Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on March 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Perdido Estates Stormwater Improvements

Closed
PD 24- 25.068State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC piping ranging from 6 to 30 inches and Ductile Iron Pipe (DIP) in 18 and 24-inch diameters. Key deliverables include the construction of standard manholes up to 72 inches, doghouse manholes up to 84 inches, and 24-inch DIP sewer trenchless crossings with associated launch and receiving shafts. Additional requirements encompass a CSO regulator fit out, outfall work, and the abandonment of existing pipes and manholes. Supporting site activities include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), clearing and grubbing of 5,130 square yards of wooded areas, and subsequent seeding and fine grading. The project also requires geotechnical instrumentation and monitoring, maintenance of flows and bypass, and specific railroad insurance. Point of contact for this opportunity is John Connelly at [email hidden].
Cleary Construction, Inc.

POSTED

33 minutes ago

DEADLINE

in 26 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

33 minutes ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Perdido Estates Subdivision in Escambia County is undergoing a stormwater improvement project aimed at addressing flooding issues caused by malfunctioning ponds and inadequate conveyance systems. The existing ponds, which discharge to wetlands on the north side of the subdivision, are not functioning as originally designed according to plans from August 2003. The project involves upgrading the stormwater infrastructure through de-silting and restoring pond bottoms, upsizing storm-drain lines, and adding new inlets and storm-drain components to enhance water conveyance and reduce flooding within the neighborhood. The scope of work is substantial, with the contract estimated between $500,000 and $2 million, and is scheduled for solicitation with a response deadline of April 3, 2025. The project is managed by Escambia Purchasing under the Florida agency, with primary contact being David Miller. Interested parties can find more details and submit responses via the designated procurement portal. The initiative reflects a targeted effort to improve stormwater management and mitigate flooding risks in Perdido Estates through comprehensive infrastructure upgrades.

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Escambia Purchasing
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Escambia Purchasing
Office AddressN/A

Full Description

Show more
Perdido Estates Subdivision is located within Escambia County and consists of a stormwater network and two ponds discharging to the wetlands on the north side of the subdivision. The existing ponds are not functioning as intended based on the design plans dated August 2003. The purpose of this project is to improve conveyance and reduce the flooding within the neighborhood. The proposed design includes a replacement and upgrade of the existing stormwater conveyance system to reduce existing flooding in this area. These proposed improvements to the stormwater system include de-silting and restoration of the existing pond bottoms, upsizing existing storm-drain, and the addition of inlets and storm-drain.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS