Placerville 49 CAPM,EA 03-2J110/EFIS 0321000189
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project on State Route 49 in Placerville, California, aims to extend the service life of the existing pavement through cold planing of 0.25 feet followed by resurfacing with 0.25 feet of Rubberized Hot Mix Asphalt configured as Gap Graded. Alongside pavement rejuvenation, the scope includes comprehensive improvements to the drainage infrastructure to enhance water management and reduce long-term deterioration. All existing curb ramps will be upgraded to fully comply with Americans with Disabilities Act standards, ensuring accessibility for all pedestrians. Traffic signal modifications are planned to improve flow and safety, and a new maintenance vehicle pullout will be constructed to facilitate efficient agency operations and reduce disruptions during maintenance activities. The project also encompasses full updates to signage and roadway striping to align with current standards and improve driver guidance. The work is managed by Caltrans District 3, with primary coordination handled by Associate Environmental Planner Obaida Akther, and is forecasted for posting on July 2, 2026, with performance localized to the Placerville area in California.
General Info
Agency
NAICS
Place of Performance
On SR?49 from 0.1?mile north of Skyline Drive to 0.1?mile north of Diana Street in El Dorado, Placerville, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
