Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on August 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Penta Invitation for Pre-Qual/SOQ for University Student Union Renovation and Expansion

Closed
CSULBSOQ73State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning
Solicitation # N4008526R9049
This contract, identified by solicitation number N4008526R9049 and titled Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning, is a Total Small Business Set-Aside under FAR 19.5 and NAICS code 236220, reserved exclusively for small businesses. Only Mechanical MACC Contractors listed on the General Requirements cover page are eligible to submit proposals, and responses must be sent via email to the designated point of contact by the deadline of August 19, 2026. The work involves the heated chemical cleaning, flushing, and passivation of chilled water closed-loop systems serving Bachelor Enlisted Quarters at Marine Corps Base Camp Lejeune, North Carolina, requiring the removal of organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, and iron oxide—excluding tightly adherent mill scale. The operation must be conducted without disrupting facility functions and requires adherence to UFGS 23 25 00 and Section 23 24 00 standards, along with Marine Corps Base Camp Lejeune administrative specifications. Execution phases include circulating a heated solution at 120°F for a minimum of 48 hours through the primary loop, followed by 48 hours through terminal units, a final fresh water flush until water clarity is perfectly clear, manual cleaning of all strainers and screens, and chemical passivation to prescribed parameters including sodium sulfite, sodium lauroly sarcosinate, and a system pH between 8.5 and 9.5. The contract incorporates comprehensive Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement clauses covering material and workmanship, specifications and drawings, security requirements (Alternate II), prompt payment, payment procedures for fixed-price construction, progress payments, Wide Area WorkFlow payment instructions, Buy American requirements for construction materials, and modification proposals. Environmental compliance is strictly enforced, with contractors required to follow MCIEAST environmental policies and use approved forms for spill reporting, SAA inspections, and hazardous waste storage. Hazardous materials including asbestos and lead-based paint must be packaged and labeled according to federal regulations: asbestos requires double-wrapping in 6-mil plastic sealed with duct tape and proper manifesting, while lead-painted wood must be cut to under eight feet and wrapped in sealed 6-mil plastic. All hazardous waste must comply with 40 CFR 261, 262, and 263. Contractors must submit a
Navfacsyscom Mid-Atlantic

POSTED

1 day ago

DEADLINE

in 4 days

General Info

Agency

Purchasing Office Department of California State University, Long BeachView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

1250 Bellflower Blvd. MS 0123 Long Beach, California 90840, CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPurchasing Office Department of California State University, Long Beach
Contacts1 person available
OfficeCA, USA
Organization / Agency
Purchasing Office Department of California State University, Long Beach
View Agency Profile
Office AddressCA, USA
Contacts
Enrique RoblesContact

Full Description

Show more
Scope: ADVERTISEMENT FOR BID The PENTA Building Group on Behalf of California State University, Long Beach (“CSULB”)
University Student Union Renovation and Expansion Project No. 0624SS002 City/Location: Long Beach, CA
Overall Project Description: The overall objective of the project is to design and renovate the existing University Student Union (“USU”) building, approximately 180,000 GSF. This includes approximately 160,000 GSF of interior area and 20,000 GSF of outdoor covered walkways and seating areas. The project scope also includes the demolition of the existing University Dining Plaza (UDP) building, and the design and new construction of an approximately 61,000 GSF building addition. The new construction is expected to be a Type 1B structure. Project milestone, Onsite Construction, completion is scheduled for May 15 2028. Please include all anticipated wage increases through June 30, 2028.
Bid Schedule: Bids will be due Thursday, September 4, 2025 at 4:00pm PST. Bids must be submitted directly to DCS (CSULB Design and Construction Services). Late submissions will not be accepted and will be deemed unresponsive and rejected.
All proposals shall be submitted /uploaded ONLY to the proposal link below: https://csulb-my.sharepoint.com/:f:/g/personal/vivek_ghimire_csulb_edu/EowBgCvzesxJhEgkPGD0iDwBZLQiML25Ne0_Iu8dEumGnQ
Scope of Work: Provide labor to support general site maintenance, maintenance of walkways and common areas, Minor protection and temporary barriers, Material handling and delivery assistance, Rough carpentry support including blocking, backing, and safety railings, Temporary fencing and signage maintenance, Safety compliance assistance (fire extinguishers, access paths, etc.), and other day-to-day labor activities as needed throughout the construction lifecycle. Please note that labor needs for the project will fluctuate based on the work being performed. At peak demand, anticipated between August 2026 and May 2028, we expect to need approximately 6-8 laborers and/or carpenters. At no point we anticipate the General Requirements Labor dropping below 2 laborers and/or carpenters. • Please assume that both carpenters and laborers will be utilized on an as needed basis per The PENTA Building Group’s direction. Note that PENTA is signatory to the carpenter’s union, and all carpenters supplied for this project must be union carpenters. Subcontractor/Vendor does not need to be signatory but must supply union carpenters. • All labor must be compensated in accordance with applicable prevailing wage determinations. • Selected subcontractor/Vendor shall submit weekly certified payroll reports. • All workers must be properly classified per trade and scope of work. • Bidder must be registered and in good standing with the CA Department of Industrial Relations. Proposal Requirements: Please submit hourly Labor rates by classification (See table below). Rates must be fully burdened and inclusive of all costs. No additional markups will be accepted. Rates must include: • Wages in compliance with the designated prevailing wage rates assigned to this project. • All federal, state and local taxes, FICA, Medicare and all insurance requirements not covered through the Owner Controlled Insurance Program. • All home office overhead, including project management, accounting, payroll, safety training and all other supervision and oversight that is required, onsite and offsite. • Successful subcontractor / vendor will be required to provide standard PPE for their employees including but not limited to safety helmets with straps, high visibility vests, gloves, and safety glasses. OSHA requirements will be strictly enforced along with PENTA’s safety program and anyone not complying with these requirements will be removed from the job site. • Each employee shall report to PENTA with basic tools including all necessary hand tools and cordless power tools such as a screw gun, impact, grinder, circular saw, (Continued in Other Details)
Notes: THIS IS AN ADVERTISEMENT ONLY Bid Schedule: Bids will be due Thursday, September 4, 2025 at 4:00pm PST. Late submissions will not be accepted and will be deemed unresponsive and rejected. If you have any questions, please contact Justine Helbren at jhelbren@pentabldggroup.com