Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Pico Water District Groundwater PFAS Water Treatment Plant Projects – Well No. 5A

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pico Water District is planning to install and operate an ion exchange treatment plant at Well 5A to address contamination from PFAS in its groundwater supply. This project aims to ensure the safety and compliance of drinking water by effectively removing harmful PFAS compounds, aligning with state and federal water quality standards. The initiative is part of broader efforts to secure clean, reliable water for the community in Pico Rivera, California, and reflects proactive measures to respond to emerging contaminants. The California State Water Resources Control Board is overseeing the initiative, with technical and operational coordination led by District Engineer Dmitriy Ginzburg and General Manager Joe Basulto. The project is listed as a forecast with a posted date of June 29, 2026, indicating it is in the planning or pre-procurement phase. The place of performance is clearly designated as Pico Rivera, with a zip code of 90660, and all activities will be conducted locally to serve the district’s water infrastructure. Contact information for both state and district representatives is provided to facilitate communication and coordination as the project moves toward implementation.

General Info

Pico Water District to install PFAS removal ion exchange plant at Well 5A in Pico Rivera, California.

Agency

California → State Water Resources Control Board

NAICS

221310 - Water Supply and Irrigation SystemsView NAICS

Place of Performance

6708 Rosemead Blvd., Pico Rivera, CA, 90660

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Dmitriy GinzburgDistrict Engineer
JOE BASULTOGENERAL MANAGER

Full Description

Show more
Pico Water District proposed Project includes installation and operation of an ion exchange (IX) treatment plant at Well 5A for the removal of PFAS contaminants.

Similar Contracts

Same NAICS industry code

NAICS: 221310
New
Federal
William Beaumont Army Medical Center, Fort Bliss, Texas Water Purification and Treatment Services
Solicitation # W81K0026QA253
Solicitation W81K0026QA253 is a Firm Fixed Price request for quote for water purification and treatment services at William Beaumont Army Medical Center, Fort Bliss, Texas. The project involves leasing, installing, and maintaining a water purification system to support Sterile Processing Department mobile trailers during facility renovations. The contractor is responsible for providing a commissioned system within 30 days of notice-to-proceed, ensuring a minimum 95 percent uptime, and constructing an ADA-compliant covered steel platform with hospital-grade flooring and air curtains. The base period runs from October 1, 2026, to September 30, 2027, with two optional extension years available at the government's discretion. This is a total Small Business Set Aside under NAICS 221310. Award will be based on the Lowest Price Technically Acceptable (LPTA) method, evaluating technical capability and delivery/installation on a pass/fail basis before considering price. Offerors must submit a three-volume proposal consisting of administrative, technical, and pricing data by August 27, 2026. Key requirements include strict adherence to DoD security clearances, AT Level I training, and compliance with federal healthcare exclusion lists. Per Amendment 2, the contractor is responsible for field-verifying the source water quality, which consists of a blend of city and softened water, and must design the system to adjust to inconsistent water quality to meet all performance requirements.
W40M MRC0 West

POSTED

1 day ago

DEADLINE

in 13 days
View Details