Piping and Pump System Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract titled Piping and Pump System Replacement seeks to install a new chemical-resistant pump and piping system specifically designed for the transfer of sulfuric acid, including all necessary valves and instrumentation to ensure safe and efficient operation. The work is scoped to replace existing infrastructure with materials and components capable of withstanding the corrosive properties of sulfuric acid, prioritizing durability, leak prevention, and compliance with industrial safety standards. The systems must be engineered for continuous use in a high-risk chemical environment and meet all relevant operational and regulatory requirements. This subcontract is issued by the West Basin Municipal Water District in California, with a posted date of July 15, 2026, and a response deadline of July 30, 2026. The NAICS code 238220 indicates the work falls under plumbing, heating, and air-conditioning contracting, though the scope is specialized for chemical handling infrastructure. The place of performance is not specified beyond the agency’s location in California, and while no set-aside status is indicated, interested parties must submit proposals by the deadline via the provided public procurement portal link. Failure to meet the technical, safety, or delivery requirements may result in disqualification.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → West Basin Municipal Water District
Same awarding agency
