Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Peak Park Water Well Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Peak Park Water Well Project is a municipal infrastructure initiative led by the City of Buena Park Public Works Department to construct a new water production well and associated facilities within William Peak Park. The project aims to establish a municipal-supply well with a targeted operational production rate of 3.6 million gallons per day, or 2,500 gallons per minute, depending on aquifer availability. Key infrastructure components include a 2,000-square-foot pump house building designed to accommodate future development such as a buried reservoir and water treatment area, a 12-inch-diameter water line along El Coco Way and El Dorado Drive, a 902-foot, 30-inch pump-to-waste drain line, and a new off-site service road connecting the site to El Coco Way. The technical scope involves complex drilling operations, including the installation of a 42-inch conductor casing and a pilot hole reaching depths of approximately 1,300 feet below ground surface, followed by specific reaming and casing installations using high-strength low alloy steel. The project must adhere to rigorous standards, including the California Water Well Standards, the California Water Code, and American Water Works Association standards. Environmental reviews conducted under the California Environmental Quality Act (CEQA) have identified potential impacts on biological, cultural, geological, and hydrological resources, for which mitigation measures have been established. The estimated preliminary construction cost for the well is approximately $2,246,000, covering mobilization, drilling, geophysical logging, aquifer testing, and mechanical development.

General Info

City of Buena Park will build a water production well for $2,246,000.

Agency

California → City of Buena Park

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

El Coco Way and El Dorado Drive, Buena Park, CA, 90620

Set-Aside

NONE

Documents

(5)

2025100619_SWRCB_Comment Letter on IS/MND for Peak Park Water Well Project

PDFcomment-letter

Peak Park Water Well Project Initial Study and Mitigated Negative Declaration

PDFinitial-study-mnd

NOI for Peak Park Water Well Project IS/MND

PDFnotice-of-intent

SCH Submittal Form for Peak Park Water Well Project

PDFother

Notice of Completion for Peak Park Water Well Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Buena Park
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Buena Park
Office AddressN/A
Contacts
Jason TranAssociate Engineer
Jennifer MarksProject Manager

Interested Companies (1)

Show more
Psomas
Loveland, Colorado

Full Description

Show more
The City of Buena Park is processing a request to implement two discretionary actions that would ultimately allow for the construction of a new municipal-supply water production well and associated maintenance structures and equipment (Project) within a portion of William Peak Park located at 7225 El Dorado Drive (APN: 136-101-04). The Project involves the construction of a new municipal-supply water well with a targeted operational production rate of 3.6 million gallons per day (mgd) (2,500 gallons per minute [gpm]), if available from the aquifers to be perforated in the new well; the construction of a 12-inch-diameter water line along El Coco Way and El Dorado Drive; a 902-foot, 30-inch pump-to-waste drain line; and a 2,000-square-foot pump house building. The pump house building would be constructed on the west side of the proposed Project site in order to allow for future development, including a buried reservoir, pump station, and water treatment area. Proposed access to the Project site would be provided by a new off-site driveway/service road which would connect the proposed well site to El Coco Way.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS