Permit No. 20098– Authorize Existing Poles 5/91 and 5/90

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Permit No. 20098, issued by the Central Valley Flood Protection Board, authorizes the existing poles 5/91 and 5/90 on the Weber-Mormon Junction 60kV electric transmission line. These poles, constructed in 1953, form an aerial crossing over Mormon Slough in Stockton, San Joaquin County, California, with the poles situated on the landside. The project is located approximately 1,900 feet south of the intersection of East Main Street and Alpine Road, with specific coordinates and addresses identified for both pole 5/91 at 7550 E Main Street and pole 5/90 at 8025 Farmington Road. The authorization is based on the maintenance and operation of existing structures with no expansion of use, making the project exempt under the CEQA Class 1 categorical exemption for existing facilities. The permit aligns with the Operation and Maintenance Manual for Mormon Slough Project San Joaquin County, California, Part No. I-Levees and Channels, 1967. Key personnel managing the project include Angela Nguyen-Tan of the Central Valley Flood Protection Board and Craig Geldard of PG&E, with the document signed by Executive Officer Chris Lief on July 14, 2026.

General Info

Authorization granted for ongoing maintenance of two existing 60kV transmission poles under CEQA Class 1 exemption.

Agency

California → Central Valley Flood Protection Board

Place of Performance

Stockton, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Angela Nguyen-TanSenior Environmental Scientist
Craig GeldardProject Manager

Full Description

Show more
To authorize pole 5/91 and pole 5/90 on the Weber-Mormon Junction 60kV electric transmission line that was constructed in 1953, before the adopted plan of flood control “Operation and Maintenance Manual for Mormon Slough Project San Joaquin County, California, Part No.I-Levees and Channels, San Joaquin River to Bellota, 1967”. This is an aerial crossing with the poles located on the landside.

Similar Contracts

Same NAICS industry code

NAICS: 221121
Grant
Affordable Rural Cooperative (ARC) Energy Program
Solicitation # RUS-ARC-2026
The Affordable Rural Cooperative (ARC) Energy Program, administered by the Rural Utilities Service (RUS) under the USDA, is providing approximately 175 million dollars in loan and grant funding to support the deployment of emission-free nuclear power supply and advanced transmission infrastructure. Authorized under Section 22004 of the Inflation Reduction Act of 2022, the program aims to increase the resiliency, reliability, and affordability of rural electric systems while achieving significant net emission reductions. Funding is split equally between two categories: Eligible Energy and Transmission Energy Efficiency Improvements. For project and system loans, the RUS will finance up to 75 percent of total capitalized costs, requiring awardees to provide at least 25 percent in cash or equity, though certain grants or tax credits may be used toward this requirement. The application process is a two-stage competition starting with a Letter of Interest (LOI) submitted via Grants.gov between October 19, 2026, and November 20, 2026. Eligible entities must have an active SAM registration and a Unique Entity Identifier to apply. LOIs are evaluated based on reliability, resiliency, affordability, financial feasibility, and project timing, with the New Clean Power Tool used to measure projected emission reductions. Only those who receive an Invitation to Proceed may submit a full application within 90 days of the invitation. Awarded projects must commence after the notice publication date and be completed by September 30, 2031, with a performance period of four years from the date of environmental clearance. All awardees must comply with Buy America requirements and federal non-discrimination laws.
Rural Utilities Service

POSTED

about 1 month ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS