Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Pintail Water Treatment Plant Arsenic Treatment Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Yolo County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pintail Street and Mandarin Street, CA, 95695

Set-Aside

NONE

Documents

(1)

CEQA Exemption Notice for Pintail Water Treatment Plant Arsenic Treatment Improvements

PDFceqa-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yolo County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Yolo County
Office AddressN/A
Contacts
Yana PavlovaCounty Service Area Manager
Jeff AndersonPrincipal Planner

Full Description

Show more
The Wild Wings County Service Area (CSA) is a rural residential golf community located in unincorporated Yolo County, just outside the City of Woodland. The water system, managed by the County of Yolo, supports 338 residences and includes two existing groundwater wells that serve as the community's primary water supply. Installed in 2005, the system consists of the Canvasback and Pintail Well sites, two 360,000-gallon water storage tanks, a potable water distribution network, and a raw water conveyance system. The Canvasback Well has been on emergency standby since 2009 due to arsenic concentrations exceeding the State Maximum Contaminant Level (MCL). Currently, this well is limited to providing irrigation water through the raw water system. As a result, the Pintail Well is the sole provider of potable water for the community. In recent years, the Canvasback and Pintail Wells have experienced significant declines in groundwater levels. Arsenic levels in both wells continue to fluctuate. The Pintail Water Treatment Plant (WTP) improvements were constructed to bring groundwater supplies into compliance with the State Water Resources Control Board—Division of Drinking Water (DWW) MCL for arsenic. The goal of the project is to enable the Canvasback Well to serve as an active production source by providing treatment at the Pintail WTP. The Pintail Well has historically remained below the MCL for arsenic, but the new facilities will also provide the capability to treat Pintail Well water if arsenic levels at that source rise above the standard in the future. As a result, the project ensures that either Canvasback or Pintail groundwater can be reliably used as a potable supply while meeting drinking water standards. The Pintail WTP consists of two-skid mounted filter vessels and associated piping, valving, and controls; a 225-gallon sulfuric acid tank and chemical feed equipment for pre-treatment pH adjustment; a 225-gallon sodium hydroxide tank and chemical feed equipment for post-treatment pH adjustment; and a 16,500-gallon backwash tank. The arsenic treatment system treats water from the Pintail Well directly. It also has capacity to treat water from the Canvasback Well via the raw water line between the Pintail and Canvasback Wells. All improvements are confined to the previously disturbed and developed footprint of the existing Pintail pump station, which is surrounded by a CMU block wall and two access gates. No grading or land expansion occurred beyond the existing facility boundary. No new wells were drilled, no increase in water supply capacity occurred, and there are no changes to the overall operation of the water system other than the treatment of existing groundwater to meet DDW drinking water standards. Pursuant to California Health and Safety Code Section 116275, a Public Water System (Community Water System) is required for the Wild Wings residential community. A Community Water System is defined in the Health and Safety Code as a “public water system that serves at least 15 service connections used by yearlong residents or regularly serves at least 25 yearlong residents of the area served by the system.”

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS