Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on March 6, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PIRNIE UPPER ENVELOPE PROJECT - ALEXANDER PIRNIE FEDERAL BUILDING

Closed
47PC0220R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 11 hours ago

DEADLINE

in 23 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Utica, NY, 13501, USA

Set-Aside

SBA

Documents

27

Solicitation 47PC0220R0008 - Prime Upper Envelope of Bldg

PDF, High priority: read this firstrfb
High

Amendment+0001+-+Pirnie+Upper+Envelope+Project+-+Key+Personnel+Qualifications+Resume+Form_Attachment+C.xlsx

XLSX

Amendment+0001+-+Pirnie+Upper+Envelope+Project+-+Past+Performance+Questionnaire_Attachment+B.docx

DOCX

Amendment+0001+-+Pirnie+Upper+Envelope+Project+-+SOW_11-1-19.pdf

PDF

Amendment+0002+-+Pirnie+Upper+Envelope+Project+-+Key+Personnel+Qualifications+Resume+Form_Attachment+C.pdf

PDF

Amendment+0002+-+Pirnie+Upper+Envelope+Project+-+Past+Performance+Questionnaire_Attachment+B.pdf

PDF

Amendment+0002+-+Pirnie+Upper+Envelope+Project+-+SOW_11-1-19.pdf

PDF

Amendment+0002+-+Q-A.pdf

PDF

Amendment+0003+-+Q-A.pdf

PDF

Amendment+No.+1+Q-A.pdf

PDF

Attendance+Sheet+-+Site+Visit.pdf

PDF

Building+Drawings+Final+12-20-2019.pdf

PDF

Final_SBSA+GC+Agreement+aug19+r1+508.pdf

PDF

Final_SBSA+GC+Solicitation+aug19+r1+508.pdf

PDF

GC+Reps+andCerts+dec19+508.pdf

PDF

GSA+527+-+Contractor%27s+Qualifications+and+Financial+Information.pdf

PDF

Pirnie+Upper+Envelope+Project+-+Experience+on+Similar+Projects+Offeror+Form+-+Attachment+A.xlsx

XLSX

Pirnie+Upper+Envelope+Project+-+Key+Personnel+Qualifications+Resume+Form_Attachment+C.xlsx

XLSX

Pirnie+Upper+Envelope+Project+-+Past+Performance+Questionnaire_Attachment+B.docx

DOCX

Pirnie+Upper+Envelope+Project+-+SOW_11-1-19.pdf

PDF

Solicitation+Amendment+47PC0220R0008_0001+%282%29.pdf

PDF

Solicitation+Amendment+47PC0220R0008_0002+%281%29.pdf

PDF

Solicitation+Amendment+47PC0220R0008_0003.pdf

PDF

Solicitation+Amendment+47PC0220R0008_0004.pdf

PDF

Specifications+Final+12-20-2019.pdf

PDF

Standard+Form+24+-+Bid+Bond.pdf

PDF

Wage+Determination+NY20190013.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 24, 2020 to Mar 10, 2020. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R2 Repair And Alterations Branch
Contacts2 people available
OfficeNEW YORK, NY, 10007, USA

Full Description

Show more
This Amendment No. 0004 is being issued to provide GSA response to a RFI received. Please see attached SF30 for details. This amendment must be signed and returned with your offer. This Amendment No. 0003 is being issued to provide GSA response to RFIs received (Please see attached Amendment 0003 - Q-A for details). This amendment must be signed and returned with your offer. Missing Attchment for Amendment No. 0002 for site visit sign-in sheet is added. An amendment is issued to this solicitation. This Amendment No. 0002 is being issued to: 1. Extend the proposal due date to Tuesday, March 10, 2020, by 4:00 P.M. EST.; and accordingly the RFI due date is being revised to be COB, Friday February 28, 2020; 2. Provide GSA response to RFIs received (Please see attached Amendment 0002 for details). This amendment must be signed and returned with your offer An amendment is issued to this solicitation. This Amendment No. 0001 is being issued to provide a 2nd site visit date and GSA responses to the RFI questions received. Please see attached Amendment 0001 for details. This amendment must be signed and returned with your offer. THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, intends to issue a Request for Proposal (RFP) # 47PC0220R0008, to replace approximately 28,500 sf of existing roofing systems at the Alexander Pirnie Federal Building (161 x 166) will be replaced with new roofing systems at Alexander Pirnie Federal Building, 10 Broad Street, Utica, NY 13501. The existing 2 thick wood planking which is located beneath the mansard roofing system- will be replaced with new 2 thick wood planking which has field fabricated R-30 insulated panels installed on top of the new planking. The Yankee gutters will be replaced in their entirety with similar materials; and the existing roof drains and roof conductors located above the attic floor will be replaced in their entirety with new materials. The existing slate roofing materials which are installed on the sloped portion of the mansard roof will be replaced with synthetic slate materials and a new TPO roof membrane will be installed on the flat portion of the mansard roof. The ACM flashing materials which are installed at the six skylight structures at the Lower Roof will be abated and the six skylight structures will be demolished and the skylight openings which are located in the concrete slab beneath the Lower Roof will be closed. The existing roofing and wood support structures at the Lower Roof and Middle Roof will be removed and replaced with new TPO roof membranes and R-30 insulation that will be placed on the existing concrete slabs that support the wood framing. The existing roof membrane and associated insulation materials at the Upper Roof will be replaced with a new TPO roof membrane and R-30 insulation. Guardrails will be installed around the perimeter of the flat roofs; snow rails will be installed at the lower edge of the slate roofs. A roof tie-off system will be installed at the peak of the slate roofs; and a secondary roof drain system will be installed at the Lower Roof and the two drain conductors will be routed through the interior of the building and terminate at the north wall at two sheep's mouth nozzles. The project involves HVAC work and is described hereafter: a ventilation system will be installed in the attic space to regulate temperature and humidity. The existing rooftop equipment at the Middle Roof and Lower Roof will be removed and reinstalled on the lowered roofs. Existing electrical and mechanical systems which are hung from the mansard ceiling will be re-supported. At the conclusion of the project, the existing site will be restored to its original condition. This project has three options as described hereafter: Option One includes the following work: a steam coil with associated piping and controls will be installed at the basement AHU identified as PHCU-1 and will be installed at the second floor AHU identified as PHCU-2. Option Two includes the following work: the R-22 direct expansion refrigeration system (DX cooling coil, compressor unit, refrigeration piping, and air-cooled condensing unit) which provides cooling at the basement AHU identified as PHCU-1 will be replaced in its entirety. PHCU-2 provides 7,030 cfm of conditioned air to the Alexander Pirnie Federal Building. Option Three includes the following work: the R-22 direct expansion refrigeration system (DX cooling coil, compressor unit, refrigeration piping, and air-cooled condensing unit) which provides cooling at the basement AHU identified as PHCU-1 will be replaced in its entirety. PHCU-1 provides 20,850 cfm of conditioned air to the Alexander Pirnie Federal Building. TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS