Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pipeline Infrastructure Renewal Projects

Forecast
26-234State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The East Bay Municipal Utility District is implementing the Pipeline Infrastructure Renewal Projects to replace and repair deteriorated water pipelines within its service area, specifically focusing on Alameda County. The primary objective is to replace water mains in kind, maintaining existing routings while allowing for nominal size increases, to improve cost-effectiveness and reduce water delivery interruptions. The scope of work includes pipeline replacement, the import of construction materials, and the off-haul of trench soils to designated storage or reuse sites. This effort is forecasted to cover approximately 25 miles of infrastructure. The project is scheduled for Fiscal Year 2026, spanning from July 1, 2025, to June 30, 2026, with projects moving from the design phase into construction. Any projects not completed within this timeframe will be carried over into a construction backlog. To ensure minimal public impact, the district will implement traffic control measures to maintain road access and will coordinate with outside agencies through the Fiscal Year 2026 Pipeline Work Plan. The project is exempt from CEQA under sections 15302 and 15282 and requires encroachment permits from the respective cities. Karen Lee serves as the primary project applicant and point of contact.

General Info

Replace aging water pipelines in Alameda County with minimal disruption, maintaining service and using approved material handling.

Agency

California → East Bay Municipal Utility District

Place of Performance

Various, CA, 94501

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → East Bay Municipal Utility District
Office AddressN/A
Contacts
Karen LeeAssistant Engineer

Full Description

Show more
Replace and repair deteriorated pipelines as needed for cost effectiveness. These projects will typically replace water pipelines in kind. Project Description This project involves the replacement of deteriorated pipelines in EBMUD's service area. The work includes pipeline replacement activities as well as import of construction materials and off-haul of removed trench soils for disposal at EBMUD's trench storage sites or direct hauling· to a reuse site. A summary and project listing of forecasted pipeline design and construction activity are presented in the attached Tables A and B for Alameda County. See these tables and Figure 1 for the complete list of locations in the county. Justification The pipeline candidates are selected for replacement when it becomes more cost effective to replace them than to make frequent repairs. This will also reduce the number of costly interruptions in water delivery. Permits Encroachment permits will be obtained from the appropriate cities as required. For coordination with outside agencies, a listing of forecasted EBMUD's design and construction activities in paved streets, identified as the Fiscal Year 2026 Pipeline Work Plan, will be circulated to all agencies in EBMUD' s Service Area in November 2025. The Work Plan is an annual document that outlines anticipated pipeline design and construction activities in paved streets for the current fiscal year. Schedule Projects classified as being in design are those projects that are currently in design or may be designed in FY26 (July 1, 2025 to June 30, 2026). These projects may reach construction phase as early as this fiscal year. A project listing of forecasted pipeline design activity is given in Table A. A project listing of forecasted pipeline construction activity is given in Table B. Projects classified as being in construction are those projects that have been designed and are waiting for a scheduled construction start date. EBMUD seeks to maintain a construction backlog from which projects can be selected for construction in a cost-effective manner. Many of the projects listed in the following tables will be constructed in FY26. Projects that are not built in FY26 will carry over to subsequent years in the construction backlog. Operational Impact Implementation of this project will not affect the operation of EBMUD' s water system. These projects typically replace water mains in kind (i.e., same routing, but may include nominal size increases). Construction will take place with the existing pipelines still in service. Minimal interruptions in water service will occur for short periods of time when the new pipeline is connected to the existing pipeline. Public Impact EBMUD will minimize disruptions, in particular, traffic impacts, related to the pipeline replacement. Appropriate traffic control measures will be implemented during the construction. Driveways will remain accessible, and one way traffic will only be used adjacent to excavation pits and pipe assembly areas. In order to minimize delays, at least one lane of traffic will be maintained, and two-way traffic will be maintained whenever feasible.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping in various diameters, the construction of standard and doghouse manholes, and the execution of trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, and the abandonment of existing pipes and manholes. Site preparation tasks encompass clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Critical project requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the procurement of railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes. Primary contact for this opportunity is John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS