Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on February 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Piezoelectric Axle Sensor Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. The selected subcontractor will be responsible for providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, performing minor design adjustments, and managing all material procurement and waste disposal. The project requires integrated professional services, including geotechnical design, inspection, and roadway materials testing. Construction will be subject to rigorous material characterization tests, such as California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 1 hour ago

DEADLINE

in 3 months
NAICS: 237130
New
International
Pacific Science Enterprise Center (PSEC) - Power Distribution Upgrade
Solicitation # 30008413
Fisheries and Oceans Canada is soliciting the supply, installation, testing, and commissioning of new underground electrical distribution and communications infrastructure at the Pacific Science Enterprise Center in West Vancouver, British Columbia. The scope of work includes comprehensive civil works such as excavation, trenching, and surface restoration, as well as the installation of electrical cabling, access vaults, pull boxes, and outdoor electrical kiosks. Additionally, the contractor is responsible for the complete electrical infrastructure for new Electric Vehicle Supply Equipment, including feeders, wiring, and concrete bases. All project activities, including final clean-up and demobilization, must be completed by March 19, 2027. This procurement follows a two-phase selection process. Phase 1 evaluates bidder qualifications and experience, requiring at least one reference project of similar scope completed within the last five years. Pre-qualified bidders will then be invited to Phase 2 to provide a financial bid based on detailed specifications and drawings. This opportunity is a conditional set-aside under the Procurement Strategy for Indigenous Business, requiring certified Indigenous businesses to provide specific certifications. Bidders must also be in good standing with WorkSafeBC and comply with the Canada Labour Code and Canadian Occupational Health and Safety Regulations.
Department of Fisheries and Oceans

POSTED

1 day ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The California Department of Transportation is seeking a subcontractor for the installation of piezoelectric axle sensors at existing census stations to facilitate traffic data collection. The scope of work involves specialized technical tasks, specifically the cutting of pavement and the precise embedding of sensors into the roadway. This opportunity was posted on February 14, 2024, with a response deadline of February 29, 2024. The project falls under NAICS code 237130, which pertains to highway, street, and bridge construction. Interested parties can find further details through the Cal eProcure portal.

General Info

Caltrans seeks a subcontractor to install piezoelectric axle sensors at census stations.

Documents

This scope was carved out of 12A2177.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB Minor B 12A2177 - Replace Loops and Install Piezoelectric Axle Sensors at Existing Census Stations - Orange County

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of piezoelectric axle sensors at existing Caltrans census stations for traffic data collection, including pavement cutting and sensor embedding.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Paving, cold plane AC pavement, drainage, and delineation.
Solicitation # 01-0J9304
The California Department of Transportation has issued solicitation 01-0J9304 for a project involving paving, cold plane AC pavement, drainage, and delineation located in Lake County on Route 29 and 53. With an estimated value of 14.4 million dollars, this cost-plus-time contract requires bids to be submitted via the Bid Express website with a security deposit of at least 10 percent of the bid. Contractors must propose a performance period between 100 and 140 working days. The project includes strict environmental and quality mandates, such as the implementation of Best Management Practices to protect water quality and mandatory equipment pressure washing at 140 degrees Fahrenheit and 800 psi to prevent the spread of soil-borne pathogens. Technical requirements include adherence to MASH Test Level 3 for temporary barrier systems and specific ACI Concrete Field-Testing Technician Grade 1 certifications for quality control personnel. The project is subject to the Davis-Bacon Act, Build America Buy America standards, and requires the submission of DVBE quotes. Safety representatives must hold Cal/OSHA or OSHA 510 certifications along with valid first aid and CPR certifications. Payment terms mandate that subcontractors be paid within 7 days of progress payments, while material suppliers must be paid within 30 days. Performance is supported by digital terrain models, alignments, and profiles provided in LandXML and DGN formats.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Bridge scour repair.
Solicitation # 04-2J88U4
The California Department of Transportation is soliciting bids for bridge scour repair at the No Name Creek Bridge on a state highway in Napa County near Calistoga. The scope of work involves protecting the existing culvert, repairing scour holes at exposed footings using shotcrete, and excavating the channel streambed to final grade. Key technical requirements include the installation of Partially Grouted Rock Slope Protection (PGPSP) with void filler, repairing exposed rebar soffit spalls via structural concrete bridge repair, and grouting voids behind and under culvert walls. All work must adhere to the 2017 AASHTO LRFD Bridge Design Specifications with California Amendments and the 2025 Standard Plans and Specifications. The project is estimated to take 80 working days, with a strict environmental restriction limiting work within creek channels to the period between June 15 and October 15. Contractors must provide a baseline schedule and weekly reports, and quality control personnel must hold an ACI Concrete Field-Testing Technician, Grade 1 certification. The contract mandates a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Bids must include a security deposit of at least 10 percent of the bid amount. Payment is managed through the Department's prompt payment monitoring system, requiring material suppliers to be paid within 30 days of progress payments.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS