Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

PLA Survey for Human Performance Wig Lab at WPAFB

Active
W912QR27RA0TNFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Wright Patterson AFB, OH, USA

Set-Aside

NONE

Documents

(1)

PLA Market Survey - Wright Patterson Airforce Base (W912QR27RA0TN)

PDF•sources-sought

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA
Contacts
Thomas Nauert

Full Description

Show more

The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) for a large-scale construction project (exceeding $35 million) for the following:


Project scope: Construct a two-story laboratory and research facility utilizing conventional design and construction methods to accommodate the mission of the facility. Work will include a reinforced concrete floor slab, poured concrete foundation, structural steel frame, precast concrete exterior wall panels, flat membrane roof, fire protection systems, intrusion detection system, all necessary utilities, precise heating, ventilation and air-conditioning and humidity controls, isolation from building vibrations, and site improvements. This facility includes secure/non-secure laboratory space/administration space, Intelligence Community Directive (ICD) 705, RF Shielding, an elevator, raised-floors and mission support space. Local materials and construction techniques shall be used where cost effective. Construct over 100 parking spaces.



A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f).  For further awareness on PLAs, please visit  https://www.dol.gov/general/good-jobs/project-laboragreement-resource-guide.



Federal Acquisition Regulation (FAR) Policy:


  1. Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement.  Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects.
  2. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will:

  1. Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and  
  2. Be consistent with law.

References:


Provision: 52.222-33 Notice of Requirement for Project Labor Agreement


Clause: 52.222-34 Project Labor Agreement.



In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs.  Of particular interest to the Government are responses to the following questions:



  1. Do you have knowledge that a PLA has been used in the local area on projects of this kind?  If so, please provide supporting documentation.
  2. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project?  If so, please elaborate and provide supporting documentation where possible.
  3. Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed?  If so, please elaborate and provide supporting documentation where possible.
  4. Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 
  5. Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
  6. Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
  7. Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
  8. What cost impact do you expect if PLA requirements are included?
  9. Please select one of the following:
    1. My company will not submit a proposal if PLA is required but is interested in proposing if PLA is not a requirement.
    2. My company plans to submit a proposal whether PLA is required or not.
    3. My company only plans to submit a proposal if PLA is required.

In addition to affirmative responses, we are seeking negative responses to identify any potential actions we may take to improve the competitive environment. Please provide a response with feedback including rationale for not wanting to submit a proposal and any recommendations that could promote interest.



* Please provide your comments via e-mail to Thomas.s.Nauert@usace.army.mil no later than 2:00 PM Eastern Standard Time on 07 October 2026.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Federal
Fort Lee Vehicle Recovery Range
Solicitation # W9123626BA006
Solicitation W9123626BA006 is a 100% competitive 8(a) small business set-aside design-bid-build procurement issued by the W2SD Endist Norfolk for the construction of a Vehicle Recovery Range at Fort Lee, Virginia. The project scope involves the excavation of existing roadbeds and the construction of 24 concrete turning pads, including necessary site drainage improvements and road alignment and repair. The work is structured into three distinct phases, where the contractor is granted access to only one phase at a time, and completion of each phase is required before proceeding to the next. While the first phase is the base requirement, phases two and three are optional and will only be performed if the government exercises those options. The contract requires a performance period of 365 calendar days, with work commencing within 10 days of the award and notice to proceed. Award will be granted to the responsible contractor who submits the lowest responsive bid based on the total price of CLINs 0001 through 0003. Bidders must submit their offers electronically via the Procurement Integrated Enterprise Environment (PIEE) and provide both performance and payment bonds. Following Amendment 0005, the bid due date and opening date have been extended to September 29, 2026, and the solicitation now incorporates corrected drawings and specifications dated May 26, 2026.
W2SD Endist Norfolk

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
Total Maintenance for Critical Facilities at USAG Humphreys and Camp Yongin
Solicitation # W51LL526RA004
Solicitation W51LL526RA004 is a request for quotes for a requirements contract to provide total maintenance and operation of critical facilities at USAG Humphreys and Camp Yongin. The scope of work involves providing all personnel, equipment, and non-personal services for preventive maintenance, on-call service, minor repairs, and unscheduled maintenance of HVAC systems, electrical equipment, and built-in food service equipment across 36 facilities. The period of performance consists of one 12-month base year, which includes a three-month phase-in period starting December 15, 2026, and four subsequent 12-month option years. The government will utilize a two-phased evaluation process to award the contract based on best value. Phase I consists of a technical acceptability review of business licenses and key personnel, including a Contract Manager, Quality Control Manager, and HVAC Engineer. Proposals that are rated acceptable will proceed to Phase II, which involves a best-value trade-off analysis considering technical management, past performance, and price. Offerors must be eligible Korean contractors and submit their proposals electronically via the PIEE portal. The contract is performance-based, requiring the contractor to adhere to a Quality Control Plan and meet measurable standards of quality and timeliness, with oversight provided by the Contracting Officer's Representative through a Quality Assurance Surveillance Plan.
0411 Aq Hq Contract Augmented

POSTED

about 10 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221
Solicitation # FA813726R0021
Solicitation FA813726R0021 is a firm-fixed-price construction project for the removal and replacement of fire sprinklers in plasma booth dust collectors and the replacement of the building fire alarm system at Tinker Air Force Base, Building 3221. This opportunity is exclusively available to current Tinker AFB MACBOA holders under NAICS 236220 and is designated as a 100% small business set-aside. The project requires a comprehensive scope of work including design, engineering, materials, and labor, with a mandatory performance period of 300 calendar days starting within 10 days of the notice to proceed. The procurement utilizes a two-step sealed bidding process. Step one requires a mandatory site visit and the submission of a technical proposal focusing on capability, management, schedule, and key personnel. Only offerors found technically acceptable will proceed to step two, which involves the submission of a price bid. Award will be granted to the lowest evaluated priced proposal that meets all technical acceptability standards and is determined to be responsible. Key requirements include the provision of performance and payment bonds, an offer guarantee, and strict adherence to security protocols, including the REAL ID Act and AFMC Form 387 badging for base access. Technical specifications are governed by the DoD Building Code and NFPA 69 standards. Following amendment 0001, the final response deadline for proposals has been extended to October 2, 2026.
FA8137 Afsc Pzioc

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Federal
Design-Build (DB) and Design-Bid-Build (DBB) Firm Fixed Price (FFP), Indefinite Delivery /Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for new construction, renovation, and demolition for general construction projects for the NA
Solicitation # N6945026R0011
Solicitation N6945026R0011 is a total small business set-aside for a Multiple Award Construction Contract under the NAVFAC Southeast Area of Operations. This Indefinite Delivery/Indefinite Quantity contract utilizes both Design-Build and Design-Bid-Build Firm Fixed Price structures to cover new construction, renovation, and demolition projects. While the primary locations of performance are Naval Air Station Jacksonville and Naval Station Mayport in Florida, the scope may extend to other sites across the United States if determined to be in the best interest of the government. The procurement process requires offerors to provide comprehensive documentation, including detailed construction and design experience project data sheets and past performance questionnaires to evaluate quality and management capabilities. Additionally, bidders must submit a safety data sheet covering five years of safety metrics and a narrative describing their safety management system. Administrative requirements include registration in the Procurement Integrated Enterprise Environment and the use of ProjNet for submitting pre-proposal inquiries. The solicitation was posted on September 2, 2026, with a response deadline of October 2, 2026.
Navfacsyscom Southeast

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 236220
New
Federal
Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)
Solicitation # W912QR-CMAR-ArmyReserveDevensSheridanPatton
The U.S. Army Corps of Engineers, Louisville District, is conducting a Request for Information to gather market intelligence for three separate military construction and sustainment projects for the Army Reserve program. The government is evaluating a Construction Management at Risk (CM@Risk) delivery strategy executed under Other Transaction Authority (OTA) pursuant to 10 U.S.C. section 2808a. This approach aims to utilize commercial best practices and streamlined delivery models to accelerate schedules and improve cost transparency. The three projects under consideration include a 46,000 square foot Collective Training Enlisted Barracks at Devens Reserve Forces Training Area in Massachusetts with an estimated value of 35 to 45 million dollars, a 19,000 square foot Area Maintenance Support Activity facility at Fort Sheridan in Illinois estimated between 30 and 40 million dollars, and a 1,500 square foot Parachute Drying Tower at Patton USARC in California estimated between 5 and 15 million dollars. The planned acquisition strategy involves a two-phase execution. Phase 1 focuses on preconstruction services, including constructability reviews and value engineering, compensated by a firm-fixed-price fee. Phase 2 transitions the contractor to an at-risk general constructor under a negotiated Guaranteed Maximum Price (GMP) for construction execution. The government is seeking detailed information from industry regarding OTA experience, CMAR capabilities, bonding capacity, and technical expertise in specialized military facilities. Interested firms must submit their responses exclusively via the designated online survey form by October 5, 2026, at 11:00 AM Eastern Time. This RFI is for planning purposes only and does not constitute a formal solicitation or a commitment to award a contract.
Commercial and Institutional Building Construction

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
FCKY UEPH Barracks CM@Risk
Solicitation # W912QR-CMRISK-Campbell
The U.S. Army Corps of Engineers (USACE) Louisville District has issued a Request for Information (RFI) to conduct market research for the design and construction of two Unaccompanied Enlisted Personnel Housing (UEPH) barracks at Fort Campbell, Kentucky. Each barracks is intended to accommodate 260 personnel, with the total estimated acquisition magnitude valued at approximately $205 million. The government is specifically exploring a Construction Management at Risk (CM@Risk) delivery strategy utilizing Other Transaction Authority (OTA) under 10 U.S.C. § 2808a. This proposed approach involves a two-phase execution plan: a Preconstruction Phase focused on constructability reviews, value engineering, and open-book pricing to establish a Guaranteed Maximum Price (GMP), followed by a Construction Phase where the builder executes the physical construction at risk under that validated GMP. This RFI is for informational purposes only and does not constitute a formal solicitation or request for proposal. The government is seeking industry feedback on various acquisition elements, including evaluation criteria such as past performance, key personnel experience, and fee structures, as well as technical matters like phased bonding approaches and subcontractor risk mitigation. Interested firms are invited to submit company profiles and responses regarding their experience with OTA and innovative construction technologies. Submissions must be sent in PDF format to Mr. Ranzel L. Merideth via email no later than 13 October 2026 at 1200 PM ET. Responses should not exceed 15 pages, excluding standard company brochures or profiles.
Commercial and Institutional Building Construction

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
Market Intelligence - Richmond ARC - CM at Risk
Solicitation # W912QR-CMRISK-RICHMOND-ARC
The U.S. Army Corps of Engineers, Louisville District, is conducting a Request for Information to gather market intelligence for the construction of a 300 Member Army Reserve Center and an Un-Heated Storage building in Richmond, Virginia. The project involves a facility of approximately 56,678 square feet for the center and 1,217 square feet for the storage building, with an estimated acquisition magnitude between 30 million and 50 million dollars. The government is evaluating a Construction Management at Risk strategy utilizing Other Transaction Authority under 10 U.S.C. section 2808a, which allows for the integration of new and emergent construction technologies to improve mission resilience and reduce costs. The proposed execution plan consists of two phases. In Phase 1, a builder will be onboarded at approximately 90 percent design completion to serve as a consultant, helping the Designer of Record finalize the design to 100 percent for a fixed preconstruction services fee. In Phase 2, the contractor will transition to an at-risk role to execute construction under a Guaranteed Maximum Price. The government is currently seeking industry feedback on this acquisition strategy, including experience with OTA and CM at Risk delivery, bonding capacities, and the suitability of the design entry point. Responses are required via a specific survey form by 2 October 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS