This Solicitation opportunity from Pennsylvania was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Plant PS Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1 - Install Bypass and Recycle Pipelines, Vaults, and Valves

Closed
Canonsburg-Houston Joint Authority, Washington CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Bids for the Plant Pump Station Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1 must be submitted electronically via PennBid by 2:00 p.m. on July 1, 2026. The project involves significant excavation and installation work at the wastewater treatment plant located at 315 Curry Hill Road in Canonsburg, PA. Key tasks include locating existing forcemain lines and installing new bypass lines with valves to allow flow diversion at the plant’s pump station, as well as adding a new recycle line with a flow meter, control valve, and a static mixer vault to facilitate ammonia recycling into the Biotower Pump Station. Electrical power and wiring for these new installations will also be provided under this contract. Bypass pumping must be maintained during construction to ensure continuous operation of the system. Prospective bidders are required to attend a mandatory pre-bid meeting and site walkthrough on June 12, 2026. Proposal documents and bidding forms are available free of charge through PennBid, and bids must include a proposal security of at least 10% of the total bid price. Bidders may revise or withdraw proposals up until the submission deadline, but may not withdraw bids for 60 days after opening. Questions must be submitted electronically via PennBid, with any changes to the bidding documents communicated through official addenda. The Canonsburg-Houston Joint Authority reserves the right to accept, reject, or waive informalities in bids. The work scope ensures installation of necessary infrastructure components while maintaining operational requirements and adherence to wage and contractual regulations.

General Info

Bids due July 1, 2026, for pump station bypass and ammonia recycle upgrades in Canonsburg.

Place of Performance

Washington County, PA, USA

Set-Aside

NONE

Documents

2

Plant PS Bypass and Biotower Recycle Project Contract 1 Bid Specifications.pdf

PDF

Plant PS Bypass and Biotower Recycle Project Contract 1 Plan Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Washington County
ContactsNo contacts available
OfficeWashington County, PA, USA
Office AddressWashington County, PA, USA
ContactsNo contact information available

Interested Companies (43)

Mele & Mele & SonsBraddock, PA
JP Environmental
Gov AlphaBrooklyn, New York

See All 43 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Bids must be submitted electronically to the Canonsburg-Houston Joint Authority via PennBid no later than 2:00 p.m. prevailing time on July 1, 2026, for the following:
Plant Pump Station Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1
The work will consist of excavation to locate the 36” pipe from the Clarifier PS and adding new 24” recycle line to recycle flow into the Biotower PS. A new concrete vault will be installed on the recycle line to contain a new flow meter and flow control valve. A new 36” static mixer and concrete vault will be added. Electrical power and control wiring and conduit shall be provided as part of Contract 1. Additional work will consist of excavation to locate the 18” and 24” force main lines and add tees and bypass lines with valves at the plant main pump station.
The bids will be opened publicly at the Canonsburg Municipal Building located at 68 East Pike Street, Suite 103, Canonsburg, PA 15317 at the apparent time and place.
Prospective bidders are required to attend a mandatory prebid meeting and site walkthrough on June 12, 2026 at 10 a.m. at 315 Curry Hill Road, Canonsburg, PA 15317.
Proposal documents, bidding forms, plans, and specifications may be obtained at no cost via PennBid at https://pennbid.bonfirehub.com. All bids must be upon the form furnished by the Canonsburg-Houston Joint Authority.
Each bid must be accompanied by proposal security in the form of a certified check, bank cashier's, treasurer's check, or bid bond in an amount equal to not less than ten percent (10%) of the total bid price in accordance with provisions contained in the "Instructions to Bidders" section of the specifications. Proposal Security shall be made payable to the Canonsburg-Houston Joint Authority.
The minimum salaries and wages as set forth in the Contract Documents must be paid on this project.
Proposals may be withdrawn, altered or otherwise modified within PennBid at any time prior to the due date and time. No bidder may withdraw its bid for a period of 60 days after date of bid opening.
Questions regarding this project shall be submitted electronically via the “Ask a Question” feature in PennBid no later than the date and time indicated. Responses to questions which require an addendum or changes to the Bidding Documents will be issued via a Public Notice and posted on PennBid. Bidders who have registered with and downloaded documents for this project from PennBid will be notified by email when a change or addenda has been posted.
The Canonsburg-Houston Joint Authority reserves the right to reject any or all bids, to accept or reject any part of any bid, and to waive any and all informalities in connection therewith.
Contract 1 - Scope of Work - The work will consist of two main areas at the WWTP at 315 Curry Hill Road, Canonsburg, PA 15317 as follows:
1. Plant Pump Station Influent Chamber Bypass Lines – The work will consist of excavation to locate the 18” and 24” forcemain lines from the Michigan Avenue Pump Station where they enter the Plant Pump Station influent chamber. A tee will be added on each line with manual isolation plug valves on each branch line to isolate and divert flow directly into the plant PS wet well. Concrete holes shall be drilled into the wet well from the exterior for the new bypass branch lines and link-seal used around the pipes. The valves shall all be located below grade and provided with valve boxes at grade.
One of the two forcemain lines shall remain in operation at all times (unless bypass pumping is provided by Contractor) which will require plugging of the other line at the influent chamber which is currently under construction. Bypass pumping of the 30” D.I. combined gravity sewer from North Strabane Southpointe and Western Center shall be provided into the Plant PS wet well.
2. Biotower Recycle Line – The work will consist of excavation to locate the 36” forcemain line from the Clarifier Pump Station which connects to the final clarifiers. A 36” x 24” wye-connection will be added with a 24” manual isolation plug valve on the new recycle line to recycle flow into the Biotower PS wet well. The valve will be located below grade and be provided with a valve box at grade. A new concrete vault will be installed on the recycle line to contain a new 24” mag flow meter and modulating flow control valve. Concrete hole drilled into the biotower PS wet well from the exterior for the new recycle line with link-seal used around the pipe.
On the 36” clarifier PS forcemain, after the wye-connection a new concrete vault will be installed for a new 36” 316L SS static mixer. A new PAC PTFE dosing line will be run from the Clarifier PS building to the new static mixer vault through a SS line. Heat tracing shall be provided for freeze protection of the PAC dosing line and injection quill assembly in the vault. Bypass pumping from the Clarifier Pump Station to the Final Clarifiers shall be provided during construction by the contractor.
Electrical power and control wiring and conduit from the two new vaults to the existing panels in the two pump station buildings shall be provided per the electrical plans and specifications as part of Contract 1.

More opportunities from Pennsylvania → Washington County

Same awarding agency

NAICS: 237120
New
SLED
Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction
Solicitation # WCTA PA 2026-1.1GC
Washington County Transportation Authority dba Freedom Transit is soliciting bids for contract WCTA PA 2026-1.1GC to construct a new fuel system at the WCTA Operations Facility located at 375 Berry Road, Washington, PA. The scope of work includes the construction of a concrete fuel tank pad with protective bollards, the installation of one 12,000-gallon gasoline aboveground storage tank and one 6,000-gallon diesel aboveground storage tank, two combo gas/diesel dispensers, two fuel management units, and a metal canopy. The project also requires the installation of all necessary electrical power and control wiring. Bids must be submitted electronically via the PennBid portal by 2:00 PM EST on November 18, 2026. The contract will be awarded to the lowest responsible proposer, with a strong emphasis on the use of Disadvantaged Business Enterprises (DBE). Compliance with Federal Davis-Bacon prevailing wage rates, Buy America requirements, and FTA Circular 4220.1 is mandatory. Bidders must provide a bid guarantee equal to 5 percent of the bid price, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Project administration will be handled by a Construction Manager, and payments will be processed using AIA Documents G702/CMa and G703. The contractor is responsible for all quality control testing and inspections, and the project includes a 60-day warranty period from the date of installation.
Oil and Gas Pipeline and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS