Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Pedestrian Improvements

Active
Project #22-6996State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Ana Public Works Department is soliciting bids for Project No. 22-6996, Pedestrian Improvements, which involves the construction of new wheelchair ramps and related infrastructure. The scope of work includes the removal and replacement of asphalt concrete pavement, Portland cement concrete sidewalks, curb and gutter, and the installation of curb ramps featuring dark gray detectable warning surfaces. Additional requirements include signage, striping using extruded thermoplastic alkyd binder, and the application of methyl methacrylate for green bikeways. The project must adhere to the 2018 Standard Specifications for Public Works Construction, Caltrans standards, and the Manual on Uniform Traffic Control Devices. The contract is awarded based on a low-bid selection process, requiring a 10 percent bid bond and subsequent 100 percent performance and payment bonds. Bidders must submit a comprehensive proposal package including 17 specific documents, such as licensing statements, prevailing wage compliance, and fleet certifications. Project administration will be managed through Procore, and the contractor is subject to liquidated damages of 3,600 dollars per calendar day. Coordination with the OC Streetcar operator is required for work within its alignment to ensure compliance with California Public Utilities Commission safety regulations.

General Info

Santa Ana seeks low bids for pedestrian improvements, wheelchair ramps, and infrastructure construction.

Agency

California → PUBLIC WORKS Department of City of Santa AnaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

20 CIVIC CENTER PLAZA SANTA ANA, California 92701, CA, USA

Set-Aside

NONE

Documents

(1)

Project No. 22-6996 Pedestrian Improvements - Specifications

PDF174 pagesifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → PUBLIC WORKS Department of City of Santa Ana
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → PUBLIC WORKS Department of City of Santa Ana
View Agency Profile
Office AddressCA, USA
Contacts
PWA Engineering CIP & Traffic PWA-CIP-TRFContact

Full Description

Show more
Scope: Construct new wheelchair ramps including; removal & replacement of Asphalt Concrete (AC) pavement (HMA), Portland Cement Concrete (PCC) sidewalks, curb & gutter, curb ramps, and signage and striping.
Notes: Following Bid due date and time, Preliminary Bid Results will be accessible to the public via PlanetBids online. Construction Engineering staff will update Preliminary Bid Results with eligibility status shortly after Bid deadline following verification and review of submissions. Awards will be updated on PlanetBids from "Award Pending" to "Awarded" only after City Council meeting consideration.
Bid Bond: 10.00%

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
REPAIR Airfield Apron - 126 ARW, Scott AFB, IL
Solicitation # W50S7S26
Solicitation W50S7S26Q0031 is a total small business set-aside for comprehensive airfield repairs at the 126th Air Refueling Wing, Scott Air Force Base, Illinois. The project, with an estimated magnitude between 1 million and 2 million dollars, involves four primary components: concrete apron joint sealant and crack/spall repair, asphalt shoulder milling and overlay of approximately 14,500 square yards, airfield marking removal and replacement of approximately 35,000 linear feet, and POL asphalt road repair of 550 square feet. All work must adhere to Air Force and FAA standards, including UFC 3-260-01 and UFC 3-270-02, and utilize Federal Specification TT-P-1952 approved paint for markings. The contract requires a 90-day period of performance, starting from the issuance of the Notice to Proceed. Award evaluation is based on a combination of technical capability, past performance, and price, with a technical boost provided to vendors who attended the site visit. Submission requirements include a technical narrative, a proposed project schedule, a supervisor resume not exceeding two pages, and a completed pricing sheet. The project is subject to Construction Wage Rate Requirements per Wage Determination IL20260017 and requires performance and payment bonds. While initial documents mentioned bid guarantees, Amendment 2 clarified that no bid bonds are required.
W7M6 Uspfo Activity Ilang 126

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
View Details

More opportunities from California → PUBLIC WORKS Department of City of Santa Ana

Same awarding agency

NAICS: 238210
New
SLED
18th Street Street Lighting
Solicitation # 27-6018
Project 27-6018, titled 18th Street Street Lighting, is a solicitation by the City of Santa Ana Public Works Agency for the installation of new street light poles, conduits, and wiring. The scope of work includes the furnishing and installation of LED luminaries, foundations, luminaire arms, and fuse holders, while ensuring the existing lighting system remains operational during construction. All work must adhere to the 2023 California Department of Transportation Standard Plans, Santa Ana Standard Plans, and specific project special provisions. The project requires the use of Type II low alkaline Portland cement and strict adherence to service address labeling and utility marking removal standards. Bids must be submitted electronically via PlanetBids by 2:00 pm on October 7, 2026. A bid bond of 10 percent of the bid aggregate is required, and the successful contractor must provide performance and payment bonds each at 100 percent of the contract price. The project must be completed within 40 working days of the Notice to Proceed, with an absolute maximum duration of 365 calendar days. Compliance requirements include the Community Workforce Agreement, prevailing wage rates, and fleet compliance certifications. The City will manage construction and inspections through Procore, and awards are subject to City Council consideration.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS