Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alabama was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Permanent Traffic Signal at Canal Road/Wharf Parkway East/Money Bayou Drive

Closed
State & Local
Submission Closed
Solicitation #
2026-0829

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Federal
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The scope of work is extensive, covering site preparation, construction, and infrastructure activities. Key services requested include land surveying, site photography, quality control, site security, traffic control, subsurface investigation, and site clearing. Construction requirements encompass tunneling, boring, jacking, micro tunneling, cathodic protection, steel casing, manhole material, asphalt paving, traffic signs and signals, lighting, landscaping, ready mix supply, precast concrete, concrete drilling, saw cutting, and welding services. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100% of their contract value, with Kiewit agreeing to reimburse bond premiums. Additionally, Kiewit will prioritize bidders who can demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and invitations to bid are managed through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 18 days

AI Contract Overview

Show more

Solicitation 2026-0829 issued by the City of Orange Beach, Alabama, seeks a qualified contractor to convert a traffic signal at the intersection of Canal Road and Wharf Parkway East/Money Bayou Drive from temporary poles to permanent hardware. The scope of work includes removing existing poles, constructing new signal pole foundations, installing permanent poles, and transferring existing equipment. The project must be completed within 270 calendar days, with work commencing within ten days of the Notice to Proceed. Technical requirements include ADA-compliant pedestrian pushbuttons and sidewalk ramps, and all work must adhere to federal and state environmental and safety regulations, including OSHA and ADEM standards. The contract will be awarded to the lowest responsive qualified contractor, subject to the approval of the City's Project Engineer. Bidders must submit sealed electronic bids via the eProcurement portal by September 10, 2026. For bids exceeding 100,000 dollars, a bid bond of at least 5 percent is required, and the winning contractor must provide performance and labor and materials bonds. Payment is based on monthly estimates of work completed, with a 2.5 percent retainage held until 100 percent completion. Final acceptance is contingent upon the owner and the maintaining agency's approval of the operational traffic control units.

General Info

Alabama project 2026-0829 for permanent traffic signal poles in Orange Beach due 08/27/2026.

Documents

9
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
DOCX, High priority: read this first3 pages · contract-document
High
PDF, Low priority2 pages · bond
Low
PDF, Low priority1 page · award
Low
PDF, Low priority1 page · notice-to-proceed
Low
PDF, Low priority2 pages · performance-bond
Low
PDF, Low priority1 page · waiver-and-release-of-lien
Low

Read all 9 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

82 mandatory

82 requirements in 8 areas

  • Submission21 · 21 must
    001

    Bid Withdrawal Period

    Permanent Traffic Signal at Canal Road_Wharf Parkway East_Money Bayou Drive.pdf
  • Technical18 · 18 must
    045

    Project Completion Timeline

    Permanent Traffic Signal at Canal Road_Wharf Parkway East_Money Bayou Drive.pdf
  • Compliance16 · 16 must
    029

    City Right to Reject Bids

    Permanent Traffic Signal at Canal Road_Wharf Parkway East_Money Bayou Drive.pdf
  • 79 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 82 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 4 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 19 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 10, 2026 to Aug 27, 2026.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama → Community Development
Contacts2 people available
OfficeOrange Beach, AL, 36561, USA

Interested Companies (11)

Bagby & Russell ElectricTheodore, AL
Big RiverKillen, AL
ConstructConnectCincinnati, OH

See All 11 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The signal was constructed in 2025 using temporary poles. The purpose of the project is to convert the signal hardware over to permanent poles.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS