Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 3, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Photonic Laser Install

Closed
FA301621R0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

JBSA Ft Sam Houston, TX, 78234, USA

Set-Aside

WOSB

Documents

17

Appendix+A+-+As+Built+Drawings+4+pgs.pdf

PDF

Appendix+B+-+Operating+Manual+4+Apr+2019+53+pgs.pdf

PDF

Appendix+C+-+IPG+HPL+Pre-Install+Guide+18+Nov+2013+14+pgs.pdf

PDF

Appendix+D+-+Laser+Specs+Rev5+14+May+2014+5+pgs.pdf

PDF

Appendix+E+-+Air+Water+Chiller+Specs+-+G22-47032+20+Nov+2017+4+pgs.PDF

PDF

Appendix+F+-YLS+Series+Datasheet+-+09+October+19+2+pgs.pdf

PDF

Appendix+G++As+Built+Drawings.pdf

PDF

Attachment+1+-+Specifications+13+July+2020+219+pgs.pdf

PDF

Attachment+2+-+Submittal+Register+13+January+2021+5+pgs.pdf

PDF

Attachment+3+-+Wage+Determination+TX20210231+12+Mar+2021+6+pages.pdf

PDF

Attachment+4+-+Climatology+Report.xls

XLS

Attachment+5+-+Section+L+7+pgs.pdf

PDF

Attachment+6+-+Section+M+5+pages.pdf

PDF

FA301621R0022+Site+Visit+Questions+Rev+18+May+2021.pdf

PDF

Solicitation+Amendment+FA301621R0022+0001.pdf

PDF

Solicitation+Amendment+FA301621R00220002+SF+30.pdf

PDF

Solicitation+-+FA301621R0022+-+15+Apr+2021.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

Response deadline changed from May 17, 2021 to May 27, 2021. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Robert Gallegos
Todd Martinez

Full Description

Show more
03 Aug 2021 Amendment 02 is issued to cancel this solicitation in its entirety. None of the proposals received were determined to be technically acceptable. 18 May 2021 Questions and answers from the pre-proposal site visit have been posted. Amendment 01 is issued to incorporate Appendix G As-built drawings and to extend the proposal due date to 27 May 2021. The contractor shall provide design and construction services to modify R6103 B3260 at JBSA - Ft Sam Houston for the installation of an IPG Photonic Laser Model YLS-50000.2lll. The Contractor shall modify R6103 as follows: - seal existing 4" communication conduit into anechoic chamber. Bore and install an 8" PVC communication conduit in location specified by 711 HPW/OMT. - provide an area covering the back right corner of the anechoic chamber (looking in from the door) that extends 3-ft on each side of the corner and a second section that covers 4 linear feet that can slide to any position along the 20-ft wall of the chamber, with the bottom resting on/supported by floor. - provide Fine Grain Extruded Graphite plates, Grade GR060, by Graphtec LLC (or equal; comparable grades are CBY or G11). Plates to be 1" thick by 12" wide by 72" long/tall. Install plate's vertical (12" wide by 72" tall), 3 plates on left side of corner and 7 plates on the right side. Manufacture a frame to hold the panels that allows the ability to slide graphite plates right/left for future removal and replacement as necessary. Verify location with 802d CES project manager prior to securing. - provide cement backer board on the interior anechoic chamber walls (except on ceiling).Replace any ceiling tiles affected by work completed within scope. Match existing ceiling tiles in the room. Install Government provided IPG Photonics remote Air/Water model LC 340.01-A.3.6, 460V, 60Hz along exterior of facility. - construct a chiller pad enclosure 4" concrete equipment pad, 3000 psi minimum, along south wall of facility where the enclosure shall be constructed of cinder block with a brick veneer finish to match existing. See concept drawings shown as attachments. - install chillers on pad as per manufacturer's specifications. Refer to manufacturer's Pre-Installation Guide and Operating Manual (attached to the SOW). - provide netting at the top of the chiller enclosure preventing birds from netting and anti-rodent solution to prevent infestation. - follow UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, Section 3-3, Standard 2, and Unobstructed Space, if directed by 802nd CES. - install Government supplied IPG Photonics Laser Model YLS-50000 and Collimator in R6103. Refer to manufacturer's Pre-Installation Guide and Operating Manual (attached to the SOW). - install IPG Collimator. Refer to manufacturer's Pre-Installation Guide and Operating Manual (attached to the SOW). - connect chilled water supply/return lines between (3) chillers to laser and collimator. Provide all piping, piping insulation, connections, appropriate water and chemicals as specified by laser manufacturer for chilled water loop. Provide pass through of appropriate size through exterior of facility and into anechoic chamber wall for chilled water supply/return water loop. The Contractor shall modify HVAC as follows: - provide and install two (2) articulating snorkel exhaust arms inside the anechoic chamber. Snorkel shall be of appropriate length and articulations (minimum 2 points) for suction end to reach entire surface area of graphite walls and at least 12 feet from graphite walls. Snorkel shall have appropriate aperture size, exhaust velocity, and filtration required to capture all chemicals/off gases. A pre-filter over aperture to protect snorkel is also required. Contact 802nd Bio-Environmental for additional guidelines. - snorkel securely to ceiling and/or chamber wall per location specified. Verify the system conforms to appropriate occupational health standards, such as the recommendations of the American Conference of Governmental Industrial Hygienists, Association of Operating Room Nurses, American Society for Laser Medicine and Surgery, Emergency Care Research Institute, or National Institute for Occupational Safety and Health. - provide on/off switch on chamber entrance wall for exterior exhaust. v. disconnect existing chamber exhaust from building manifold return. Combine snorkel and chamber exhaust and provide dedicated exhaust to facility exterior. - confirm plume rise of exhaust meets environmental standards. - construct a build in filtration system to meet environmental standards. The Contractor shall modify electrical system as follows: - provide new MCB panel board in R6103 for laser system power. - feed new panel board from main electrical vault. - provide surge protection for new panel board. - CB shall have shunt trip and be connected to existing room EPO. - provide new circuit breakers and disconnects for the laser system and all ancillary equipment. - provide all conduit, fittings, and conductors required to provide power to new panel board and new equipment. - provide clear lift cover over EPO. There are no modifications to the fire protection system. The location of the work will be on JBSA - Ft Sam Houston, TX. The 502d Contracting Squadron intends to award a contract with a 120 calendar day period of performance. The estimated magnitude of the entire contract IAW FAR 36.204(f) is between $500K and $1M. A pre-proposal site visit has been scheduled. Please refer to Attachment 5, Section L for specific instructions.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 23 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 4 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS