Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pipeline Installation and Backfill Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is soliciting quotes for a wide range of scopes, including pipeline infrastructure such as pipe, valves, welding, cathodic protection, and jack and bore operations; site work including paving, striping, flatwork, precast vaults, fencing, and potholing; and technical services such as surveying, videography, testing, inspections, settlement monitoring, and E&IC. Additional requirements include SWPPP implementation, traffic control and plans, and asbestos pipe demolition and removal. Bids are due by 2:00 PM on September 18, 2026. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB, and strongly encourages participation from SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, and equipment if necessary. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis. The project falls under NAICS code 237110 and emphasizes a strict commitment to equal opportunity and non-discrimination.
Filanc

POSTED

about 15 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract titled Pipeline Installation and Backfill Services requires the installation of a pipeline within excavated trenches, followed by backfilling and embedment using only approved materials that meet specified standards. Work must ensure proper compaction of backfill material and precise alignment of the pipeline throughout the entire length to comply with engineering and safety requirements. The project is classified as a subcontract under NAICS code 237110 and is being managed by the North Texas Municipal Water District in Texas. Interested parties must submit responses by the deadline of August 13, 2026, at 7:00 PM Central Time, with the opportunity posted on July 2, 2026. All work must be performed in accordance with the technical and procedural specifications outlined in the solicitation, and the place of performance is located within the service area of the North Texas Municipal Water District.

General Info

Pipeline installation and backfilling per specifications in North Texas, deadline August 13, 2026.

Agency

North Texas Municipal Water DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-161-CIP.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tawakoni Water Treatment Plant Emergency Backup Power

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Texas Municipal Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Texas Municipal Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install pipeline in excavated trenches, perform backfill and embedment with approved materials, and ensure proper compaction and alignment per specifications.

More opportunities from North Texas Municipal Water District

Same awarding agency

NAICS: 237110
SLED
WYLIE WTP COMPLEX VALVE IMPROVEMENTS
Solicitation # 26-184-CSP
The North Texas Municipal Water District is soliciting bids for the Wylie WTP Complex Valve Improvements project, which focuses on the repair and replacement of existing valves and associated infrastructure at the Wylie Water Treatment Plant. This construction project, identified by solicitation number 26-184-CSP, has an estimated opinion of probable construction cost between 10 and 15 million dollars. Bids were posted on August 13, 2026, with a response deadline of September 24, 2026. The scope of work includes extensive site operations, traffic management in compliance with TXDOT standards, and the installation of new valves as detailed in the project's proposed plans and sections. The contractor is responsible for all site restoration, including topsoil replacement, grading to prevent storm water ponding, and the reseeding of disturbed areas within easements and rights-of-way. Technical requirements mandate adherence to various ASTM, ACI, and AISC standards for materials such as Portland cement, structural steel, and stainless steel bolts. Special requirements include the mandatory verification of underground utilities prior to excavation, the submission of laying plans 14 days in advance of utility activities, and the coordination and funding of overhead power pole relocations. Inspection and acceptance will occur at the project site, with the contractor bearing full responsibility for ensuring all work matches pre-construction lines and grades.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 24 days
View Details