Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pioneer Trail and Williams Road Intersection Improvements

Closed
26-B-90SRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Pioneer Trail and Williams Road Intersection Improvements project involves a comprehensive roadway realignment and upgrade centered on realigning Williams Road approximately 150 feet to the east to create a perpendicular intersection with Pioneer Trail, enhancing sight distance and reducing curvature-related hazards. Work includes milling, resurfacing, widening, and reconstruction along both roads, installation of new 4-foot paved shoulders and two 6-inch thick concrete driveways/aprons on Pioneer Trail, extension of left turn lanes at Williams Road and Otter Boulevard for additional storage capacity, and implementation of drainage conveyance improvements, new storm structures, erosion control devices, signage, pavement markings, and striped medians. All travel lanes will remain 11 feet wide, posted speeds will be maintained, and both intersections will remain stop controlled. The scope is defined by Attachment A, supported by Construction Plans (Exhibit E, April 24, 2026 version) and Technical Specifications (Exhibit F, August 11, 2025 version), with all work governed by Volusia County standards and Florida statutes. The contract is subject to General Conditions (Exhibit A) and Special Conditions (Exhibit B), which include detailed provisions for insurance, bonds, changes, payments, termination, and dispute resolution under Florida law and local county code. The contract is solicited under ITB No. 26-B-90SR by the County of Volusia’s Engineering & Construction department, with a response deadline of June 25, 2026. Bids must be submitted electronically via the county’s eProcurement portal in a single PDF with pricing in Excel format, and paper submissions are not accepted. Only the lowest responsive and responsible bidder will be awarded, with responsiveness requiring full compliance with all bid document requirements including a signed bid form, complete officers and stakeholders list, delegation of authority, 5% bid bond using the county's form, experience documentation, conflict of interest disclosure, debarment certification, W9 form, and local business certification with tax receipt. Responsibility is determined by total cost, permanent business presence, financial and technical capacity, experience on similar projects, and subcontractor competency. Awarded contractors must provide performance and payment bonds equal to the contract sum from an A.M. Best “A” or better rated surety, comply with ADA and FDOT safety standards, implement E-Verify for all employees, maintain a drug-free workplace, submit ACORD insurance forms, and adhere to public records laws and Florida’s

General Info

Realignment and upgrades of Williams Road and Pioneer Trail in DeLand, Florida, improving safety and drainage.

Documents

21

2025-RFP-060 Pioneer Trail and Williams Road Intersection Improvements IFB

PDF, High priority: read this firstifb
High

Attachment A - Scope of Work for Pioneer Trail and Williams Road Intersection Improvements

PDF, High priority: read this firstsow
High

Construction Contract C2080 ITB 26-B-90SR Pioneer Trail and Williams Road Intersection Improvements

PDF, High priority: read this firstcontract-document
High

Contract Time Calculation Sheet CR 4118 PC 3319 Volusia

PDF, High priority: read this firstcontract-time-calculation-sheet
High

Exhibit A General Conditions 26-B-90SR

PDF, High priority: read this firstgeneral-conditions
High

Exhibit B Special Conditions 26-B-90SR

PDF, High priority: read this firstspecial-conditions
High

Exhibit C Bid Price Sheet 26-B-90SR

XLSX, High priority: read this firstbid-price-sheet
High

Exhibit C Insurance Requirements 26-B-90SR

PDF, High priority: read this firstinsurance-requirements
High

Exhibit C Required Bid Documents 26-B-90SR

PDF, High priority: read this firstbid-documents
High

Exhibit D Payment and Performance Bond for Pioneer Trail and Williams Road Intersection Improvements

PDF, High priority: read this firstpayment-performance-bond
High

Exhibit E, Plans, 26-B-90SR - Pioneer Trail and Williams Rd Improvements

PDF, High priority: read this firstcontract-plans
High

Exhibit F Volusia County Roadway Technical Specifications 26-B-90SR

PDF, High priority: read this firstspecifications
High

ITB 26-B-90SR Prime-Subcontractor Form

XLS, High priority: read this firstprime-sub-form
High

ITB No. 25-B-##XX Prime/Subcontractor Form

XLS, High priority: read this first1 page · prime-sub-form
High

Pioneer Trail and Williams Road Intersection Improvements Bid Tabulation

PDF, High priority: read this firstbid-tabulation
High

Pioneer Trail and Williams Road Intersection Improvements Construction Bid Request

DOC, High priority: read this firstconstruction-bid-request
High

Pioneer Trail and Williams Road Intersection Improvements Scope of Work

DOCX, High priority: read this firstsow
High

Volusia County Opinion of Probable Construction Cost - Pioneer Trail & Williams Road

PDF, High priority: read this firstcost-estimate
High

Volusia County Pioneer Trail and Williams Rd Roadway Plans PC 3319

PDF, High priority: read this firstcontract-plans
High

Volusia County Roadway Technical Specifications August 11, 2025

PDF, High priority: read this firsttechnical-specifications
High

Pioneer Trail and Williams Road Intersection Improvements Bid Tabulation

XLSX, Low prioritybid-tabulation
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Engineering & Construction
Contacts2 people available
OfficeDeLand, FL, 32720, USA
Office AddressDeLand, FL, 32720, USA
Contacts
Dennisse ZornanCivil Engineer II - Project Manager
Shaira RestoProcurement/Contracts Manager

Interested Companies (48)

VMAX UsaOrlando, FL
DB Civil ConstructionSaint Augustine, FL
Gibbs & RegisterWinter Garden, FL

See All 48 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Pioneer Trail and Williams Road Intersection Improvements project realigns Williams Road to the east approximately 150 feet and aligns to intersect with Pioneer Trail at a perpendicular angle. By realigning Williams Road, its roadway curve can be made gentler to better improve sight distance. Other improvements include milling, resurfacing, widening, and reconstruction along Williams Road; milling, resurfacing, and widening along Pioneer Trail, new 4' paved shoulders, two new 6" thick concrete driveways/aprons at Pioneer Trail, drainage conveyance improvements, new storm structures, erosion control devices, signage, pavement markings and striped medians. Additionally, left turn lanes to Williams Road and to Otter Boulevard will be lengthened to provide additional storage capacity. Both intersections with Pioneer Trail will remain stop controlled. Travel lanes are 11-foot wide and existing posted speeds will be maintained.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS