Pilot Project for Golden Mussel Treatment at Laterals 4L and 7R and Budget Agumentation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Westlands Water District is initiating a pilot project to apply a copper-based molluscicide to specific water infrastructure at lateral numbers 7R and 4L to eliminate and prevent the resettlement of the invasive Golden Mussel. The treatment will be conducted using a registered chemical approved for use in raw water systems serving agricultural and municipal needs, ensuring environmental and public safety compliance. Operations are scheduled to begin as soon as possible and continue through December 2026, with the possibility of early termination if targeted mussel control is achieved. Ongoing assessments of mussel mortality and regular water quality monitoring will be required to validate effectiveness and ensure regulatory standards are met. The initiative aims to safeguard district infrastructure from damage, curb the spread of the mussel, and reduce risks to public services and the surrounding ecosystem. To support these efforts, a budget augmentation is necessary to cover the increased operational and maintenance costs under Division 3.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
