Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Pennsylvania Avenue Grade Separation Project (EA 1P300)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Beaumont, in coordination with Caltrans District 8, is advancing the Pennsylvania Avenue Grade Separation Project to eliminate the at-grade crossing between Pennsylvania Avenue and the Union Pacific Railroad by constructing an underpass that lowers the roadway beneath the rail line. The project will extend along Pennsylvania Avenue from 3rd Street southward to just north of the I-10 off-ramp, maintaining two through lanes in each direction, a center median, and a dedicated left-turn pocket for southbound traffic onto the eastbound I-10 on-ramp, while adding a new sidewalk on the northbound side and upgrading existing southbound sidewalk infrastructure. The rail line’s horizontal alignment will remain unchanged, with only minor vertical adjustments of up to two feet in elevation. To accommodate the depressed roadway, the eastbound I-10 on-ramp and westbound off-ramp will be reprofiled for approximately 300 feet and 800 feet respectively, with new traffic signals installed at both intersections, and a retaining wall constructed along the northbound side of the on-ramp. A complex sewer relocation is planned, requiring a jack-and-bore method to install a new line beneath I-10, routing it west along East 6th Street to Massachusetts Avenue before turning south to connect with existing infrastructure. A 4,000-foot temporary shoofly track will be built parallel to the UPRR tracks to ensure uninterrupted rail operations during construction, and all new curb ramps will meet Americans with Disabilities Act standards. The work within Caltrans’ right-of-way includes the ramp modifications, traffic signals, sewer relocation, retaining walls, and ADA-compliant curb ramps. The project has been certified for a categorical exemption under Public Resources Code Section 21080.13 and CEQA Guidelines Section 15282(g), and the lead agency contact is Gita Tokhmafshan, Senior Environmental Planner at Caltrans. The agency code 86896582 is referenced for accounting purposes, though no contract value, payment details, invoicing system, or specific contract type is provided. Evaluation factors, special requirements, and submission instructions are not included in the available documentation, indicating the materials reflect a pre-solicitation forecast with comprehensive engineering scope but incomplete contractual provisions.

General Info

Beaumont and Caltrans to build Pennsylvania Ave underpass, reprofile I-10 ramps, relocate sewer, and add ADA-compliant features.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pennsylvania Avenue and Interstate 10, Beaumont, CA

Set-Aside

NONE

Documents

(1)

1P300 Pennsylvania Avenue Grade Separation CEQA Notice of Exemption 2025-11-21

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Gita TokhmafshanSenior Environmental Planner

Full Description

Show more
The City of Beaumont (City), in coordination with the California Department of Transportation (Caltrans), is proposing a grade separation at the existing Pennsylvania Avenue/Union Pacific Railroad (UPRR) at-grade crossing through the construction of an underpass (i.e., roadway would be depressed under the existing rail line) (Project). The roadway improvements would extend along Pennsylvania Avenue from 3rd Street to the south, to just north of the I-10 off-ramp to the north. Following construction, the horizontal alignment for the rail line would remain in its current location, while the vertical alignment/elevation would involve slight adjustment (elevation would vary from zero to two feet compared to the existing elevation). The width of the new bridge would be approximately 105 feet. The existing roadway condition on Pennsylvania Avenue consists of two through lanes in each direction (northbound [NB] and southbound [SB]), a center median, and a dedicated left-turn pocket from SB Pennsylvania Avenue to the eastbound (EB) Interstate (I-) 10 on-ramp, In addition, a sidewalk is present along the SB side of Pennsylvania Avenue that extends from East 1st Street to the south to East 6th Street to the north. Consistent with the existing roadway cross-section, following construction of the Project Pennsylvania Avenue would consist of two through lanes in each direction (NB and SB), a center median, a dedicated left-turn pocket from SB Pennsylvania Avenue to the EB I-10 on-ramp, and a sidewalk in the SB direction. In addition, the following improvements would be included: • Sidewalk along the NB side of Pennsylvania Avenue • Reprofiling of existing I-10 EB on-ramp and westbound (WB) off-ramp for a distance of approximately 300 feet and 800 feet, respectively, to match the lowered elevation of Pennsylvania Avenue • Addition of traffic signals at the Pennsylvania Avenue/I-10 EB on-ramp and Pennsylvania Avenue/I-10 WB off-ramp intersections • Retaining wall along the NB side of the I-10 EB on-ramp • Relocation of the existing sewer line that is located along Pennsylvania Avenue to accommodate the lowering of the existing roadway. The sewer line would be rerouted west along East 6th Street to Massachusetts Avenue where it would then travel south. A jack and bore approach would be used to install the sewer line under I-10, and the line would tie-into the existing sewer line that exists just south of I-10 and north of the UPRR alignment. A shoofly (approximately 4,000 feet in length) would be created just south of, and parallel to, the existing UPRR tracks for use during construction to minimize impacts to UPRR. The portion of the work within Caltrans’ right of way includes installing traffic signals, sewer relocation, retaining walls, new Americans with Disabilities Act (ADA) curb ramps, sidewalks, and modification to the EB I-10 on-ramp and WB I-10 off-ramp at Pennsylvania Avenue.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details