Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Peabody Reservoir Overflow Building Remodel

Open
State & Local
Solicitation #
CON-2018-38

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract awarded to Cascade Industrial Services, LLC by the City of Port Angeles, Washington, involves the Peabody Reservoir Overflow Building Remodel (Project Number CON-2018-38), with a firm fixed price of $26,941.29 following a competitive bidding process held on October 30, 2018. The project’s scope includes structural repairs and upgrades outlined in Attachment A, such as replacing ceiling materials with pressure-treated lumber, installing a new blue metal roof matched to existing conditions, replacing two window casements with brown vinyl double-pane units, and constructing a reinforced galvanized diamond plate metal deck over the vault designed to support a 300 lb/sq ft live load with a lockable hatch. Existing security grates are to be removed and replaced with black grated enclosures. The work must adhere to the Washington State Department of Transportation’s 2018 Standard Specifications for Road, Bridge, and Municipal Construction as supplemented by project-specific provisions, and comply with all applicable federal, state, and local laws. The contract includes standard provisions for contractor responsibilities such as ensuring work safety, correcting defects, and maintaining compliance with wage payment statutes, nondiscrimination policies, and prevailing wage requirements. The contractor must submit certified payrolls, material acceptance documentation, and other closeout certifications. The period of performance begins 10 calendar days after the Notice to Proceed and requires completion within 30 working days. The City of Port Angeles conducts inspection and acceptance of the work at project-designated locations and reserves the right to withhold payments until contractual requirements are satisfied. Payment is processed via City warrant within 30 days of invoice receipt, with invoices requiring reference to the City’s contract number and adherence to the Contractor’s Application for Payment format. The award was based on the lowest responsible and responsive bid meeting all mandatory compliance requirements. No federal FAR clauses are included, and no special contract options or OCI provisions appear in the documentation. The solicitation allowed bid submission via hard copy, mail, fax, or email, with an estimate range between $25,000 and $30,000 and incorporated an addendum to clarify bidding instructions.

General Info

Cascade awarded $26,941 for Peabody Reservoir remodel with structural repairs, compliance, and 30-day completion.

Documents

3
PDF, High priority: read this first4 pages · rfq
High
PDF, High priority: read this first36 pages · contract-document
High
PDF, Low priority1 page · bid-tabulation
Low

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 3 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Port Angeles
Contacts1 person available
OfficeN/A

Full Description

Show more
Award to Cascade Industrial Services, LLC for $26,941.29 by City Council November 20, 2018. Bid tabulation attached!
Addendum # 1 is issued!
Bids must be received no later than 2:00 PM, Tuesday, October 30, 2018.   Estimate range: $25,000 to $30,000.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
The Design-Build Major Maintenance and Repair (M&R) project for U.S. Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin, is a firm fixed-price task order issued under the NMACC III IDIQ. The project is estimated between $5 million and $10 million, with a projected period of performance of 350 calendar days from the notice to proceed. The scope of work includes base work for remodeling the Sector Command Center, building envelope repairs, and HVAC reconfiguration, with optional items for roof and boiler replacement at the Station/UPH Building. Key technical requirements include the creation of Classified Work Spaces (CWS) that must meet specific certification and security standards, as well as compliance with the EM 385-1-1 safety manual and various international building and mechanical codes. The contract is open to the NMACC III Small Business Pool East, though no specific set-aside status is designated in the contract data. Award will be granted to the lowest total priced responsive offeror, with price evaluations based on fairness and reasonableness. Proposals must be submitted via email to the contract specialist by December 17, 2026. The contractor is responsible for providing performance and payment bonds within 10 business days of award and must adhere to the Buy American Act and strict cybersecurity protocols regarding portable electronic devices within classified areas. All invoicing must be processed through the Invoice Processing Platform (IPP).
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new vanities and lavatories, and updating doors and life-safety components. Additionally, the project involves installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation components, upgrading lighting controls, and correcting plumbing deficiencies. The project also includes general interior repainting and the installation of new signage throughout the facility. This solicitation, number 70LGLY27RSSB00001, is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. The contract requires both payment and performance bonds, though a bid bond is not required. The project is subject to the Davis-Bacon Act and must adhere to ADA accessibility guidelines and Buy American requirements. Proposals must be submitted electronically to the Contracting Officer by the deadline of December 02, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project covers site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated cost is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary exhibit line items: building renovation and the removal and replacement of paving. Award will be based on the lowest price. Proposals are due by December 2, 2026, at 2:00 PM. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for proposals of $150,000 or more. Key personnel requirements include a stand-alone Quality Control Manager, though the Superintendent and Site Safety and Health Officer roles may be combined if the individual is qualified for both. The contract is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This is a Design-Build, Firm Fixed-Price contract for the repair of fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, located at the Puget Sound Naval Shipyard in Bremerton, Washington. The contractor is responsible for providing all labor, materials, equipment, and supervision to produce final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures. Key technical objectives include resolving a Risk Assessment Code Level 4 deficiency by extending sprinklers to Building 719, installing backflow preventers for the 6-inch diameter wet pipe sprinkler system risers in the basement, and ensuring elevator pit sprinkler control valves are locked open and monitored by the fire alarm system. The project has an estimated value between $1 million and $5 million, with a period of performance of 440 days from the date of award. This procurement is an 8(a) Multiple Award Construction Contract set-aside. Proposals are due by December 16, 2026, and must be submitted via the Procurement Integrated Enterprise Environment portal. The basis for award is Price Only with MACC Past Performance, evaluated based on a single Contract Line Item Number. The contractor must adhere to strict security and safety protocols, including cybersecurity standards per UFC 4-010-06 and governmental safety requirements. Deliverables include design data, test reports, final as-built record drawings, and operation and maintenance manuals. Performance verification will be conducted through field inspections and testing certified by the Designer of Record and Commissioning Authority.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. The project has an estimated construction magnitude between $10 million and $25 million and is managed by NAVFAC Northwest. The scope of work involves a critical two-phase renovation that requires the facility to remain operational and mission-capable throughout the process. Phase 1 encompasses all general renovations and the completion of design documents for both phases, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. Additional requirements include the construction of a 400-square-foot forklift battery charging facility and upgrades to HVAC, fire protection, and electrical systems. The project is subject to strict scheduling and security protocols, necessitating multiple mobilization and demobilization cycles. Award is based on price and MACC past performance, with proposals due by December 7, 2026, via the PIEE portal. The contractor must adhere to various federal and military standards, including USACE EM 385-1-1 for safety and DFARS cybersecurity requirements. Key administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with the Davis-Bacon Act for certified payrolls. No specific set-aside status is designated for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of the 1963 LBJ building at the Atterbury Job Corps Center in Indiana, operated by Adams and Associates, Inc. The project is necessitated by persistent leaks, missing shingles, and storm damage. The contract is a small business set-aside, open to SBA certified Small Businesses, Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. A mandatory site visit is scheduled for December 3, 2026, and proposals must be submitted by December 14, 2026. The award will be based on best value, evaluating price, quality, past performance, and schedule, with a focus on a responsible contractor providing the lowest reasonable price. Bidders must submit a single lump sum bid with a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Requirements include a valid Indiana contractor's license, compliance with EPA and OSHA regulations, and adherence to Davis-Bacon Act wage determinations. The selected contractor must provide a one-year workmanship guarantee and a two-year manufacturer's product warranty. Payment terms are Net 30, and the contractor must maintain specific automobile liability and workers' compensation insurance, naming Adams and Associates, Inc. as an additional insured.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 square foot laboratory and office facility featuring a steel frame, shallow foundation, masonry and metal panel exterior walls, and a standing seam roof. Additional requirements include comprehensive site improvements such as landscaping, parking, exterior lighting, and an underground stormwater retention system. Option 1 specifically covers the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. The contract is set aside for Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran Owned Small Business (VOSB), and Service-Disabled Small Business. Pricing is requested for various trades including demolition, abatement, structural steel, mechanical, electrical, and plumbing. The project is exempt from sales tax and adheres to Davis Bacon Wage Rates. Interested parties should coordinate with Rahul Maheshwari at J&J Contractors, Inc. to receive bid invitations and documents via Building Connected.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with all local, state, and federal building codes, while reusing existing push bar and closure systems. The contractor is responsible for verifying all dimensions and layouts and must adhere to EPA and OSHA regulations. This is a small business set-aside available to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Proposals must be submitted as a single lump sum with a detailed cost breakdown and are due by December 11, 2026. A mandatory site visit on December 1, 2026, is required for bid consideration. Award will be based on best value using a 100-point evaluation system covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The contract features net 30 payment terms, and the contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work must commence within 14 days of proposal acceptance, and a sequenced construction schedule must be provided within 10 days of the Notice to Proceed.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS