Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on April 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pineview Reservoir Recreation Complex Reconstruction - Uinta Wasatch, Cache National Forest, Weber Utah

Closed
1282B125R0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 16 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract pertains to the reconstruction of the Pineview Reservoir Recreation Complex located within the Uinta Wasatch, Cache National Forest in Weber, Utah. It is a project valued at over $10 million, falling under the NAICS code 237990 for other heavy and civil engineering construction, and is designated as a total small business set-aside under FAR 19.5, indicating that only small businesses eligible under SBA guidelines can compete for this opportunity. The solicitation was publicly posted on May 27, 2025, with a response deadline set for June 10, 2025, at 2:00 PM. The project involves repair or alteration of recreation facilities that are non-building in nature, emphasizing civil engineering work within a federal forest setting. The procurement process includes amendments to the original solicitation, with Amendment 0001 and Amendment 0002 already published to provide updates and clarifications. The contract will be administered by the USDA Forest Service, Department of Agriculture, with the primary points of contact being Holly Hlavac and Lucas Dahlman. The work is to be performed in South Jordan, Utah, with the contract managed through the SAM.gov platform, where interested parties can access detailed information and supporting documents. This project aims to enhance recreational infrastructure at Pineview Reservoir, supporting federal efforts to maintain and improve public recreation facilities within national forests.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

South Jordan, UT, 84095, USA

Set-Aside

SBA

Documents

52

Amendment 0001 - Solicitation 1282B125R0015 (Pineview Reservoir)

PDF, High priority: read this firstamendment
High

Amendment 0001 to Solicitation 1282B125R0015 Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 1282B125R0015 for Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 1282B125R0015 for Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 1282B125R0015 for Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Attachment 7 - Drawing-Base Pineview Trailhead

PDF, High priority: read this firstspecifications
High

Attachment 7 - Drawing-Base Pineview Trailhead Survey Control Points

PDF, High priority: read this firstspecifications
High

Attachment 7 - Drawings - Base Pineview Trailhead

PDF, High priority: read this firstspecifications
High

Attachment 8 - Construction Drawings and Scope of Work for Option 1001 - New Point

PDF, High priority: read this firstspecifications
High

Attachment 8 - Drawings and Scope of Work for New Point Unita Project

PDF, High priority: read this firstsow
High

Davis-Bacon Act Wage Determination UT20250095 Weber County Utah

PDF, High priority: read this firstwage-determination
High

DBA Wage Determination UT20250095 - Weber County, Utah

PDF, High priority: read this firstwage-determination
High

Drawing Base - Pineview Trailhead (Pages 11-25)

PDF, High priority: read this firstspecifications
High

Drawing-Base Pineview Trailhead pgs 26-40

PDF, High priority: read this firstspecifications
High

Drawings - Base New Entrance and Site - Part 2

PDF, High priority: read this firstspecifications
High

Drawings - Base New Entrance and Site (SR-158 Demolition Plan)

PDF, High priority: read this firstspecifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Construction Drawings Part 1

PDF, High priority: read this firstsow
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Port Ramp Construction Drawings

PDF, High priority: read this firstspecifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Port Ramp Drawings

PDF, High priority: read this firstdrawings
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Port Ramp Drawings

PDF, High priority: read this first19 pages · specifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Phase 2 Port Ramp - Engineering Drawings

PDF, High priority: read this firstspecifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Phase II Port Ramp Drawings

PDF, High priority: read this firstspecifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Schedule of Items

XLSX, High priority: read this first4 pages · bid-schedule
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Schedule of Items

XLSX, High priority: read this firstschedule-of-items
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Schedule of Items Revision 1 Amendment 0003

XLSX, High priority: read this firstschedule-of-items
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Schedule of Items Revision 2 Amendment 0004

XLSX, High priority: read this firstschedule-of-items
High

GAOA Pineview Reservoir Recreation Complex Reconstruction SOW

PDF, High priority: read this firstsow
High

GAOA Pineview Reservoir Recreation Complex Reconstruction SOW Revision 1

PDF, High priority: read this firstsow
High

GAOA Pineview Reservoir Recreation Construction Phase 2 Trailhead Signage Details

PDF, High priority: read this firstspecifications
High

GAOA Pineview Trailhead Typical Pavement and Structure Drawings

PDF, High priority: read this firstspecifications
High

Pineview Reservoir Recreational Facilities Final Geotechnical Investigation

PDF, High priority: read this first100 pages · specifications
High

Pineview Reservoir Recreation Complex Phase 2 - Construction Details

PDF, High priority: read this firstspecifications
High

Pineview Reservoir Recreation Complex Reconstruction - Phase 2 New Point Drawings

PDF, High priority: read this firstdrawings
High

Pineview Reservoir Recreation Complex Reconstruction Phase 2 - New Point Drawings

PDF, High priority: read this firstspecifications
High

Pineview Reservoir Recreation Complex Reconstruction Phase 2 - New Point Site and Utility Plan

PDF, High priority: read this first15 pages · specifications
High

Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Port Ramp Drawings

PDF, High priority: read this firstspecifications
High

Pineview Trailhead Drawings - Phase 2 Reconstruction

PDF, High priority: read this firstspecifications
High

Pineview Trailhead Reconstruction Phase 2 - Drawing Base

PDF, High priority: read this first10 pages · specifications
High

Pineview Trailhead Signage and Information Hub Details

PDF, High priority: read this first10 pages · specifications
High

Schedule of Items - Gaoa Pineview Reservoir Recreation Complex Reconstruction

XLSX, High priority: read this first4 pages · specifications
High

Schedule of Items - GAOA Pineview Reservoir Recreation Complex Reconstruction

XLSX, High priority: read this first4 pages · specifications
High

Solicitation 1282B125R0015: Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstrfp
High

Solicitation 1282B125R0015 - Pineview Reservoir Recreation Complex Reconstruction RFP

PDF, High priority: read this firstrfp
High

SOW - Pineview Reservoir New Point Project Reconstruction

PDF, High priority: read this firstsow
High

SOW - Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstsow
High

SOW - Pineview Reservoir Recreation Complex Reconstruction (Option 1001 - New Point Project)

PDF, High priority: read this firstsow
High

SOW - Pineview Trailhead Project

PDF, High priority: read this firstsow
High

SOW - Pineview Trailhead Project Reconstruction

PDF, High priority: read this firstsow
High

SOW-SPECS-BASE-ROAD-SITE-IMPROV RV1

PDF, High priority: read this firstsow
High

Attachment 4 - Drawings for Base New Entrance and Site - Part 1

PDF, Low prioritydrawings
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Im
Contacts2 people available
OfficeWashington, DC, 202500001, USA
Office AddressWashington, DC, 202500001, USA
Contacts

Full Description

Show more
SEE ATTACHMENTS/LINKS FOR REQUEST FOR PROPOSAL (RFP) AND ALL SUPPORTING ATTACHMENTS AND AMENDMENTS TO THE SOLCITATION **ATTENTION AMENDMENT 0001 HAS BEEN PUBLISHED TO THE SOLICITATION** Project Title: Pineview Reservoir Recreation Complex Reconstruction - Uinta Wasatch, Cache National Forest, Weber Utah PSC Code: Z2PA - Repair or Alteration of Recreation Facilities (Non-Building) NAICS Code: 237990- Other Heavy and Civil Engineering Construction Size Standard for NAICS: $45M Project Magnitude: More than $10M

More opportunities from Department Of Agriculture → USDA Forest Service-Spoc Im

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS