Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Permanent Pavement Markings and Traffic Signing

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Permanent Pavement Markings and Traffic Signing involves furnishing and installing permanent pavement markings, striping, legends, directional arrows, and traffic signs for prime contractors on projects within the City of San Luis, Arizona. The scope of work includes the application of 90 mil thick alkoxy extruded thermoplastic reflectorized striping and white Type I preformed marking tape, with specific requirements for surface cleaning via sweeping or air-jet blowing and a minimum application temperature of 55 degrees Fahrenheit. Managed by the Engineering agency in Arizona under NAICS code 238990, the contract focuses on the delivery of completed striping and signage. The solicitation was posted on November 22, 2026, with a response deadline of December 14, 2026. There is no specified set-aside status for this opportunity.

General Info

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

This scope was carved out of 2027-RFB-00000020.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Union Street and 4th Avenue Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom Union Street and 4th Avenue Improvements
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyArizona → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnishes and installs permanent pavement markings, striping, legends, directional arrows, and traffic signs for prime contractors on City of San Luis, Arizona projects. Applies 90 mil thick alkoxy extruded thermoplastic reflectorized striping and white Type I preformed marking tape. Requires surface cleaning by sweeping/air-jet blowing and minimum 55°F application temperature. Delivers completed striping and signs.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Arizona → Engineering

Same awarding agency

New
SLED
Union Street and 4th Avenue Improvements
Solicitation # 2027-RFB-00000020
The City of San Luis, Arizona, is soliciting proposals for the Union Street and 4th Avenue Improvements project, identified by solicitation number 2027-RFB-00000020. The scope of work involves roadway and intersection improvements, including the widening of approximately one-half mile of 4th Avenue to include bicycle lanes and a center turn lane. Key deliverables include the installation of new asphalt pavement, sidewalks, curb and gutter, and a new traffic signal at the intersection of Union Street and 4th Avenue. The project also requires utility coordination, drainage improvements, and adherence to ADA compliance and OSHA excavation safety regulations. Construction must follow Maricopa Association of Governments (MAG) and City of Yuma standards, with all materials and installations conforming to ADOT specifications. Bids must be submitted through the OpenGov Procurement Portal by December 14, 2026. Each submission must include a bid guarantee of 10 percent of the total bid amount via certified check, cashier's check, or bid bond, along with a non-collusion affidavit, a subcontractors and suppliers list, and a certificate of insurance. The contract will be awarded to the lowest qualified responsive bidder. The period of performance begins with the Notice to Proceed and concludes upon final acceptance. The successful contractor will be required to provide performance and payment bonds per Arizona Revised Statutes and maintain necessary insurance. Payment is processed via a City-accepted Contractor Payment Request form.

POSTED

about 6 hours ago

DEADLINE

in 22 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS