Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Pintail Water Treatment Plant Arsenic Treatment Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Yolo County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pintail Street and Mandarin Street, CA, 95695

Set-Aside

NONE

Documents

(1)

CEQA Exemption Notice for Pintail Water Treatment Plant Arsenic Treatment Improvements

PDFceqa-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yolo County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Yolo County
Office AddressN/A
Contacts
Yana PavlovaCounty Service Area Manager
Jeff AndersonPrincipal Planner

Full Description

Show more
The Wild Wings County Service Area (CSA) is a rural residential golf community located in unincorporated Yolo County, just outside the City of Woodland. The water system, managed by the County of Yolo, supports 338 residences and includes two existing groundwater wells that serve as the community's primary water supply. Installed in 2005, the system consists of the Canvasback and Pintail Well sites, two 360,000-gallon water storage tanks, a potable water distribution network, and a raw water conveyance system. The Canvasback Well has been on emergency standby since 2009 due to arsenic concentrations exceeding the State Maximum Contaminant Level (MCL). Currently, this well is limited to providing irrigation water through the raw water system. As a result, the Pintail Well is the sole provider of potable water for the community. In recent years, the Canvasback and Pintail Wells have experienced significant declines in groundwater levels. Arsenic levels in both wells continue to fluctuate. The Pintail Water Treatment Plant (WTP) improvements were constructed to bring groundwater supplies into compliance with the State Water Resources Control Board—Division of Drinking Water (DWW) MCL for arsenic. The goal of the project is to enable the Canvasback Well to serve as an active production source by providing treatment at the Pintail WTP. The Pintail Well has historically remained below the MCL for arsenic, but the new facilities will also provide the capability to treat Pintail Well water if arsenic levels at that source rise above the standard in the future. As a result, the project ensures that either Canvasback or Pintail groundwater can be reliably used as a potable supply while meeting drinking water standards. The Pintail WTP consists of two-skid mounted filter vessels and associated piping, valving, and controls; a 225-gallon sulfuric acid tank and chemical feed equipment for pre-treatment pH adjustment; a 225-gallon sodium hydroxide tank and chemical feed equipment for post-treatment pH adjustment; and a 16,500-gallon backwash tank. The arsenic treatment system treats water from the Pintail Well directly. It also has capacity to treat water from the Canvasback Well via the raw water line between the Pintail and Canvasback Wells. All improvements are confined to the previously disturbed and developed footprint of the existing Pintail pump station, which is surrounded by a CMU block wall and two access gates. No grading or land expansion occurred beyond the existing facility boundary. No new wells were drilled, no increase in water supply capacity occurred, and there are no changes to the overall operation of the water system other than the treatment of existing groundwater to meet DDW drinking water standards. Pursuant to California Health and Safety Code Section 116275, a Public Water System (Community Water System) is required for the Wild Wings residential community. A Community Water System is defined in the Health and Safety Code as a “public water system that serves at least 15 service connections used by yearlong residents or regularly serves at least 25 yearlong residents of the area served by the system.”

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details