Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Perris Valley Regional Water Reclamation Facility Sidestream Treatment and Digester Gas Hydrogen Sulfide Removal Project

Closed
Spec # 1549SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the construction of a sidestream treatment facility and a digester gas hydrogen sulfide removal system at the Perris Valley Regional Water Reclamation Facility in California. The scope encompasses the installation of a new centrate transfer pump station, a sidestream treatment plant with equalization and reactor tanks, and a dedicated service building equipped with blowers, chemical dosing facilities, piping, electrical systems, and civil improvements such as paving and grading. Additionally, modifications are required to existing drain lines and dewatering equipment to facilitate wastewater separation, along with the installation of a new antiscalant chemical system. The project also includes the development of a hydrogen sulfide removal system for digester gas, complete with associated piping, supports, and tank slabs. Electrical, instrumentation, and control system upgrades are integral parts of the work, with control integration services provided by a qualified contractor. The scope further involves demolition, repair, and reconstruction of existing structures affected by the new installations to ensure the facility is fully operational upon completion. The project is solicited by the Eastern Municipal Water District under the NAICS code 238910, with a contract value estimated between 20 and 40 million dollars. The solicitation was posted on November 13, 2024, with a response deadline of January 8, 2025. The work is to be performed in California, and the primary point of contact is Jennifer Morgenstern, reachable via email or phone. The contract aims to deliver a comprehensive, fully operational treatment and gas removal system that enhances the facility’s capacity and environmental compliance.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Under these Specifications, the Contractor shall perform the construction of sidestream treatment facility and digester gas hydrogen sulfide removal system at the Perris Valley Regional Water Reclamation Facility (PVRWRF) in accordance with these specifications and the contract drawings. The scope of work for this project primarily includes, but not limited to, the following:1. A new centrate transfer pump station.2. A new sidestream treatment facility consisting of equalization and reactor tanks and associated equipment.3. A new sidestream service building, including new blowers, chemical dosing facilities, interconnecting piping, electrical equipment and ductbanks, and civil improvements including paving and grading. 4. Modification of the existing drain lines at the existing dewatering building, modifications to dewatering equipment to convey wastewater separately from belt press filtrate, and installation of a new antiscalant chemical system.5. A new digester gas hydrogen sulfide removal system including associated gas piping, overhead pipe supports, and tank support slab.6. Associated electrical, instrumentation and control system improvements and modifications.7. Control integration services by a qualified integrator.8. Demolition, repair and reconstruction of existing improvements affected by the work, and completion of all work necessary to render the facility complete and operational.

More opportunities from California → Eastern Municipal Water District

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS