Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Piping and Distribution System Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the replacement of potable water piping within rights-of-way, encompassing full trenching, installation of new pipe, pressure testing to ensure system integrity, and seamless connection to the existing water distribution network. All work must comply with applicable standards for public water infrastructure and will be performed in areas designated for utility access, minimizing disruption to surrounding environments and existing services. The project is classified under NAICS code 237110, indicating it is within the water and wastewater infrastructure construction sector, and is structured as a subcontract under the Calaveras County Water District in California. The solicitation was posted on July 9, 2026, and the performance location is within the jurisdiction of the Calaveras County Water District, though specific city or zip details are not provided. The work requires precise execution of excavation, pipe laying, and integration with the current system, demanding skilled labor and adherence to public health and safety regulations. Contractors must be prepared to manage logistics within rights-of-way, coordinate with existing utilities, and ensure all segments are pressure tested and approved prior to handover. No set-aside provisions are specified, leaving eligibility open to qualified subcontractors regardless of business size or classification.

General Info

Replace potable water piping in rights-of-way with trenching, testing, and connection to existing network under Calaveras County Water District.

Agency

California → Calaveras County Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of Timber Trails Tank and Pump Station Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calaveras County Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Calaveras County Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Replacement of potable water piping with trenching, pipe laying, pressure testing, and connection to existing network within rights-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The primary objective is to enhance plant reliability and improve the water quality of receiving streams while maintaining existing treatment capacity, though the scope does not address future growth. Key technical deliverables include the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump to Final Clarifier No. 1. The project also involves constructing a building to enclose the headworks, installing a new chemical storage tank for ferric chloride or alum in a dedicated building, and upgrading Motor Control Centers, PLCs, and switchgear. Additional work includes repairing concrete at the headworks and performing miscellaneous structural improvements to HVAC equipment, roofing, and windows. This is a wage-rated solicitation with a bid deadline of August 17, 2026, at 4:00 PM. Carl Belt, Inc. is actively seeking proposals from small businesses, including SDB, WOSB, HUBZone, and veteran-owned concerns, and specifically encourages MBE, DBE, and WBE participation. Targeted opportunities are available for subcontractors in electrical, mechanical, masonry, and painting, as well as suppliers for wastewater pumps, sluice gates, and precast panels. Bids must be submitted to the Cumberland, Maryland office or via the designated online portal. Detailed plans and specifications are available through the company website.
Carl Belt, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 15 hours
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida, on behalf of the Central Florida Water Cooperative. This comprehensive construction project has an estimated value of 270 million dollars and falls under NAICS code 237110. The scope of work includes the construction of raw water production wells with well heads and pumps, discharge piping, surge bladder tanks, site civil work, and wellhead cages. Additionally, the project requires the construction of an electrical building, a standby generator, Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. The contractor must also perform primary and secondary water quality analytical laboratory testing and production well disinfection to achieve regulatory certification. Proposals must be submitted via email to Nichole Voitel. The submission process requires the proposed scope of work to be delivered at least 24 hours before the bid date, with firm pricing submitted by 10:00 AM on the day of the bid. The final deadline for responses is August 19, 2026, at 2:00 PM EST. Bidding documents, including plans, specifications, and addenda, are available for free download through ConstructConnect. Wharton-Smith, Inc. will review responsible quotes and may negotiate terms as appropriate to finalize the award.
Wharton-Smith, Inc.

POSTED

about 1 hour ago

DEADLINE

in 3 days
View Details