities within USAG Yongsan-Casey in Dongducheon, South Korea. The primary objective of the contract is to mitigate fire hazards caused by grease accumulation, with all work performed in accordance with NFPA 96 and Army Regulation 420-1. The scope includes providing all necessary personnel, equipment, and materials, as well as supplying parts for both preventive and demand maintenance orders. Performance is scheduled by frequency for specific buildings listed in the technical exhibits, and the contract includes a phase-in period with a required transition plan to be submitted within ten business days of award. Proposals are due by October 15, 2026, and must be submitted via the PIEE Solicitation app in three separate volumes covering technical approach, past performance, and price. Award will be granted to the responsible offeror deemed most advantageous to the government based on registration certifications, key personnel, past performance, and price reasonableness. Notably, offerors must possess valid ROK Government business licenses per the SOFA agreement and maintain active SAM registration. Contract administration requires the use of the Wide Area Workflow system for electronic invoicing and payment, while contractor personnel must adhere to strict installation security protocols, including DoD Cybersecurity Awareness Training and vehicle registration.
Other Services to Buildings and Dwellings

POSTED

4 days ago

DEADLINE

in 2 days
View Details
NAICS: 811310
New
Federal
Fuel Tank Inspection
Solicitation # W90VN626QA018
Solicitation W90VN626QA018 is a request for quotations for fuel tank inspection, testing, and maintenance services at Osan Air Base, Republic of Korea. The scope of work includes monthly and annual inspections of 369 active aboveground and underground storage tanks, emergency service calls, and repair services. The contract is structured as a Firm-Fixed-Price award consisting of a base year from January 1 to December 31, 2027, with four subsequent option years extending through 2031. This requirement is conducted under the Logistics Cost Sharing program and is funded by the Republic of Korea Ministry of National Defense, meaning the U.S. Government incurs no financial liability. The award will be based on a best-value comparative evaluation of four factors in descending order of importance: a practical demonstration via a mock inspection, technical factors including approach and staffing, past performance, and price. Offerors must meet strict eligibility requirements, including specific ROK business registrations for fuel tank maintenance and mechanical facility construction, and must provide key personnel such as an STI SP001 Certified Inspector and a licensed Contract Manager. All quotes must be submitted in English via the PIEE Solicitation Module by October 28, 2026, divided into four separate volumes covering technical, past performance, price, and administrative documentation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 7 days
View Details
NAICS: 332999
New
Federal
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Solicitation # W90VN626QA017
Solicitation W90VN626QA017 is a commercial acquisition conducted under the Logistic Cost Sharing program for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier systems and associated Access Control Point control systems at the Morin and Main Gates of Osan Air Base, Republic of Korea. The contractor is responsible for the demolition and disposal of existing barriers, all necessary civil and electrical site work, and the complex reprogramming of Programmable Logic Controllers to ensure synchronized, fail-safe operations across multiple gatehouses and inspection centers. Technical requirements specify that equipment must meet ASTM F2656-20 standards, with minimum ratings of H30/P1 for the Morin Gate and M50/P1 for the Main Gate. The project includes a 240-day performance period with an estimated completion date of July 30, 2027. The government will award a firm-fixed-price contract based on best value, prioritizing the lowest-priced offer that is deemed technically acceptable with an acceptable past performance rating from the last five years. Key submission requirements include a material supply and technical support agreement from an authorized domestic supplier and manufacturer certification for installers. All quotes must be submitted electronically via the Procurement Integrated Enterprise Environment by the extended closing date of October 29, 2026, at 1300 hours KST. Notably, this contract is funded by the Republic of Korea Ministry of National Defense, meaning no U.S. government funds are obligated, and contractors must certify tax exemptions under the US-ROK SOFA.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

5 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS