Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PISTON, DAMPER

Closed
SPE4A5-26-T-157PFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336412
New
Federal
Support, Turbine Noz (1C)
Solicitation # SPRTA126R1091
The contract solicitation SPRTA126R1091 pertains to the procurement of a Turbine Stator Support Assembly (TOBI), identified by NSN 2840015454839NZ and part number 4088292, for use on the F100 engine under the Department of Defense. This is a presolicitation notice indicating a sole source acquisition under FAR 6.302-1, justified by the limited number of qualified sources—specifically Union Machine Co and Raytheon Technologies Corporation—who are pre-approved for this component. The requirement calls for eight units of the assembly with a minimum of three and maximum of fifteen units possible, alongside two units for first article testing, one unit for evaluation by an alternate source, and mandatory submission of a First Article Test Plan and Test Report. All deliveries must be completed by May 1, 2028, at Tinker Air Force Base, Oklahoma, with the designated delivery point identified as SW3211. The procurement explicitly prohibits commercial item acquisition procedures under FAR Part 12 and instead follows full negotiated procedures under FAR Part 15. The contract includes stringent requirements for Item Unique Identification (IUID), export control compliance, and mandatory First Article Contractor Testing for all non-OEM suppliers. Price is a significant evaluation factor alongside technical capability and past performance in a trade-off selection process, though no numerical weights or adjectival ratings are disclosed. Proposals must be submitted electronically via SAM.gov by the deadline of July 8, 2026, with no hardcopy submissions accepted. Payment is dependent on appropriated funds, and the sole point of contact for inquiries is Rhonda Ehrhardt at the Oklahoma City DLA Aviation office. The acquisition involves no small business set-aside and imposes no option periods or security clearance requirements, focusing instead on strict adherence to military specifications, traceability standards, and qualified source limitations.
Ok DLA Aviation At Oklahoma City

POSTED

about 21 hours ago

DEADLINE

in about 1 month
NAICS: 336412
New
Federal
Fuel Pressure Valve_End_Item_J85_NSN_2915008960173OK_PN_37C301344G002
Solicitation # FD20302600142
The Department of the Air Force, through the 421st SCMS at Tinker AFB, is conducting market research via a Sources Sought Synopsis to identify potential sources for the new manufacture of fuel pressure valves for the J85 platform. The requirement is identified by NSN 2915008960173OK and Part Number 37C301344G002. This effort is intended to determine if the procurement can be competitive or established as a Small Business Set-Aside. Interested sources must be capable of providing all labor, materials, and equipment for manufacturing, including component procurement, inspection, testing, packaging, and shipping. This is a new spares buy with no repair requirement, and unit prices will be established at the time of a future contract award. The procurement falls under NAICS code 336412, with a size standard of 1,500 employees. The government is seeking interest from all business types, including large businesses and various small business designations. Potential sources must adhere to strict Manufacture Qualification Requirements for Propulsion Critical Safety and Critical Application Items, which include providing detailed company profiles, SAR packages, and evidence of quality certifications such as ISO 9001 or AS9100 for all sub-tier suppliers. Technical documentation must demonstrate work traceability through Travelers, Process Operation Sheets, and Inspection Method Sheets. Responses for this market research effort are due by September 18, 2026.
Ok DLA Aviation At Oklahoma City

POSTED

about 21 hours ago

DEADLINE

in 7 days
NAICS: 336412
New
Federal
Pump, Fuel, Jet Engin (3B)
Solicitation # SPRTA126R1792
Solicitation SPRTA126R1792, issued by the Department of Defense DLA Aviation at Oklahoma City, is a request for the new manufacture of Critical Safety Item fuel pumps for F110 jet engines. The requirement is for an estimated quantity of 58 units, with a flexible range between 14 and 87 units, to be delivered to Tinker AFB, OK, by May 31, 2027. The items are identified by NSN 2915013548333PR and part numbers 9338M20P08 / 5010069, consisting of aluminum alloy construction. Proposals are due by October 13, 2026, and the award decision will be based on a combination of price and past performance, with the government utilizing the Supplier Performance Risk System to assess item, price, and supplier risk. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073 for preservation and MIL-STD-129 and MIL-STD-130 for marking and Item Unique Identification. Due to the nature of the components, specific packaging for residual fuel and heat-treated debarked wood for containers are required. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and reporting, compliance with the Federal Acquisition Supply Chain Security Act, and adherence to Buy American and cybersecurity maturity model certification levels. Offerors must provide separate proposals for any Non-Recurring Engineering expenses and submit cost and pricing data in accordance with FAR 15.403-3.
Ok DLA Aviation At Oklahoma City

POSTED

about 21 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract is for the procurement of 36 units of a PISTON, DAMPER with NSN 2915-00-891-8873, supplied by ONTIC ENGINEERING & MANUFACTURING, INC, under solicitation SPE4A5-26-T-157P. Delivery is required 171 days after order receipt, with an original delivery date of November 13, 2026, and a need ship date of November 15, 2026. Goods are to be delivered FOB ORIGIN to DLA Distribution Cherry Point in North Carolina, with inspection and acceptance occurring at the destination. The contract requires strict adherence to DLA’s Master List of Technical and Quality Requirements, which override all other standards such as ASTM D3951 for packaging. Packaging must follow RP001 for palletization and MIL-STD-129 for labeling and marking, including physical identification of bare items per RQ017. Sampling for quality verification must comply with MIL-STD-1916 or ASQ H1331, with zero non-conformances required unless otherwise specified, and attributes are classified with critical, major, and minor levels corresponding to AQLs of 0.1, 1.0, and 4.0 respectively. The item is designated as a critical application, and configuration changes require formal Engineering Change Proposals. Cybersecurity compliance mandates CMMC Level 2 self-assessment and adherence to NIST SP 800-171, along with safeguarding covered defense information as per DFARS 252.204-7012. The contractor must comply with hazardous materials regulations including hazard communication labels and MSDS submission prior to award, prohibit hexavalent chromium, and restrict toxic material storage or disposal. Electronic invoicing via WAWF is required, and payments are subject to levies. The contract includes clauses covering employment of individuals with disabilities, combating human trafficking, employment eligibility verification, and prohibited acquisitions from Communist Chinese military companies. Pricing data is not provided, rendering the total contract value undetermined. The Unique Entity Identifier and CAGE code must be submitted, and socioeconomic certifications are required if applicable. No evaluation factors or weights are disclosed, suggesting a potential LPTA approach. All submissions must be made electronically through DIBBS by the May 27, 2026 deadline, with primary point

General Info

Procurement of 36 piston dampers by Ontic, delivered FOB origin, quality and cybersecurity compliant.

Agency

Department Of Defense → ASC SUPPLIER OPER OEM DIVISIONView Agency

Contract Value

$48,850.92

NAICS

336412 - Aircraft Engine and Engine Parts ManufacturingView NAICS

Place of Performance

PHANTOM RD BLDG 147 BAY A, CHERRY POINT, NC, 28533-5040, USA

Set-Aside

NONE

Awardee

TRANSAERO, INC.View Profile

Award Issued Date

Documents

(1)

RFQ SPE4A5-26-T-157P DLA Aviation May 20 2026

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Type Changed

Combined Synopsis → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → ASC SUPPLIER OPER OEM DIVISION
Contacts1 person available
OfficeUSA
Organization / Agency
Department Of Defense → ASC SUPPLIER OPER OEM DIVISION
View Agency Profile
Office AddressUSA
Contacts

Full Description

Show more
PISTON,DAMPER
PISTON,DAMPER
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RD002, COVERED DEFENSE INFORMATION APPLIES
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
Item Unique Identification is not required by request of the Service customer. DFARS 252.211-7003(c)(1)(i) applies.
RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND NON-MANUFACTURERS)
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
CRITICAL APPLICATION ITEM
ONTIC ENGINEERING & MANUFACTURING, INC 45934 P/N 710172-1
SPE4A5-26-T-157P
SECTION B
PR: 7016844108 PRLI: 0001 CONT’D
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7016844108 0001 EA 36.000
NSN/MATERIAL:2915008918873
DELIVERY (IN DAYS):0171
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3113
DLA DISTRIBUTION CHERRY POINT
PHANTOM RD BLDG 147 BAY A
CHERRY POINT NC 28533-5040
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
SW3113
DLA DISTRIBUTION CHERRY POINT
PHANTOM RD BLDG 147 BAY A
CHERRY POINT NC 28533-5040
US
Need Ship Date:11/15/2026 Original Required Delivery Date:11/13/2026
SPE4A5-26-T-157P
SECTION B
PR: 7016844108 PRLI: 0001 CONT’D

SPE4A5-26-T-157P NSN/Part Number: 2915-00-891-8873 Quantity: 36 EA Purchase Request: 7016844108QTY: 36 Delivery: 171 days ADO

More opportunities from Department Of Defense → ASC SUPPLIER OPER OEM DIVISION

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS