This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on February 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Payette NF Disaster Relief Fence Reconstruction
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the reconstruction and replacement of approximately 11.2 miles (59,183 feet) of range fences on the Boise National Forest that were destroyed by the 2024 Lava Fire. These fences are critical for managing livestock on the Payette C&H allotment and preventing unauthorized grazing from neighboring areas. The work encompasses three existing boundary fences: the Mill Creek Summit Boundary Fence, Thirdfork Boundary Fence, and Payette-Ola C Boundary Fence, with existing cattle guards to be retained and reconnected. Materials for the fence reconstruction are to be supplied by the contractor, and the fences must be built according to specified construction standards. The project is located in remote sections of the Boise National Forest with limited road access and equipment staging, requiring all clearing and disturbance to stay within a 20-foot buffer zone along the fence line, with minor deviations allowed to avoid natural obstacles while preserving live trees. Use of small equipment such as skid steers, ATVs, and UTVs is authorized within the buffer when practical. Special environmental protections include total avoidance of threatened plant species like the White Bark Pine, with strict prohibitions on attaching fences to trees. Additionally, any discovery of cultural or heritage resources during construction requires immediate work suspension and consultation with forest heritage staff. This contract is a total small business set-aside under NAICS code 238990, issued by the Department of Agriculture's Payette National Forest office in Idaho, with a proposal deadline of March 4, 2026.
General Info
Place of Performance
ID, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The 2024 Lava Fire on the Boise National Forest destroyed several range fence improvements that are vital to managing livestock on the Payette C&H allotment as well as preventing unauthorized or excess livestock use from the neighboring Payette National Forest and Ola C C&H allotment. In total, approximately 59,183 feet, or 11.2 miles, of fence needs to be reconstructed/replaced. This is in accordance with analysis completed in the 2025 Lava Post Fire EA.
The project is split between three prior existing fences that were destroyed by wildfire, the Mill Creek Summit Boundary Fence (23,545’), the Thirdfork Boundary Fence (17,181’), and the Payette – Ola C Boundary Fence (18,457’). All fences incorporate existing cattle guards which remain in place and do not require additional work aside from connecting the fence.
This project is for the reconstruction/replacement of the fences including materials provided by the contractor. All fences will be of the same construction, following the specifications below. Work is to be conducted in remote sections of National Forest Land on the Boise National Forest and will have limited road access or equipment staging areas. Soil type and depth to rock will vary across the project area. All work and disturbance is to be confined within a 20-foot buffer,10 feet on either side of the designated fence path. Clearing the buffer area of minor obstructions, such as downed trees or branches, is allowable. No live trees should be cut. Minor deviation from the designated fence path is allowed where necessary to avoid timber, rock out crops, or other larger obstructions. Access and use of small equipment, i.e. skid steers, ATVs, UTV, etc. is authorized within the buffer area where practical.
Total avoidance of threatened or endangered vegetation species, including White Bark Pine, Pinus albicaulis, is required. At no point should fences be secured to trees in any fashion. If at any point cultural/heritage resources are discovered, all work shall cease until forest heritage staff can be consulted.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
