Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on August 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Phased Water Transmission Drainage Asset Engineering Support

Closed
24-155-SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 5 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
CITY OF ALAMO FY27 CDBG SEWERAGE
Solicitation # PE-66394-NONST-2027-000000011
The City of Alamo is soliciting statements of qualifications and proposals from engineering firms licensed in the State of Georgia to provide professional services for the improvement of the city's sewerage system. The scope of work involves providing preliminary design services for a potential FY27 Community Development Block Grant (CDBG) project, with the requirement that a draft Preliminary Engineering Report be submitted by January 15, 2027. If funding is secured, the selected firm will also be responsible for the subsequent design and construction management services. Proposals are due by November 30, 2026, and must include the firm's history, CDBG/EIP/RDF experience, key personnel qualifications, current workload, proposed scope of service, references, and associated fees or percentages. Evaluation of respondents is based on a point system assessing the firm's ability to provide necessary disciplines, experience with similar projects, quality of references, and price competitiveness. Additionally, firms must confirm they possess Errors and Omissions insurance and can meet the PER deadline. All contracts are subject to the provisions of the Georgia Department of Community Affairs and must comply with various federal and state laws regarding HUD Assisted Projects, including the Build America, Buy America Act, the Americans with Disabilities Act, and the Civil Rights Act of 1964. The primary point of contact for this solicitation is Bethany Newby.
City of Alamo

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves providing specialized stormwater management engineering services for Seattle Public Utilities (SPU) to support the maintenance and improvement of drainage infrastructure within the city of Seattle, Washington. The scope includes conducting detailed assessments of field site drainage facilities, including culvert integrity inspections through CCTV, and evaluating culverts' fish passability in streams designated as Fish Type streams based on criteria from the Washington State Department of Fish and Wildlife. A key component of the project is developing a strategic prioritization schema to guide asset rehabilitation efforts, ensuring the continued efficient operation of water transmission pipelines and associated drainage assets. Additionally, the contract aims to produce a prioritized catalog of recommended actions for major maintenance and capital improvement projects (CIP), focusing on rehabilitating the right-of-way drainage system assets to optimize resource allocation and infrastructure longevity. The solicitation, titled "Phased Water Transmission Drainage Asset Engineering Support," was posted on August 27, 2024, with a response deadline of October 10, 2024. The project falls under the NAICS code 541330, indicating professional engineering services, and is managed by the Seattle Public Utilities organization within the state of Washington. The contract size is estimated between $500,000 and $2 million, reflecting its scope and importance. The primary point of contact is Contract Administrator Sherry Shaffer, reachable via email or phone. The project emphasizes ethical standards aligned with Seattle’s Ethics Code, promoting integrity, impartiality, and transparency throughout the procurement and project execution processes. More information about the project can be accessed through the provided procurement portal link.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

11

24-155-S Addendum 1: Phased Water Transmission Drainage Asset Engineering Support

DOCX, High priority: read this firstamendment
High

Attachment 5: WMBE Inclusion Plan – Consultant Contracts

DOCX, High priority: read this firstsupporting-documents
High

City of Seattle Consultant Questionnaire

DOCX, High priority: read this firstsupporting-documents
High

City of Seattle SPU Consultant Agreement Template (On-call/Phased)

DOCX, High priority: read this firstcontract-document
High

Consultant Contract 24-155-S: Phased Water Transmission Drainage Asset Engineering Support

PDF, High priority: read this firstrfp
High

Contract 24-155-S Insurance Requirements

DOCX, High priority: read this firstspecifications
High

RFP 24-155-S Phased Water Transmission Drainage Asset Engineering Support Pre-Submittal Presentation

PDF, High priority: read this firstindustry-day
High

RFP 24-155-S Phased Water Transmission Drainage Asset Engineering Support Pre-Submittal Presentation

PDF, High priority: read this firstpresolicitation
High

24-155-S Pre-Submittal Attendee List

XLSX, Low priorityindustry-day
Low

Attachment 3 Seattle Ethics Code Brochure

PDF, Low priority16 pages · other
Low

IRS Form W-9 Request for Taxpayer Identification Number and Certification

PDF, Low priorityw-9-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Seattle Public Utilities (SPU)
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Sherry ShafferContract Administrator

Full Description

Show more
Project Description: Seattle Public Utilities (SPU) is seeking a consultant team to provide stormwater management engineering services to:Prepare and execute a field site drainage facility conditions assessment and engineering study, including culvert integrity CCTV inspection and study;Evaluate fish passability of culverts in Fish Type streams using criteria published by the WA State Department of Fish and Wildlife;Prepare and recommend a schema for prioritizing a strategic rehabilitation program (asset replacement and major maintenance) for ensuring the continued most efficient operation of these facilities to protect SPU property and occupying water transmission pipeline infrastructure;Provide a prioritized catalog of recommended actions for major maintenance and CIP actions to strategically rehabilitate the right-of-way (ROW) drainage system assets.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS