This Solicitation opportunity from Government of Canada was posted on June 29, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Phase 2 EZ899-231988 – Beaver Creek POE Paving
Closed
WS3983811385CanadaSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Government of Canada → Department of Public Works and Government ServicesView Agency
NAICS
N/A
Place of Performance
*Canada *British Columbia, CANSet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
1 update
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyGovernment of Canada → Department of Public Works and Government Services
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Public Works and Government Services
View Agency ProfileOffice AddressN/A
Contacts
Full Description
Show more
The principal works to be executed and for which all materials, permitting, plant and labour are to be supplied by the Contractor as shown in the plans and specifications:
1. At the Beaver Creek Border Crossing site
1.1 Repair road surface as indicated on Contract Drawings
1.2 Clean existing pavement, including eradicating existing pavement markings
1.3 Paint pavement markings as indicated on the Contract Drawings
1.4 Remove and replace concrete wheelchair ramp for sidewalk as indicated on the Contract Drawings
1.5 Repair curbs near existing fuel tank, as indicated on the Contract Drawings
2. Conduct Work to minimize access and service impacts to Border Crossing facility operations
3. At the Residential Development Site
3.1 Ditching, culvert, and drainage upgrades at, as indicated on the Contract Drawings. Backfilled and regraded areas to be finished in topsoil and hydraulically seeded
3.2 Road regrading, as indicated on the Contract Drawings
4. Diversion of materials from landfill is to be maximized
5. Supply of all required close-out submittals
