Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Pennsylvania was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Plant PS Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1 - Install Bypass and Recycle Pipelines, Vaults, and Valves

Closed
Canonsburg-Houston Joint Authority, Washington CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Bids for the Plant Pump Station Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1 must be submitted electronically via PennBid by 2:00 p.m. on July 1, 2026. The project involves significant excavation and installation work at the wastewater treatment plant located at 315 Curry Hill Road in Canonsburg, PA. Key tasks include locating existing forcemain lines and installing new bypass lines with valves to allow flow diversion at the plant’s pump station, as well as adding a new recycle line with a flow meter, control valve, and a static mixer vault to facilitate ammonia recycling into the Biotower Pump Station. Electrical power and wiring for these new installations will also be provided under this contract. Bypass pumping must be maintained during construction to ensure continuous operation of the system. Prospective bidders are required to attend a mandatory pre-bid meeting and site walkthrough on June 12, 2026. Proposal documents and bidding forms are available free of charge through PennBid, and bids must include a proposal security of at least 10% of the total bid price. Bidders may revise or withdraw proposals up until the submission deadline, but may not withdraw bids for 60 days after opening. Questions must be submitted electronically via PennBid, with any changes to the bidding documents communicated through official addenda. The Canonsburg-Houston Joint Authority reserves the right to accept, reject, or waive informalities in bids. The work scope ensures installation of necessary infrastructure components while maintaining operational requirements and adherence to wage and contractual regulations.

General Info

Bids due July 1, 2026, for pump station bypass and ammonia recycle upgrades in Canonsburg.

Agency

Pennsylvania → Washington CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Washington County, PA, USA

Set-Aside

NONE

Documents

(2)

Plant PS Bypass and Biotower Recycle Project Contract 1 Plan Drawings.pdf

PDF

Plant PS Bypass and Biotower Recycle Project Contract 1 Bid Specifications.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Washington County
ContactsNo contacts available
OfficeWashington County, PA, USA
Organization / Agency
Pennsylvania → Washington County
View Agency Profile
Office AddressWashington County, PA, USA
ContactsNo contact information available

Interested Companies (43)

Show more
Mele & Mele & Sons
Braddock, PA
JP Environmental
GOV Alpha
Brooklyn, NY

See All 43 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Bids must be submitted electronically to the Canonsburg-Houston Joint Authority via PennBid no later than 2:00 p.m. prevailing time on July 1, 2026, for the following:
Plant Pump Station Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1
The work will consist of excavation to locate the 36” pipe from the Clarifier PS and adding new 24” recycle line to recycle flow into the Biotower PS. A new concrete vault will be installed on the recycle line to contain a new flow meter and flow control valve. A new 36” static mixer and concrete vault will be added. Electrical power and control wiring and conduit shall be provided as part of Contract 1. Additional work will consist of excavation to locate the 18” and 24” force main lines and add tees and bypass lines with valves at the plant main pump station.
The bids will be opened publicly at the Canonsburg Municipal Building located at 68 East Pike Street, Suite 103, Canonsburg, PA 15317 at the apparent time and place.
Prospective bidders are required to attend a mandatory prebid meeting and site walkthrough on June 12, 2026 at 10 a.m. at 315 Curry Hill Road, Canonsburg, PA 15317.
Proposal documents, bidding forms, plans, and specifications may be obtained at no cost via PennBid at https://pennbid.bonfirehub.com. All bids must be upon the form furnished by the Canonsburg-Houston Joint Authority.
Each bid must be accompanied by proposal security in the form of a certified check, bank cashier's, treasurer's check, or bid bond in an amount equal to not less than ten percent (10%) of the total bid price in accordance with provisions contained in the "Instructions to Bidders" section of the specifications. Proposal Security shall be made payable to the Canonsburg-Houston Joint Authority.
The minimum salaries and wages as set forth in the Contract Documents must be paid on this project.
Proposals may be withdrawn, altered or otherwise modified within PennBid at any time prior to the due date and time. No bidder may withdraw its bid for a period of 60 days after date of bid opening.
Questions regarding this project shall be submitted electronically via the “Ask a Question” feature in PennBid no later than the date and time indicated. Responses to questions which require an addendum or changes to the Bidding Documents will be issued via a Public Notice and posted on PennBid. Bidders who have registered with and downloaded documents for this project from PennBid will be notified by email when a change or addenda has been posted.
The Canonsburg-Houston Joint Authority reserves the right to reject any or all bids, to accept or reject any part of any bid, and to waive any and all informalities in connection therewith.
Contract 1 - Scope of Work - The work will consist of two main areas at the WWTP at 315 Curry Hill Road, Canonsburg, PA 15317 as follows:
1. Plant Pump Station Influent Chamber Bypass Lines – The work will consist of excavation to locate the 18” and 24” forcemain lines from the Michigan Avenue Pump Station where they enter the Plant Pump Station influent chamber. A tee will be added on each line with manual isolation plug valves on each branch line to isolate and divert flow directly into the plant PS wet well. Concrete holes shall be drilled into the wet well from the exterior for the new bypass branch lines and link-seal used around the pipes. The valves shall all be located below grade and provided with valve boxes at grade.
One of the two forcemain lines shall remain in operation at all times (unless bypass pumping is provided by Contractor) which will require plugging of the other line at the influent chamber which is currently under construction. Bypass pumping of the 30” D.I. combined gravity sewer from North Strabane Southpointe and Western Center shall be provided into the Plant PS wet well.
2. Biotower Recycle Line – The work will consist of excavation to locate the 36” forcemain line from the Clarifier Pump Station which connects to the final clarifiers. A 36” x 24” wye-connection will be added with a 24” manual isolation plug valve on the new recycle line to recycle flow into the Biotower PS wet well. The valve will be located below grade and be provided with a valve box at grade. A new concrete vault will be installed on the recycle line to contain a new 24” mag flow meter and modulating flow control valve. Concrete hole drilled into the biotower PS wet well from the exterior for the new recycle line with link-seal used around the pipe.
On the 36” clarifier PS forcemain, after the wye-connection a new concrete vault will be installed for a new 36” 316L SS static mixer. A new PAC PTFE dosing line will be run from the Clarifier PS building to the new static mixer vault through a SS line. Heat tracing shall be provided for freeze protection of the PAC dosing line and injection quill assembly in the vault. Bypass pumping from the Clarifier Pump Station to the Final Clarifiers shall be provided during construction by the contractor.
Electrical power and control wiring and conduit from the two new vaults to the existing panels in the two pump station buildings shall be provided per the electrical plans and specifications as part of Contract 1.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS