Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PVC Roofs

Closed
FA461326B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 16 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The solicitation for PVC Roofs under FA461326B0001 is a total small business set-aside with a NAICS code of 238160, issued by the Department of Defense through the 90 CONS PKAA office at F.E. Warren AFB, Wyoming. Bids must be submitted exclusively through the PIEE Solicitation Module, and all amendments must be acknowledged via SF 30 forms to remain eligible. The response deadline has been extended multiple times, with the final due date set for 23 June 2026 at 8:00 PM MT, following a series of updates that modified the statement of work, incorporated new attachments including updated roofing specifications, site visit protocols, and additional drawings, and revised bid opening times. The contract requires compliance with SPRS/CMMC standards for award, includes a new clause addressing DEI discrimination by federal contractors, and removes specific roofing requirements previously listed. All prospective bidders must submit EAL and BASE EAL information by 27 April 2026, including names and SSNs to designated contacts, and provide driver’s license front sides if requesting access to all buildings; failure to meet these deadlines will result in denial of site visit access and possible base access revocation. A mandatory site visit was held on 4 May 2026 at BLD 1284 with a strict capacity limit of three representatives per company, and no individual visits are permitted. Contractors are reminded that acknowledgment of Amendments 1 through 4 fulfills the requirement to accept all PIEE amendments issued through Amendment 5.

General Info

Roof replacement at F.E. Warren AFB for small businesses; bids due June 4, 2026; mandatory site visit May 4.

NAICS

238160 - Roofing Contractors

Place of Performance

F.E. Warren AFB, WY, WY, 82005

Set-Aside

SBA

Documents

34

AF Form 66 Schedule of Material Submittals

PDF, High priority: read this firstsow
High

AF Form 66 - Schedule of Material Submittals

PDF, High priority: read this firstsow
High

Amendment 0001 to Solicitation FA461326B0001

PDF, High priority: read this firstamendment
High

Amendment 3 to Solicitation FA461326B00010003

PDF, High priority: read this firstamendment
High

Civilian Contractor Safety Guide

PDF, High priority: read this firstsafety-guide
High

CUI Release Memorandum for Record - Project Title: PVC Roofs

PDF, High priority: read this firstspecial-notice
High

Hazardous Materials Authorization Request

PDF, High priority: read this firsthazmat-authorization-request
High

Q&A for FA461326B0001 PVC Roofs

PDF, High priority: read this firstq-and-a
High

Revised Statement of Work - Roof Replacement

PDF, High priority: read this firstsow
High

Revised Statement of Work – Roof Replacement Project

PDF, High priority: read this firstsow
High

Section 075420 Adhered PVC Roofing Membrane Specification

PDF, High priority: read this firstsow
High

Section 075420 Adhered PVC Roofing Membrane Specification

PDF, High priority: read this firstspecifications
High

Shed Roof Plan - Translucent Panel Info

PDF, High priority: read this firstspecifications
High

Solicitation Amendment 0002

PDF, High priority: read this firstamendment
High

Solicitation Amendment 0002 for FA461326B00010002

PDF, High priority: read this firstamendment
High

Solicitation Amendment 0004 – FA461326B00010004

PDF, High priority: read this firstamendment
High

Solicitation and Award Form SF 1442 for PKAAPVC Roofs

PDF, High priority: read this firstifb
High

Source Selection Documentation: Use of Non-Government Advisors

PDF, High priority: read this firstsource-selection-documentation
High

Statement of Work – Roof Replacement (20 Apr 2026)

PDF, High priority: read this firstsow
High

Wyoming Building Construction Wage Determination 2026-0041

PDF, High priority: read this firstwage-determination
High

Aerial View All Buildings Attachment

PDF, Low priorityother
Low

Building 325 Roof Drawings

PDF, Low prioritydrawings
Low

CUI Release Acknowledgement for Project PVC Roofs

PDF, Low priorityother
Low

CUI Release Memorandum for Project PVC Roofs

PDF, Low priorityspecial-notice
Low

Environmental Specifications

PDF, Low priorityother
Low

Memorandum for Record - CUI Contract Documents for PVC Roofs

PDF, Low prioritymemorandum-for-record
Low

PDF Portfolio - Attach 6 1284 Drawings Various Dates

PDF, Low priorityother
Low

PDF portfolio notice

PDF, Low priorityother
Low

PDF Portfolio Notice

PDF, Low priorityother
Low

PVC Roofs Solicitation Site Visit Sign-In Sheet

PDF, Low priorityother
Low

Solicitation Site Visit Sign-In Sheet

PDF, Low priorityspecial-notice
Low

Unreadable PDF portfolio notice

PDF, Low priorityother
Low

0001_Attach_16_BLD_1164_Photos.pdf

PDF

0002_Attach_19_Additonal_BLD_1284_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from Apr 10, 2026 to Apr 15, 2026. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from May 20, 2026 to Jun 4, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 4, 2026 to Jun 10, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 10, 2026 to Jun 16, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 16, 2026 to Jun 23, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4613 90 Cons Pk
Contacts1 person available
OfficeFE WARREN AFB, WY, 82005-2860, USA
Office AddressFE WARREN AFB, WY, 82005-2860, USA

Full Description

Show more
Official Amend 4 (UPDATE 5): This Amendment Includes: a. Extension of bid due date and time. b. Clarification for SPRS/CMMC requirements for award. c. Option to join bid opening via teams information provided. d. Update attachment 15. NOTE: If you have completed this document to receive CUI documents, you DO NOT need to complete this document again. By acknowledging the SF 30 for Official Amendments 1-4, you are acknowledging PIEE amendments 1-5. REMINDER-As a reminder, all bids MUST be submitted via the PIEE Solicitation Module //Official Amend 3 (UPDATE 4): a. SOW dated 9 June 2026, b. New bid due date and opening date of 9:00am MDT, 16 June 2026. c. Updated section L; bid due date and removal of Roof Type 2 requirement. d. Contractors MUST acknowledge all amendments via the SF 30s, 1-3.** e. As a reminder, all bids MUST be submitted via the PIEE Solicitation Module. **NOTE: Amendment 3 (UPDATE) with no official SF 30, was issued via PIEE Module to correct the updated due date within the module itself, to reflect the changes in the official SF 30 Amendment 2. This was done purely to correct the PIEE module. By acknowledging the SF 30 for Official Amendments 1-3, you are acknowledging PIEE amendments 1-4.*** //AMEND 3 (UPDATE 3): Updated Response Date date on Solicitation platform. Amendment 2 SF30 is the last official amendment to the solicitation and includes the same response date/due date. ///AMEND 2- REMINDER YOU MUST ACKNOWLEDGE ALL AMENDMENTS. This amendment includes: 1. Add revised Attach 1_SOW18May26 Block 14 (Description of Amendment/Modification):2. Add revised Attach 3_Spec Section 075420 _Adhered PVC Roofing Membrane_19May26 3. Add revised Attach 5_AF Form 66_19May26 4. Add Attach 17_SiteVisitSignin 5. Add Attach 18_Q and A 6. Add Attach 19_Additonal BLD 1284 Drawings 7. Add Attach 20_Areial View_All BLDS 8. Add updated FAR 52.222.90 Addressing DEI Discriminating by Federal Contractors. (Deviation 2026-O0040, Revision 1) 9. Bid due date has been changed to 10 June 2026, 12pm MT. Bid opening has been changed to 10 June 2026, 2:30pm MT.///////AMEND 1- Add clause 52.999-90, Update Attachment 15, Add attachments 16 and 17 (Please note Attachment 17 is not showing on amendment. Will be added officially on next amendment.), remove CLIN 1005-BLD 34 and extend due date as government is pending Q-A completion.// Please review all attachments pertaining to this requirement. Bids MUST be submitted through the PIEE Solicitation module. SITE VISIT Information A has been scheduled for 4 May, 9:00 AM (Mountain Daylight Time) and all parties will meet at the BLD 1284 site visit back side, 7100 Saber Road, F.E. Warren AFB,WY 82005. Attendance at the site visit will be limited to no more than three (3) representatives per company.*All attendees MUST bring their own safety harness. ****Please submit all EAL and BASE EAL information NLT than 27 April 2026, 10:00 AM (Mountain Daylight Time (MDT)).Submit names and SSN to contact@example.gov, contact@example.gov, contact@example.gov AND contact@example.gov. Failure to provide the needed information to the people listed above by 27 April, WILL result in your company not being admitted to visiting BLD 1164 and may result in denial of base access. Due to a quick turnaround, those who are not admitted on either EAL, may not know of rejection until day of the site visit. Every attempt to notify those rejected will be made prior to visit, if information is provided to CONS. We will not hold an individual site visit for those who miss the deadline and/or are rejected via a background check.***For those wanting to see all buildings, please provide a copy of each persons drivers license (DL) (FRONT SIDE ONLY), AND social security number (SSN) to the people listed above. If you prefer to send your information via DoD SAFE, a request for a link can be made to the CA, CO and people listed above. Links must be requested in sufficient time to meet the deadline for information requested. Failure to do so will result in not visiting BLD 1164 and possible base access denial. Contractor Administrator (CA): Email: contact@example.gov, Mr. Arthur W. Makekau, 90 CONS/PKAA Contracting Officer (CO); Email: contact@example.gov 1164 will be the last building to visit, providing for contractors to see the other 5 buildings. Failure notifying the CA AND CO of attendance could result in your company missing the site visit. No individual site visits will be authorized. Point of Contact (POC) for base access/EAL requests are contact@example.gov, contact@example.gov, contact@example.gov AND contact@example.gov.

More opportunities from Department Of Defense → FA4613 90 Cons Pk

Same awarding agency

NAICS: 488190
Federal
Notice of Intent to Single Source MH-139A Battery Maintenance Service
Solicitation # FA461327Q1002
The 90th Contracting Squadron at F. E. Warren AFB, Wyoming, intends to award a single-source, firm-fixed-price contract to Carter's Avionics & Aviation Maintenance, LLC for comprehensive maintenance of up to ten sets of Government-owned MH-139 Nickel-Cadmium batteries. This acquisition is conducted under the statutory authority of 41 USC 1901 and is designated as a total small business set-aside under NAICS code 488190. The anticipated award date is approximately October 30, 2026. However, funds are not currently available, and the government's obligation is contingent upon the appropriation of funds. The government reserves the right to cancel this notice without reimbursing offerors for any costs. The scope of work requires the contractor to provide all necessary personnel, equipment, and facilities in or near Cheyenne, Wyoming, to perform storing, servicing, inspecting, fluid leveling, discharging, charging, and testing of batteries in accordance with OEM specifications and USAF Technical Order 00-20-1. Key performance requirements include maintaining at least two batteries in warm status, ready for pickup within 30 minutes 24/7, while others remain in standby mode. The contractor must ensure 100% accuracy in Government Property Transfer Records and provide documented certification for all personnel. Strict adherence to AFOSH safety standards, environmental laws, and operational security protocols regarding controlled unclassified information is mandatory. This effort is identified as an essential service under R-DFARS 237.7602(a).
Other Support Activities for Air Transportation

POSTED

14 days ago

DEADLINE

in 1 day
View Details
NAICS: 238220
Federal
Post Indicator Valve (PIV) Installation – Building 324The contract requires the installation of a vertical Post Indicator Valve on the north side of Building 324, located in an area with ZIP code 82005. The scope includes excavating and preparing the ground for the valve, connecting it to an underground water line, and ensuring proper backfilling and compaction of the soil. The installation must interface seamlessly with the building’s existing interior fire suppression system to maintain operational integrity and compliance with fire safety standards. All work must be performed in accordance with applicable codes and specifications to ensure long-term reliability and accessibility for maintenance and inspections. The contract is classified as a subcontract under NAICS code 238220, indicating it falls under the plumbing and HVAC contracting sector. It is associated with the Department of Defense through the agency designation FA4613 90 Cons Pk, pointing to a military or federal facility context. The posting date is listed as August 6, 2026, suggesting this is a forward-looking procurement likely tied to infrastructure upgrades or new construction projects. The place of performance is confirmed as 82005, though specific city and state details are not provided, and no point of contact or set-aside details are listed, indicating a standard open bidding process under federal contracting guidelines.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS