Permit No. 20098– Authorize Existing Poles 5/91 and 5/90

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Valley Flood Protection Board has authorized the continued operation and maintenance of two existing 60kV electric transmission poles, designated 5/91 and 5/90, located along the Weber-Mormon Junction line that was built in 1953 and crosses Mormon Slough near Stockton, California. These poles are situated on the landside of the slough and represent infrastructure established prior to the adoption of the 1967 Operation and Maintenance Manual for the Mormon Slough Project, meaning their presence does not comply with subsequently established flood control guidelines. The authorization is granted under a categorical exemption under Title 14, Section 15301 of the California Code of Regulations, which permits the operation, repair, and minor alteration of existing facilities without triggering formal environmental review. No new construction, expansion of use, or physical changes to the poles or their foundations are allowed or proposed; the permit solely confirms regulatory approval for their ongoing presence and maintenance. The activity is administrative and environmental in nature, not a procurement, and no contract value, payment terms, delivery schedule, or pricing data are associated with this authorization. Pacific Gas and Electric Company is the applicant and responsible entity for maintaining the poles and ensuring compliance with state environmental and flood control frameworks. The Central Valley Flood Protection Board, acting as the approving authority, is responsible for formal acceptance of the authorization based on compliance with the CEQA Class 1 exemption criteria. Key contact points include Senior Environmental Scientist Angela Nguyen-Tan and Executive Officer Chris Lief from the Board, along with Craig Geldard from PG&E as the project representative. No federal acquisition regulations apply to this action, as it is a state-level environmental permitting decision under California law, and no traditional contract clauses, evaluation factors, or procurement logistics such as invoicing methods, accounting codes, or COR/COTR assignments are present. The project site spans two specific addresses in Stockton—Pole 5/91 at 7550 E Main Street and Pole 5/90 at 8025 Farmington Road—with inspection and acceptance occurring at the location. The posted date is July 16, 2026, with a signature date of July 14, 2026, indicating the authorization was finalized prior to public posting. There are no attachments, no mandatory representations from the applicant, and no special contractual requirements beyond adherence to the CEQA exemption and existing infrastructure limitations.

General Info

Authorization granted for ongoing maintenance of two existing 60kV transmission poles under CEQA Class 1 exemption.

Agency

California → Central Valley Flood Protection Board

NAICS

221121 - Electric Bulk Power Transmission and ControlView NAICS

Place of Performance

Stockton, CA

Set-Aside

NONE

Documents

(1)

Permit No. 20098 Notice of Exemption for PG&E Poles 5/91 and 5/90

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Angela Nguyen-TanSenior Environmental Scientist
Craig GeldardProject Manager

Full Description

Show more
To authorize pole 5/91 and pole 5/90 on the Weber-Mormon Junction 60kV electric transmission line that was constructed in 1953, before the adopted plan of flood control “Operation and Maintenance Manual for Mormon Slough Project San Joaquin County, California, Part No.I-Levees and Channels, San Joaquin River to Bellota, 1967”. This is an aerial crossing with the poles located on the landside.