Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pico Water District Groundwater PFAS Water Treatment Plant Projects – Well No. 5A

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pico Water District is planning to install and operate an ion exchange treatment plant at Well 5A to address contamination from PFAS in its groundwater supply. This project aims to ensure the safety and compliance of drinking water by effectively removing harmful PFAS compounds, aligning with state and federal water quality standards. The initiative is part of broader efforts to secure clean, reliable water for the community in Pico Rivera, California, and reflects proactive measures to respond to emerging contaminants. The California State Water Resources Control Board is overseeing the initiative, with technical and operational coordination led by District Engineer Dmitriy Ginzburg and General Manager Joe Basulto. The project is listed as a forecast with a posted date of June 29, 2026, indicating it is in the planning or pre-procurement phase. The place of performance is clearly designated as Pico Rivera, with a zip code of 90660, and all activities will be conducted locally to serve the district’s water infrastructure. Contact information for both state and district representatives is provided to facilitate communication and coordination as the project moves toward implementation.

General Info

Pico Water District to install PFAS removal ion exchange plant at Well 5A in Pico Rivera, California.

Agency

California → State Water Resources Control Board

Place of Performance

6708 Rosemead Blvd., Pico Rivera, CA, 90660

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Dmitriy GinzburgDistrict Engineer
JOE BASULTOGENERAL MANAGER

Full Description

Show more
Pico Water District proposed Project includes installation and operation of an ion exchange (IX) treatment plant at Well 5A for the removal of PFAS contaminants.

Similar Contracts

Same NAICS industry code

NAICS: 221310
New
Federal
Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu
Solicitation # SP060026R0813
DLA Energy, in coordination with the United States Army, is soliciting proposals for the privatization of the water distribution utility system at U.S. Army Garrison-Hawaii, Island of Oahu. This initiative involves the transfer of ownership, operation, and maintenance responsibilities to a private entity for a maximum term of 50 years. The selected contractor will be responsible for all labor, materials, equipment, and capital investments necessary to ensure continuous, reliable, and safe water services. The process includes a contractor-proposed transition period, after which the system will be conveyed via a Bill of Sale, with real property interests provided as easements or rights of access. Award will be based on a best value determination, where technical capability, past performance, and risk are of approximately equal importance and collectively outweigh price. Technical evaluations will focus on service interruption and contingency plans, operations and maintenance, system deficiency corrections, and the operational transition plan. The total evaluated price is calculated as the net present value of monthly payments over the 50-year period. Proposals must be submitted in four volumes—Technical, Past Performance, Contract Documentation, and Price—via CD-ROM or DVD by January 7, 2027. Due to the sensitive nature of the requirement, offerors must obtain special access to secured documents through SAM.gov and the Joint Certification Program.
DLA Energy

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS