This Government Contract opportunity from Department Of Agriculture was posted on September 30, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Placerville Nursery Greenhouse Grading and Infrastructure project, solicitation number AG-9A63-S-10-0070, is a Service Disabled Veteran Owned Small Business set-aside awarded by the USDA Forest Service for the Eldorado National Forest in Camino, California. With a government estimate between 500,000 and 1,000,000 dollars and a contract duration of 160 days, the project involves the excavation and grading of building pads to accommodate six prefabricated greenhouse structures. The scope of work includes trenching, backfilling, placement of aggregate base, and the construction of concrete slabs and an 800-foot paved access road.
Comprehensive infrastructure installation is required, including underground utilities, waterlines with associated pressure testing and disinfection, storm drainage systems with rock protection, and a liquefied petroleum gas system. Electrical work consists of installing underground feeders, conduits, and distribution panels for the new greenhouses. Additional requirements include field engineering, construction staking, hydroseeding and mulching for erosion control, and the implementation of a waste site management plan. The project is governed by strict technical specifications regarding material standards, quality assurance, and environmental protections, including noise and dust control.
HighAI Summary for Amendment AG-9A63-S-10-0070 - Placerville Nursery Greenhouse Expansion: Amendment to solicitation AG-9A63-S-10-0070 for the Placerville Nursery Greenhouse Expansion, issued by the USDA Forest Service on 08/17/2010. The purpose of this amendment is to provide attached drawings to the offerors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for c11.0_details - Utility and Fire Hydrant Details: Technical detail drawings and specifications for utility installations, including fire hydrant relocation, valve box details, line termination, and double check valve assembly. Includes specific material requirements such as Christy G5 valve boxes and 4-inch C900 reaction blocking.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for C8.0 Storm Drain Details: Technical engineering details and specifications for storm drain installation, including drop inlet sections, subdrainage details, and outfall profiles, prepared by Lamp Engineering.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Colorado Natural Resources Department Electrical Plans - Site and Utility Schedule: Technical specifications and schedules for electrical site utilities, including main feeder and conduit schedules, below-grade enclosure details, and structural removal lists for the Colorado Natural Resources Department project. Document includes engineering data from Lampe Engineering.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Eldorado Nursery Greenhouse Grading Construction Plans: Construction plans index and legend for the Eldorado Nursery Greenhouse Grading project, dated August 2010, for the USDA Forest Service Region 5. The document includes a sheet index covering site maps, grading plans, utility and electrical details, and a comprehensive legend of abbreviations and symbols.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Eldorado Nursery Greenhouse Grading Plan (Finish Grade): A technical grading plan for the Eldorado Nursery Greenhouse within the Eldorado National Forest, dated July 1956. The document includes a control point coordinate list, finish grade elevations, concrete slab specifications, and detailed dimensions/annotations for subdrainage and building lines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Electrical Details Sheet: Electrical detail sheet / drawing titled "Sea Surface Finish Detail" with multiple construction and electrical installation details. Includes below-grade pull and splice box, panel backboard, transformer and service entrance notes, electrical trench detail, grounding bus, conduit sizes, and a 400 amp 3-phase panel schematic. Dated Jan 2019, Rev Draft, N.T.S. It appears to be part of a technical design package rather than a solicitation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Grading Plan - c6.0_grading3: Technical drawing/specification document for grading and paving, featuring cross-sections (A through S) for a paved access road. Includes details on 6-inch concrete slabs, sand bases, area drains, and rebar specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greenhouse Grading Plan (Subgrade) - Eldorado National Forest: Technical grading and subgrade plan for a Greenhouse project at the Eldorado National Forest, prepared by Lampe Engineering. The document includes a site volume table for subgrade coordinates and a control point coordinate list.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Green House Grading - Summary of Estimated Quantities: A quantity summary sheet (Sheet C3.0) dated 8/16/10 for the Green House Grading project. The document details estimated quantities for site excavation (cubic yards) and aggregate base (tons), associated with the U.S. Forest Service Eldorado National Forest in Placerville, CA.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lampe Engineering - Site Volume Table and Waste Site Management Plan: Technical document from Lampe Engineering containing a site volume table for grading (Pond5), site layout notes regarding drainage and culverts, and a waste site management plan addressing contaminants and EPA regulations.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Placerville Nursery Expansion - Summary of Work: This document is a Summary of Work (Section 01010) for the U.S. Forest Service's Placerville Nursery Expansion at the Eldorado National Forest in Camino, CA. It details the scope of work, including excavation and grading for six prefabricated greenhouse structures, installation of underground irrigation and storm water systems, utility installation, concrete slab construction (optional), and the construction of an 800-foot paved access road. It also outlines owner responsibilities, contractor site usage rules, noise and dust control requirements, and seasonal construction limitations.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Placerville Nursery Greenhouse Expansion Technical Specifications: Technical specifications for the Placerville Nursery Greenhouse Expansion project. The document provides a comprehensive list of work sections, including field engineering, site preparation, utility trenching, concrete, metals, and electrical systems.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Section 01050 Field Engineering: Section 01050, Field Engineering. This specification section sets contractor responsibilities for surveying, construction staking, vertical control, preservation of monuments, structure staking, and materials testing. It includes accuracy requirements, approval by the Contracting Officer, and density/gradation testing standards. Part 4 states field engineering and construction staking are incidental to the work and referenced to the bid schedule for measurement and payment.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01051 - Construction Staking and Project Control: Technical specifications for construction staking and project control, detailing construction tolerances for roadways, structures, and pipelines. It outlines requirements for establishing control point monuments, staking for utilities and walkways, materials testing responsibilities, and compaction testing standards (ASTM D1557). Payment is designated as a lump sum under field engineering.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01200 - Project Meetings: Technical specification section 01200 outlining requirements for preconstruction and periodic progress meetings. It defines mandatory attendance for contractors and subcontractors, standard meeting agendas, and specifies that meeting costs are incidental to the bid items with no separate payment.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01300 - Submittals: Technical specification section 01300 detailing submittal requirements for construction. It outlines the necessity for construction schedules, schedules of values for items over $25,000, and Storm Water Pollution Prevention Plans (SWPPP), as well as procedures for shop drawings, product data, samples, and approved substitutions.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01510 - Temporary Services: Technical specifications for Temporary Services (Section 01510), detailing requirements for sanitary facilities, fire protection equipment, storage sheds, spill response materials, and utility access. It includes mandates for U.S. Forest Service fire plan compliance and specifies that payment for these services is incidental to other bid items.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01530 - Barriers: Technical specifications for the furnishing, installation, and maintenance of barriers and construction signs. The document outlines product requirements (MUTCD 2009 compliance), execution standards for public protection, and specifies that payment for barriers is incidental to other construction items.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01700 - Project Closeout: Technical specifications for project closeout procedures, including final clean-up, closeout submittals, record drawings, and final inspection requirements. It outlines the process for achieving substantial completion and the criteria for final acceptance of the work.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 01900 - Mobilization: Technical specifications for Section 01900 (Mobilization), detailing requirements for the movement of personnel and equipment, mandatory equipment cleaning to prevent noxious weed seeds, and the lump sum measurement and progress payment schedule.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02221 - Utility Trenching and Backfilling: Technical specifications for utility trenching and backfilling, covering the installation of pipelines, culverts, conduits, and cables. The document details quality assurance requirements, ASTM testing standards, material classifications for backfill (Classes 1-4, permeable, and flowable fill), excavation procedures, and shoring requirements.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Section 02223 - Excavation and Embankment: Section 02223 of a construction specification covers excavation and embankment work. It describes scope, quality assurance, material requirements, excavation and grading procedures, utility protection, embankment placement and compaction, density requirements, ditch construction, subgrade tolerances, slope finishing, erosion and sediment control, and measurement/payment references. The section includes technical performance requirements and bid/schedule references relevant to construction execution.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02229 - Utility Line Marking: Technical specifications for the furnishing and installation of utility line marking tape. It details material requirements (metallic foil and plastic film), APWA color coding for electric, water, and drainage systems, installation procedures, and specifies that payment is incidental to other utility items.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02232 - Aggregate Base Course: Technical specifications for the furnishing, placing, and compaction of aggregate base course. The document details material gradation requirements (Cal Trans Section 26), quality assurance, compaction standards (95% maximum density per AASHTO T180-74), surface tolerances, and payment terms.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02271 - Rock Protection: Technical specifications for Section 02271 Rock Protection, detailing the requirements for furnishing and placing Class 3 stone riprap for slope protection at storm drainage outlets. It includes material gradation requirements per Federal Highway Standard Specification 705, installation procedures for filter fabric and rock placement, and guidelines for measurement and payment.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02553 - Asphalt Concrete Pavement: Technical specifications for the construction of asphalt concrete pavement. The document details requirements for polymer-based asphalt, quality assurance, submittals (including job-mix formulas), aggregate gradation standards per Cal Trans Section 39, equipment requirements for hauling and paving, and execution procedures for spreading and finishing the mix.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02600 - Water Lines and Appurtenances: Technical specifications for the furnishing and installation of water lines (8-inch and smaller) and associated appurtenances. The document details requirements for PVC pressure pipe (AWWA C900), PVC Schedule 40 pipe (ASTM D-1785), fittings, and valves, including material standards, jointing methods, and quality control inspection requirements.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02602 - Testing and Disinfecting Water Lines: Technical specifications for the pressure testing, leak testing, and disinfection of water lines and appurtenances. It details required work sequences, testing equipment, pressure requirements (150% of working pressure or 200 psi), a 2-hour test duration, and specific chlorination methods (tablet and continuous-feed) in accordance with AWWA C651.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02609 - Storm Drainage Systems: Technical specifications for the furnishing and installation of storm drainage systems, including ABS and high-density corrugated plastic pipe (CPP). The document details material standards (ASTM/AASHTO), pipe stiffness requirements, bedding and cover materials, installation tolerances, and payment terms.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 02931 - Seeding and Mulching: Technical specifications for hydroseeding and erosion control mulching. It details the required seed mix (46 lbs/acre), fertilizer (BIOSOL MIX), mulch materials, subsoil preparation, hydraulic application methods, and measurement/payment terms based on acreage.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 03306 - Structural Concrete: Technical specifications for structural concrete work, specifically for greenhouse access pads and miscellaneous structures. The document details requirements for submittals, quality assurance (ASTM C94-90), material standards for forms and reinforcement, mix designs, compressive strength (3,000 psi), and execution procedures including subgrade preparation, placement, and curing.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 05120 - Miscellaneous Metals: Technical specifications for miscellaneous metal materials, including protective bollards and support structures. It outlines requirements for submittals, quality assurance (AISC), material standards (ASTM A36, A563, A307), welding (AWS D1.1), and execution/erection procedures.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 15487 - Liquefied Petroleum Gas System: Technical specifications for the furnishing and installation of a Liquefied Petroleum Gas (LPG) system. The document details requirements for licensed contractors, compliance with UPC and NFPA 58/54 codes, material standards for regulators, valves, and piping (including PE and black iron), installation procedures, and pressure testing requirements.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Section 16400 Electrical System Specifications: Technical specifications for the installation of electrical systems, including underground feeders, conduit, and distribution panels for two new greenhouses. The document details compliance with the 2002 NEC, material requirements for conduits and wiring, and execution standards for grounding and bonding.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for SF 30 Amendment to Solicitation - Placerville Nursery Greenhouse Expansion: Standard Form 30 amendment to solicitation for AG-9A63-S-10-0070, Placerville Nursery Greenhouse Expansion, effective 08/12/2010. It changes the solicitation issue date to sometime the week of August 16, 2010 and reschedules the pre-bid meeting to August 25, 2010 at 10:00 a.m. at the nursery location in Camino, CA. All other terms and conditions remain unchanged.
DOC
DOC, High priority: read this firstrfp
HighAI Summary for Solicitation AG-9A63-S-10-0070: Placerville Nursery Greenhouse Expansion: Request for Proposals (RFP) issued on 08/17/2010 by the USDA Forest Service for the Placerville Nursery Greenhouse Expansion in Camino, CA. This is a Service-Disabled Veteran-Owned Small Business set-aside with a government estimate between $500,000 and $1,000,000. The document includes a detailed bid schedule for construction items such as excavation, aggregate base, waterlines, and drainage systems. Offers are due by September 15, 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for U.S. Forest Service Eldorado National Forest - Thrust Block and Pipe Trench Details: Technical engineering specifications and detail drawings for pipe trenching and thrust block installation for the U.S. Forest Service in Eldorado National Forest, Placerville, CA. Dated 6/10/16, the document includes requirements for soil bearing capacity, concrete placement, and roadway vs. non-roadway section details.
PDF
PDF, Low priorityother
LowAI Summary for c15.0_grading3.pdf: The document contains fragmented, repetitive text and alphanumeric strings that appear to be OCR errors or corrupted data. No clear procurement purpose, solicitation details, or contractual terms are identifiable.
PDF
PDF, Low priorityother
LowAI Summary for c2.0_site_keyin.pdf: The document appears to be a fragmented or corrupted file containing repetitive timestamps, design review references (DR 90), and mentions of 'ANDREWS DESIGN GROUP, INC.' It does not contain a coherent procurement solicitation, contract, or technical specification.
PDF
PDF
PDF
PDF
OCTE
OCTET-STREAM
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
4 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Tahoe National Forest
Placerville Nursery Greenhouse excavation and grading of building pads to accommodate future greenhouses. Work includes trenching, backfill, placement of aggregate base on pad, installation of underground utilities, waterlines and appurtenances, storm drainage, seeding, mulching, and construction of concrete slabs. The project is located from US 50 in Placerville, go east on US 50 5.4 miles to Camino. Turn left off US 50, then immediately left again onto Carson Road. Follow Carson Road 1.4 miles to the intersection with North Canyon Road. Turn right on North Canyon, then left onto Fruitridge. Follow Fruitridge 0.5 miles to the Nursery. The Nursery is located at 2375 Fruitridge Road. NOTE: There will be a PRE-BID meeting at this location on August 18, 2010, 10:00 AM. Estimated start work date September 20, 2010, contract time 160 days. Government estimate is between $500,000 and $1,000,000. Estimated SOLICITATION issue date is AUGUST 6, 2010. This is a Service Disabled Veteran Owned Small Business Set-Aside.