This Government Contract opportunity from Department Of Defense was posted on September 30, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 015_napc164014 - Stormwater and Pump Station Removal Plans: Technical document dated 10/15/2023 detailing the removal of existing stormwater vapor permeable surfaces, power poles, and pump stations (PS T-1 through T-4). Includes specific elevation data for Gatewell 4 and references concrete construction specifications and block maps.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 016B_napc164015B - Site Plan/Specifications: Technical drawing and specification notes for road work on County Road 42. Includes instructions for removing/replacing fencing, trees, and culverts, as well as the removal of light poles (LP1-LP9) and requirements for recycling bituminous pavement and aggregate base.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0010 to Solicitation W912ES-09-B-0004: Amendment 0010 dated June 25, 2010, for solicitation W912ES-09-B-0004. Key changes include revisions to the Bidding Schedule (CLINs), updated construction drawings, and modifications to the SF1442 project description. Technical updates include revised timelines for the Highway 212 Road Raise, new payment terms for preconstruction damage surveys, and the addition of approved borrow sources and clay agreements within the Earthwork specifications.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for City of Montevideo and Arthur C. Starbeck Clay Purchase Agreement: Purchase agreement dated July 6, 2009, between the City of Montevideo and Arthur C. Starbeck (Trustee) for the acquisition of clay borrow material from specific tracts in Chippewa County, Minnesota, to support the USACE Flood Control Project, Stage 2. The agreement specifies a price of $0.60 per cubic yard, terms for topsoil disposal, haul road maintenance, and requirements for conditional use permits.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Construction Plan for Trunk Highway No. 212-12: Construction plans and technical specifications for Trunk Highway No. 212-12 between Montedice Corp. limits and Jct. T.H. 29 at Montevideo, Minnesota. The document includes a construction plan for a sand gravel sub-base, itemized quantities for clearing and excavation, typical sections for roadways and driveways, and detailed engineering notes dated July 1, 1964, with revisions noted up to 1995.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing M34-P-64/015C - Site Plan/Work Limits: Technical drawing and specifications document (Sheet 20 of 112) detailing work limits for a construction project dated March 2020. It includes instructions for removing light poles, trees, fences, and bituminous pavement, as well as notes on recycling aggregate base and sand-gravel subbase.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MNDOT1212-05 Technical Specifications: Technical document containing mass flow calculations, sand-gravel sub-base diameter and depth specifications, and detail plans for stone rock structure sub-bases. Includes data accurate as of 1/1/2005 and 1/1/1995.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MNDOT Bridge No. 8/16 Typical Sections and Specifications: Technical document dated 12/31/98 regarding the construction of Bridge No. 8/16 (100 ft length). It includes engineering notes, material finishes (painted brick), typical section drawings (S P 122-06 and S P 1206-28), and itemized quantity/pricing tables for construction materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MNDOT Project 1212-06 - Typical Sections and Estimated Quantities: Technical document for Minnesota Department of Transportation (MNDOT) project 1212-06 (T H: 212-12). It contains a Statement of Estimated Quantities, typical sections for grading and subbase, and specific engineering data for highway construction, including stationing for north/south bound connections and guard rail installation details.
PDF
PDF, High priority: read this firstbid-abstract
HighAI Summary for Monrovia Stage 2, Montevideo, MN - Bid Abstract (W912ES-09-B-0004): A signed bid abstract for solicitation W912ES-09-B-0004 (Monrovia Stage 2, Montevideo, Minnesota) by the U.S. Army Corps of Engineers. The document records bid openings from July 14, 2010, and includes a detailed comparison of government estimates versus the bid price from Earthworks Technology, Inc. for base items and options, including earthworks, demolition, and infrastructure components. Certified by Contracting Officer Kevin Henriks on July 15, 2010.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Flood Control Stage 2 - Amendment 0010: This document contains construction drawings and technical specifications for the Montevideo Flood Control Stage 2 project in Chippewa County, Minnesota. It includes a vicinity map, site map, horizontal and vertical control benchmarks, and a contract and reference index. The document is identified as being revised with Amendment No. 0010 (dated 06/2010) and contains technical data as of October 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Montevideo Flood Control Stage No. 2 Construction Drawings: Construction drawings and technical specifications for the Montevideo Flood Control Stage No. 2 project by the US Army Corps of Engineers, St. Paul District. The document includes a vicinity map, drawing index, site maps, borrow site details, horizontal and vertical control benchmarks, and traffic control requirements conforming to MMUTCD standards.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0002 (W912ES-09-B-0004): Amendment 0002 to contract W912ES-09-B-0004. This document provides a summary of changes specifically revising Section 01 22 00.00 13, Measurement and Payment, paragraph 1.8.33 regarding the Manhole T-3 Structure. It defines the payment terms as a lump sum for all materials, equipment, and labor required for construction, including earthwork and installation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0003: Amendment 0003 to solicitation W912ES-09-B-0004, dated May 4, 2010. The amendment updates language in sections 01 22 00.00 (Measurement and Payment) and 02 41 00 (Demolition), modifies drawings 64/015A through 64/015F, and extends the bid opening date to May 14, 2010, at 2:00 p.m. local time.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0004: Amendment 0004 (W912ES-09-B-0004) provides a summary of changes to Section 35 20 16.26 13 regarding Sluice Gates and Operators. It replaces Table 1 to reflect the removal of Pump Station T-2 and Gatewell 2, and the addition of Manhole T-1.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0005: Amendment 0005 to contract W912ES-09-B-0004 for the Montevideo Stage 2 project. Key changes include updating the terminology for 'Impervious Fill, Closure' to 'Impervious Stockpile' (CLIN 0073), providing detailed payment and measurement terms for the stockpile, and extending the response deadline from May 14, 2010, to May 18, 2010. The document also includes a comprehensive bid schedule covering the base contract and three options.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0006: Amendment 0006 to solicitation W912ES-09-B-0004 updates the required response date and time from May 18, 2010, to May 21, 2010, at 02:00 PM.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0007: Amendment 0007 to solicitation W912ES-09-B-0004, issued by USACE St. Paul on May 18, 2010. The amendment includes a permit in Section 00B83O0, Attachment C, and replaces the 'SEWAGE PLANT LEVEE (Option 1), Plan and Profile, STA C0+00 To C7+98' drawing.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0008: Amendment 0008 to solicitation W912ES-09-B-0004, issued by USACE - St. Paul on May 19, 2010. The primary purpose of this amendment is to extend the bid submission deadline from May 21, 2010, to June 4, 2010, at 2:00 p.m.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Montevideo Stage 2 Amendment 0009: Amendment 0009 to solicitation W912ES-09-B-0004, issued by USACE - St. Paul on June 2, 2010. The amendment extends the bid due date from June 4, 2010, to July 1, 2010, at 2:00 p.m. and updates the Notice to Proceed (NTP) date in clause 52.211-10 Alt I to August 20, 2010. It also corrects the address for the Contracting Division.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Renovation of Street Bypass w/ Pedestrian Crossing - Drawing 16-002: Technical drawing (Drawing No. 16-002, Revision A0) dated 06/01/2023 for the US Army Corps of Engineers, St. Paul District. The document provides detailed construction specifications and layouts for the Renovation of Street Bypass with Pedestrian Crossing, including concrete pavement, sidewalk row, and garage details.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation W912ES-09-B-0004 Amendment 0011: Amendment 0011 to solicitation W912ES-09-B-0004, issued by USACE - St Paul on June 29, 2010. This amendment corrects a clerical error regarding the revised completion date in Clause 52.211-10 Alt 1, changing it to August 31, 2012, and updates the address for the issuing organization.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912ES-09-B-0004: Montevideo Stage 2 Flood Risk Management: Issued on April 9, 2010, by USACE - St. Paul, this Invitation for Bid (IFB) is for flood risk management construction in Montevideo, Minnesota. The project includes a base contract for Highway 212 road raises, County Road 42 realignment, and levee work, with three optional tasks involving levee raises, pump station modifications, and gravel road improvements. Bids are due by May 11, 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Staging Area Plan (S-01) - Project M34-P-64/011: Technical drawing/plan for a staging area under the US Army Corps of Engineers St. Paul District (Project M34-P-64/011). Dated 01 March 2024, it specifies work limits and required tasks including removal of saturated soils, filling/compacting material, and installation of drainage and erosion controls.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Table 1: Gate Requirements: Technical specification table detailing gate requirements for pump stations and manholes, including pipe diameters, seat/unseated pressures, and hoisting methods.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USACE St. Paul District - Construction Drawing Sheet W-24 (Floor Rise Margin Detail): Technical construction drawing sheet W-24 from the US Army Corps of Engineers, St. Paul District. The document provides a plan for road raise activities, including the removal and recycling of bituminous pavement and aggregate base, and identifies site protections for waterlines, power poles, and signs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USACE St. Paul District - Work Limits and Site Plan: Technical drawing and specifications document from the U.S. Army Corps of Engineers (USACE) St. Paul District. It outlines work limits including tree removal and sign relocation, provides a site plan scale, and lists construction notes regarding pavement recycling, base materials, and sidewalk requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Work Limits Plan - 016D_napc164015D: Technical drawing and site plan dated 05/01/2023 detailing work limits for road removal, recycling, and aggregate base installation. Includes specific instructions for road raises and tree removal.
PDF
PDF, Low priorityaward
LowAI Summary for Public Waters Work Permit #2010-0401 - City of Montevideo: Issued May 13, 2010, by the Minnesota Department of Natural Resources, Permit #2010-0401 authorizes the City of Montevideo to place 5.0 acres of fill and riprap for toe protection in Unnamed Wetland 12-0056. The work is part of a flood control construction project in Chippewa County. The permit expires December 31, 2011, and is subject to specific conditions regarding notification, erosion control, and compliance with the Minnesota Wetland Conservation Act.
TIF
TIF
TIF
TIF
DOC
DOC
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
21 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
The response deadline was removed. The notice description changed. The point of contact changed.
Notice updated
The notice description changed.
Notice updated
Response deadline added: May 11, 2010. The notice description changed.
Notice updated
The response deadline was removed. The notice description changed.
Deadline changed
Response deadline added: May 11, 2010.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from May 11, 2010 to May 14, 2010. The notice description changed.
Notice updated
Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on May 14, 2010. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from May 14, 2010 to May 18, 2010. The notice description changed.
Notice updated
Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on May 18, 2010. The notice description changed.
Notice updated
Response deadline changed from May 18, 2010 to May 21, 2010. The notice description changed.
Notice updated
Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on May 21, 2010. The notice description changed.
Notice updated
Response deadline changed from May 21, 2010 to Jun 4, 2010. The notice description changed.
Notice updated
Response deadline changed from Jun 4, 2010 to May 21, 2010. The notice description changed.
Deadline changed
Response deadline changed from May 21, 2010 to Jun 4, 2010.
Notice updated
Response deadline changed from Jun 4, 2010 to Jul 1, 2010. The notice description changed.
Notice updated
Response deadline changed from Jul 1, 2010 to Jul 14, 2010. The notice description changed.
Notice updated
Response deadline time changed from 7:00 PM UTC to 8:00 PM UTC on Jul 14, 2010. The notice description changed.
Notice updated
Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Jul 14, 2010. The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Montevideo Stage 2, Montevideo, Minnesota. Work consists of but is not limited to the following Base Contract and 3 Options. BASE Contract: 1. Highway 212 road raise of approximately 5,600 LF consisting of 2 lanes with shoulder, turning lanes, guard rail, 720 LF of highway ditch, Gatewell for 72 inch RCP, pump station modifications, fairground & driveway accesses, removals, signs, and detour. 2. County Road 42 realignment, road raise, and removals of approximately 1,100 LF to meet the raised Highway 212. 3. South Tie back levee with entrance/exit driveway (approximately 750 LF). 4. Parkway Dr. road raise (approximately 325 LF). OPTION 1: Raise existing levee at Wastewater Treatment Plant area (approximately 760 LF), riprap, Gatewell 4, pumping pit, manholes, 24 inch RCP, relocation of city owned pumps, electric service and removals. OPTION 2: Pump Station 1 with approximately 1100 LF of levee, 600 LF of ditch, 800 LF of Steel Sheet Pile, 48 inch RCP, Pumps and control panel, electric service, security fence, and riprap. OPTION 3: Raise portion of Gravel Road as part of the 1969 Levee (approximately 300 LF), Gatewell 3, 24 and 36 inch RCP, catch basin, manhole, removals and riprap. The estimated price range for this project is between $5 million and $10 million. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $33.5 million. The solicitation will be issued as an Invitation for Bids (IFB) and will be issued as a 100% set-aside for HUBZone small business concerns. The solicitation is expected to be posted with specifications on www.fbo.gov sometime around mid-December 2009 to mid-January 2010. Please check this website for any changes or updates.