Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pettit Creek Bridge Replacement Project - RFP

Closed
PE-60899-NONST-2025-000000059State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The City of Cartersville, Georgia, has issued a request for proposals for the Pettit Creek Trail Bridge Replacement project, which involves replacing two pedestrian bridges—one along Cassville Road and another within the Pettit Creek River Walk area. The project scope includes the complete replacement of the north and south bridges, both of which are pedestrian boardwalk structures integral to the local trail system. The proposal submission deadline is July 28, 2025, and the project budget ranges from $500,000 to $1,500,000. Interested bidders must review the comprehensive bid package, which incorporates the table of contents, request for proposal, instructions to bidders, project specifications, and proposal form, all of which are considered part of the contractual requirements. The City of Cartersville reserves broad discretionary authority to accept, reject, or negotiate proposals to serve its best interests, including the right to waive informalities or re-advertise the project if necessary. The contract emphasizes the importance of detailed and competitive proposals, with the primary point of contact being David Archer, reachable via email or phone. The project aims to enhance pedestrian infrastructure within the city, promoting safety and connectivity along the trail systems. The solicitation is posted through the Georgia Procurement Registry, providing potential bidders with access to all relevant details and submission procedures.

General Info

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 60899 CARTERSVILLE, PE-60899-NONST-2025-000000059 to PE-60899-NONST-2025-000000059.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Cartersville
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Cartersville, Georgia invites your company to submit a proposal on this RFP Package, titled: Pettit Creek Trail Bridge Replacement as defined hereinafter.
All terms and provisions listed in the enclosed: ¿TABLE OF CONTENTS¿, ¿REQUEST FOR PROPOSAL¿, ¿INSTRUCTIONS TO BIDDERS¿, ¿PROJECT SPECIFICATIONS¿ AND ¿PROPOSAL FORM¿ are integral parts of the Bid Package.
The City of Cartersville reserves the right to waive informalities in any proposal, to reject any or all proposals in whole or in part, to readvertise, to negotiate segments of any or all proposals and to take any action that it feels is in its best interest.
The proposal price for Pettit Creek Trail Bridge Replacement will include: 1). Replacement of the north bridge, along Cassville Road, a pedestrian boardwalk bridge along the Pettit Creek trail walking path. 2). Replacement of the south bridge, along the Pettit Creek River Walk area, also a pedestrian boardwalk bridge.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS