Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PDB Liberty Lake and MeadowWood Golf Course Maintenance Facility

Closed
26-10352State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Spokane County is seeking qualified design-build teams to deliver a progressive design-build services contract for a new 6,000-square-foot maintenance facility shared between the Liberty Lake and MeadowWood Golf Course operations, with an estimated total project budget of $4 million. Solicitation number 26-10352, posted on June 22, 2026, requires submission of Statements of Qualifications by July 15, 2026, and targets firms with demonstrated experience in integrated design-build delivery under the Modified DBIA 544 progressive model. The project includes demolition of the existing structure, site improvements such as paving, security fencing, stormwater upgrades, and full construction of a new facility, along with training for operations staff and warranty services. Contract administration follows an open-book cost model, requiring the design-builder to maintain GAAP-compliant accounting systems and allow the owner full audit rights to all records for six years after final payment. Invoicing is monthly and subject to a joint review and approval process between the design-builder and owner, with payment due within 30 days of a properly submitted application. The guaranteed maximum price is set at $3 million for construction and related services, with an additional $1 million allocated for soft costs, and fees are subject to adjustment if the final negotiated GMP exceeds the budget by more than 10%. Award will be determined on a weighted scoring model totaling 150 points, combining qualifications and price factors: team and staff qualifications, past performance, company proximity, and small or disadvantaged business participation account for 45 points; fee percentage is scored inversely relative to the lowest conforming bid; interactive meetings and management plans contribute 45 and 35 points respectively, representing critical evaluation steps in the selection process. A mandatory pass/fail gate requires verification of contractor status through Exhibit A, which includes legal name, entity type, Washington UBI, and DUNS number. Proposers must be registered with the Washington State Department of Labor and Industries, carry industrial insurance, and attest to compliance with prevailing wage rules, non-discrimination policies, and no conflicts of interest with county staff. All contracts require performance and payment bonds issued by sureties rated A/IX or higher by A.M. Best, with insurance maintained for one year after substantial completion and the owner named as an additional insured. The design-builder must assign a full-time safety representative to conduct daily site inspections and weekly safety meetings, and utilize an integrated team with a design

General Info

Spokane County seeks design-build team for shared maintenance facility in Washington, SOQ due July 15, 2026.

Agency

Washington → Spokane CountyView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(3)

Spokane County Progressive Design-Build Contract RFQ Final

PDFcontract-document

RFQ 26-10352 Progressive Design-Build Services for Liberty Lake and MeadowWood Golf Course Maintenance Facility

PDFrfq

Spokane County Progressive Design-Build Contract General Conditions

PDFcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Spokane County
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → Spokane County
View Agency Profile
Office AddressN/A

Full Description

Show more
The purpose of this Request for Qualifications (RFQ) to solicit Statements of Qualifications (SOQs) from experienced designers and contractor teams to perform (progressive) design-build services for the new Maintenance Facility shared between Liberty Lake and MeadowWood Golf Course.

More opportunities from Washington → Spokane County

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS