Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pile Driving and Foundation Support

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 7 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This subcontract for Pile Driving and Foundation Support involves performing pile driving operations for prime contractors on US Army Corps of Engineers flood risk management projects located in Cedar Rapids. The selected provider will be responsible for installing foundation piles using specialized rigs and vibration monitoring equipment, ensuring all work complies with local noise and vibration ordinances. The scope of work requires careful coordination of construction sequencing within shared work limits to manage environmental restrictions. This opportunity is associated with the Department of Defense and the W07V Endist Rock Island agency, falling under NAICS code 238910. The response deadline for this requirement is September 11, 2026.

General Info

Subcontract for pile driving and foundation support in Cedar Rapids by September 11, 2026.

NAICS

238910 - Site Preparation Contractors

Place of Performance

Cedar Rapids, IA, USA

Set-Aside

NONE

Documents

This scope was carved out of W912EK26RR2P2.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Iowa River Basin, Cedar River, Cedar Rapids, IA, Cedar Rapids Flood Risk Management Project, Reach 2 Phase 2 Downtown Floodwalls

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs pile driving operations for prime contractors on US Army Corps of Engineers (USACE) flood risk management projects in Cedar Rapids. Installs foundation piles while managing noise and vibration restrictions and coordinating construction sequencing within shared work limits. Utilizes pile driving rigs and vibration monitoring equipment. Delivers installed foundation piles compliant with local noise and vibration ordinances.

More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 236220
New
Federal
88th RD US ARMY RESERVE CENTER MONCLOVA, OH CONSTRUCT STORAGE BUILDING AND REPAIR MEP LOTS
Solicitation # W912EK27BA011
The U.S. Army Corps of Engineers, Rock Island District, is soliciting bids for a firm-fixed-price construction project at the 88th RD US Army Reserve Center in Monclova, Ohio. The scope of work involves the construction of an approximately 4,590-square-foot heated pre-engineered metal storage building and the repair of Military Equipment Parking lots. Key construction elements include the installation of insulated metal walls and roofing, overhead and hollow metal doors, cage partitions, and steel shelving. The project also encompasses comprehensive site work, including earthwork, asphalt and concrete placement, chain link fencing, and utility installations for gas, water, and electricity. Building systems will include a wet sprinkler fire suppression system, fire alarms, mass notification systems, and natural gas unit heaters designed to maintain a temperature of 55 degrees Fahrenheit. This is an 8(a) competitive invitation for bid with a performance period of 300 consecutive calendar days. The base bid covers the primary construction and repairs, while Option A provides for concrete footers and Option B allows for the addition of a fifth bay to the storage building. Bids must be submitted in searchable Adobe PDF format via the PIEE Solicitation Module by 11:00 AM Central Time on November 20, 2026. A mandatory prebid meeting was scheduled for November 4, 2026. The contract requires adherence to EM 385-1-1 (2024) safety standards, Davis-Bacon Act wage requirements, and specific cybersecurity protocols under DFARS 252.204-7012. Awardees must provide performance and payment bonds and hold a preconstruction conference within 35 calendar days of the award.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS