Permit No. 19755 – State Route (SR) 70 Binney Junction Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Permit No. 19755 authorizes the State Route 70 Binney Junction Project under California Code of Regulations, Title 23, Article 3, Section 6, to implement flood control modifications within the Simmerly Slough levee system near Marysville, California. The project encompasses the construction of a setback levee adjacent to the east finger levee to enable the realignment of SR 70, installation of cutoff walls within the east setback, west finger, and portions of the Marysville Ring Levee, and the building of a new pump station and discharge pipe through the west finger levee. Additional work includes removing or abandoning existing culverts, headwalls, and a prior pump station; replacing the floodgate and pipe gate; realigning sections of the Marysville Ring Levee and 24th Street to avoid impacts to the Union Pacific Railroad and levee infrastructure; replacing storm drains with new drainage inlets; constructing a levee crown access ramp; replacing the Marysville and Binney Junction underpass; placing fill for railroad track relocation; lowering the roadway profile at the underpass; and using adjacent land near the east finger levee as a staging area. The project has undergone environmental review under CEQA, with an Environmental Impact Report adopted and no additional mitigation measures or overriding considerations deemed necessary. All work must comply with state flood control regulations and be performed at the designated site in Yuba County along SR 70 near its intersection with 14th Street and Cemetery Road. The project is led by Caltrans, District 3 – Marysville/Sacramento, with environmental oversight provided by the Central Valley Flood Protection Board. No formal contract value, solicitation number, or procurement type is specified, indicating this is a forecasted permit approval rather than an active solicitation. There are no federal acquisition regulations applied, and the document lacks standard contract clauses, payment details, accounting data, COR/COTR assignments, invoicing instructions, packaging requirements, barcoding policies, or offeror certifications such as UEI, CAGE, or socioeconomic status. No period of performance, delivery schedule, FOB terms, or evaluation factors for award are provided. Inspection and acceptance responsibilities fall to the government, with compliance assessed against Title 23 regulatory standards. While support documentation such as the EIR and administrative records are referenced, no formal list of attachments, labeling protocols, preservation standards, or submission instructions for contractors are included, confirming the document serves primarily as a regulatory authorization and

General Info

Caltrans permits flood control modifications and SR 70 realignment near Marysville, complying with Title 23 regulations.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Marysville, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Permit No. 19755 - SR 70 Binney Junction Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Angela Nguyen-TanSenior Environmental Scientist
Marta Martinez-TopeteEnvironmental Scientist

Full Description

Show more
Approval of Permit No. 19755, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct the State Route (SR) 70 Binney Junction Project which includes construction of a setback levee adjacent to the east finger levee to allow for the realignment of SR 70; installation of cutoff walls within the east setback and west finger levees and portions of the Marysville Ring Levee; construction of a pump station and discharge pipe through the west finger levee; removal or abandonment of portions of an existing culvert and remove an existing headwall crossing under the finger levee; removal of the existing pump station and discharge pipe; replacing the floodgate and pipe gate; realignment of a portion of the Marysville Ring levee in vicinity of new floodgate structure; realignment of portions of 24th Street to avoid project impacts to railroad and levee; removal of portions of an existing storm drain and the placement several drainage inlets to capture runoff; construction of new levee crown access ramp; replacement of the Marysville and Binney Junction underpass; placement of fill for the Union Pacific Railroad track relocation; lowering the roadway profile at the Marysville and Binney Junction underpass; and the use of land for a staging area adjacent to the east “finger” levee in Marysville along SR 70.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Sanibel Bridge Fender System Repairs
Solicitation # B260308JAK
Lee County, Florida, is inviting qualified contractors to submit sealed bids for the repair, rehabilitation, replacement, and restoration of the Sanibel Bridge fender system and associated marine components, including timber and composite fenders, prestressed concrete piles, pile head repairs, catwalks, navigation lighting, clearance gauges, handrails, and related structural elements. The scope of work must be fully understood and addressed according to the official specifications available exclusively on the County’s procurement portal at https://leegov.ionwave.net, and bidders are responsible for verifying all documents, addenda, and updates posted there, as submissions based on incomplete or incorrect information from other sources will not be accepted. All bids must be submitted electronically via Ion Wave or hand-delivered in a sealed envelope clearly labeled with the solicitation number B260308JAK, project title, bidder name, and contact details to the Procurement Management Division at 2115 Second Street, 1st Floor, Fort Myers, FL 33901 no later than September 9, 2026, at 7:30 PM, with electronic submissions strongly recommended to avoid technical failures. Bidders are required to complete and sign the Bid Invitation, accurately fill out all attributes and bid lines, and include all requested attachments, ensuring files are uncorrupted and fully accessible. Submissions that are incomplete, unreadable, or improperly formatted may be disqualified. All bids will be publicly opened at the same office on the deadline date and time, and selection will be based on compliance with the solicitation’s technical requirements and overall responsiveness. Questions about the solicitation must be submitted electronically through the official portal’s questions tab, and bidders are cautioned that the County bears no responsibility for internet outages or system failures, urging early submission to ensure timely receipt. The point of contact for inquiries is Jason Koza at jkoza@leegov.com or 239-533-8898, and the official posting site remains https://leegov.ionwave.net for all solicitation-related information.
Lee County

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to address per- and polyfluoroalkyl substances in the water supply. The project aims to enhance the plants' capacity to effectively remove these contaminants in compliance with evolving regulatory standards and public health priorities, requiring integrated engineering solutions across multiple disciplines. All work must be performed in California, with specific attention to local infrastructure constraints and environmental considerations. The solicitation, issued by Pyramid Building & Engineering, Inc. under number lacsd-surface-water-pfas-removal-project-no-251-ca, is open for responses until September 3, 2026, and is designated for Disadvantaged Business Enterprises as defined by the Department of Transportation. It is classified under NAICS code 237310 for water and wastewater treatment construction and seeks qualified contractors with expertise in complex treatment system implementations. Primary communication and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005, with all proposals expected to meet the required standards for DBE participation and technical delivery under the terms of the solicitation.
Pyramid Building & Engineering, Inc.

POSTED

about 12 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project, Specification No. PW 23-59
Solicitation # PW 23-59
The City of Oxnard is soliciting sealed bids for the 4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project under Specification No. PW 23-59, with bids due by 2:00 PM on September 9, 2026. The project encompasses a comprehensive range of infrastructure enhancements along 4th Street from C Street to Oxnard Boulevard, including new concrete sidewalks, curb and gutter, road and driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters, street furniture, bike lanes, landscaping, and an irrigation system, with striping improvements extending to Meta Street and the intersection with 6th Street. Additionally, approximately fifty downtown bus stops will be upgraded. Work will involve demolition of existing pavement, curbs, gutters, and sidewalks; removal and replacement of street lighting and trees; excavation and reconstruction of roadways; installation of storm drains and concrete structures; adjustment of utility covers to finished grade; placement of asphalt concrete; and final traffic striping. All work must comply with the 2018 edition of the Standard Specifications for Public Works Construction and all amendments through the 2021 edition, collectively referred to as the Greenbook. Bidders must obtain all contract documents exclusively through the City’s electronic bidding portal at Planet Bids, as the Public Purchase platform is not used for this solicitation. Questions regarding the project should not be posted on any public forum. The project is administered by the City of Oxnard’s Public Works Projects Department, and inquiries can be directed to pw-publicprojects@oxnard.org or (805) 385-8280. Bid submissions are required to be sealed and delivered by the stated deadline, and the work is to be performed entirely within the City of Oxnard, California. No set-aside designation is specified, and all prospective contractors are expected to meet the full scope of construction requirements as detailed in the contract documents.
City of Oxnard

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details