Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PLATE, ORIFICE, FLUID

Closed
SPE7M3-26-T-8269Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 326122
New
DIBBS
TUBE ASSEMBLY, METAL
Solicitation # SPE7M4-27-T-1954
This solicitation, issued by the DLA Weapons Support Fluid Handling Division, is for the procurement of 67 metal tube assemblies, specifically Boeing Company part number 341T2220-19 (NSN 4710016556568). Designated as a critical application item, the requirement mandates Federal Aviation Administration airworthiness approval and strict adherence to Technical Data Package Rev B Gen 2 and Quality Assurance Provision 13873. The contract is a small business set-aside under NAICS code 326122, with delivery required within 161 days after the order date, targeting a need ship date of April 20, 2027, and a final delivery date of January 30, 2028. Shipping is FOB Origin, with the destination for inspection and acceptance being the DLA Distribution DDSP New Cumberland facility in Pennsylvania. Compliance requirements are extensive, including Item Unique Identification per MIL-STD-130 and a prohibition on the use of Class I ozone-depleting chemicals. Packaging and marking must follow MIL-STD-129, MIL-STD-2073-1E, and DLA packaging requirements. Quality control is governed by ISO 9001:2015 standards, with sampling potentially conducted under MIL-STD-105/ASQ Z1.4 requiring zero non-conformances. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and adherence to various DFARS and FAR clauses regarding cybersecurity, the Buy American Act, and the safeguarding of covered defense information.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 4 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

Solicitation SPE7M3-26-T-8269 is a procurement action by the Department of Defense Fluid Handling Division for four units of Fluid Orifice Plates (NSN 4730017017720), with one unit allocated to each of the following vessels: USS Abraham Lincoln (CVN 72), USS George Washington (CVN 73), USS Nimitz (CVN 68), and USS George H.W. Bush (CVN 77). The items are designated as critical application items and require engineering source approval by the government design control activity. Delivery is required within 20 days after receipt of order, with a final required delivery date of April 27, 2026. The terms are FOB Destination, and both inspection and acceptance will occur at the destination. The contractor must adhere to strict technical and quality requirements set forth in the DLA Master List, as well as environmental prohibitions against the use of ozone-depleting chemicals and the intentional addition of mercury. Packaging must comply with ASTM D3951 and RP001, while marking and labeling must follow MIL-STD-129. The contract incorporates various FAR and DFARS clauses, including mandates for electronic invoicing via Wide Area WorkFlow (WAWF) and cybersecurity compliance under NIST SP 800-171. Proposals must be submitted through the DLA Internet Bid Board System (DIBBS) by August 27, 2026.

General Info

Procurement of four fluid orifice plates for naval vessels, delivery by April 2026.

NAICS

326122 - Plastics Pipe and Pipe Fitting Manufacturing

Place of Performance

UNIT 100148 BOX 1, FPO, AP, 96607, USA

Set-Aside

NONE

Documents

1

Request for Quotations SPE7M3-26-T-8269

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FLUID HANDLING DIVISION
Contacts1 person available
OfficeUSA
Office AddressUSA
Contacts

Full Description

Show more
PLATE,ORIFICE,FLUID
PLATE,ORIFICE,FLUID
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
CRITICAL APPLICATION ITEM
AQUA-CHEM INC. 09647 P/N 048-08072-000
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
SPE7M3-26-T-8269
SECTION B
PR: 7016529457 PRLI: 0001 CONT’D
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7016529457 0001 EA 1.000
NSN/MATERIAL:4730017017720
DELIVERY (IN DAYS):0020
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
N21412
USS GEORGE WASHINGTON CVN 73
UNIT 100148 BOX 1
FPO AP 96607
US
RDD 777 SHIPMENT. TRANSPORTATION SEE DLAD PROC NOTE C19. FIRST DESTINATION TRANSPORTATION SEE DLAD PROC
NOTE C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
N21412
USS GEORGE WASHINGTON CVN 73
DLA VENDORS: USE VSM FOR
US
M/F: (TCN) N2141260671272
RDD: 777
PROJ: ZH9 TP 2
SUPP ADD: N48096 SIG: C
FOR GOVERNMENT USE ONLY: (IPD) 05
DIC: A41 DIST: V9B ADV: 2L FC: VO
Need Ship Date:00/00/0000 Original Required Delivery Date:04/24/2026
SPE7M3-26-T-8269
SECTION B
PR: 7016529399 PRLI: 0001 CONT’D
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0002 7016529399 0001 EA 1.000
NSN/MATERIAL:4730017017720
DELIVERY (IN DAYS):0020
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT PKGING DATA-QUP:001 WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
N03368
USS NIMITZ CVN 68
UNIT 100103 BOX 1
FPO AE 09523
US
RDD 777 SHIPMENT. SHIP BY FASTEST TRACEABLE MEANS. DO NOT USE PARCEL POST.
FREIGHT SHIPPING ADDRESS:
N03368
USS NIMITZ CVN 68
SPE7M3-26-T-8269
SECTION B
PR: 7016529399 PRLI: 0001 CONT’D
DLA VENDORS: USE VSM FOR
US
M/F: (TCN) N0336860500832
RDD: 777
PROJ: ZH9 TP 2
SUPP ADD: N48096 SIG: C
FOR GOVERNMENT USE ONLY: (IPD) 05
DIC: A4A DIST: V9B ADV: 2A FC: VO
Need Ship Date:00/00/0000 Original Required Delivery Date:04/24/2026
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0003 7016529486 0001 EA 1.000
NSN/MATERIAL:4730017017720
DELIVERY (IN DAYS):0020
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT PKGING DATA-QUP:001 WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT PKGING DATA-QUP:001 WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
SPE7M3-26-T-8269
SECTION B
PR: 7016529486 PRLI: 0001 CONT’D
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
N23170
USS GEORGE H W BUSH CVN 77
NAVIGATION DEPARTMENT
UNIT 100331 BOX 1
FPO AE 09513
US
RDD 777 SHIPMENT. SHIP BY FASTEST TRACEABLE MEANS. DO NOT USE PARCEL POST.
FREIGHT SHIPPING ADDRESS:
N23170
USS GEORGE H W BUSH CVN 77
DLA VENDORS: USE VSM FOR
US
M/F: (TCN) N2317060510240
RDD: 777
PROJ: ZH9 TP 2
SUPP ADD: N48096 SIG: C
FOR GOVERNMENT USE ONLY: (IPD) 05
DIC: A4A DIST: V9B ADV: 2A FC: VO
Need Ship Date:00/00/0000 Original Required Delivery Date:04/24/2026
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0004 7016548368 0001 EA 1.000
NSN/MATERIAL:4730017017720
DELIVERY (IN DAYS):0020
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
SPE7M3-26-T-8269
SECTION B
PR: 7016548368 PRLI: 0001 CONT’D
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT PKGING DATA-QUP:001 WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT PKGING DATA-QUP:001 WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT PKGING DATA-QUP:001 WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
N21297
USS ABRAHAM LINCOLN CVN 72
UNIT 100349 BOX 1
FPO AE 09520
US
RDD 777 SHIPMENT. SHIP BY FASTEST TRACEABLE MEANS. DO NOT USE PARCEL POST.
FREIGHT SHIPPING ADDRESS:
N21297
USS ABRAHAM LINCOLN CVN 72
DLA VENDORS: USE VSM FOR
US
SPE7M3-26-T-8269
SECTION B
PR: 7016548368 PRLI: 0001 CONT’D
M/F: (TCN) N2129752281408
RDD: 777
PROJ: ZH9 TP 2
SUPP ADD: N48096 SIG: C
FOR GOVERNMENT USE ONLY: (IPD) 05
DIC: A4A DIST: V9B ADV: 2A FC: VO
Need Ship Date:00/00/0000 Original Required Delivery Date:04/27/2026
SPE7M3-26-T-8269 NSN/Part Number: 4730-01-701-7720 Quantity: 1 EA Purchase Request: 7016529399QTY: 1 Delivery: 20 days ADO

More opportunities from Department Of Defense → FLUID HANDLING DIVISION

Same awarding agency

NAICS: 332999
New
DIBBS
HOSE, AIR DUCT
Solicitation # SPE7M4-26-T-437V
Solicitation SPE7M4-26-T-437V, issued by the DLA Land and Maritime Fluid Handling Division, is a request for quotations for 72 units of air duct hoses (NSN 4720011661104) intended for use with Blackhawk helicopters. Each hose must have a 2-inch inner diameter, an overall length of 26 inches, and include 2-inch soft cuffs on both ends. The procurement is categorized under NAICS 332999, with delivery required within 168 days after order, targeting a need ship date of March 23, 2027, and a required delivery date of May 16, 2027. Shipping is FOB Origin, with the final destination for inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to packaging and marking standards, specifically MIL-STD-129 and ASTM D3951, though the DLA Master List of Technical and Quality Requirements takes precedence. Palletization must comply with RP001. Contractors are required to use the Wide Area WorkFlow system for electronic invoicing and payment requests. Key compliance requirements include the Buy American Act, the Berry Amendment, and DFARS cybersecurity standards for safeguarding covered defense information. Evaluation of offers will exclude items produced via additive manufacturing unless authorized, and a price evaluation preference may be applied to HUBZone concerns.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 332999
New
DIBBS
HOSE ASSEMBLY, METAL
Solicitation # SPE7M4-26-T-360S
Solicitation SPE7M4-26-T-360S is a fixed-price procurement issued by the DLA Land and Maritime Fluid Handling Division for 12 units of metal hose assemblies, identified by NSN 4720-01-547-8193. The delivery is required within 168 days after order, with a need ship date of February 16, 2027, and a final delivery date of April 30, 2027, to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. While the contract specifies FOB Destination Other, offerors are instructed to submit quotes based on FOB Origin. The contract mandates strict adherence to quality and technical standards, requiring manufacturers to maintain an inspection system compliant with ISO 9001:2015 or an equivalent standard. Key requirements include supply chain traceability documentation per DLA directives, packaging according to ASTM D3951, and marking in accordance with MIL-STD-129. Due to the nature of the technical data, eligible offerors must possess an approved Joint Certification Program certification and authorization from the DLA controlling authority to access export-controlled data. Administrative compliance requires the use of the Wide Area WorkFlow system for invoicing and receiving reports. The procurement is subject to various federal regulations, including the Buy American Act and the Berry Amendment for domestic material restrictions. Evaluation may include a price preference for HUBZone concerns. Destination inspection is required per FAR 52.246-2, and the contractor must comply with specific DLA Master List technical and quality requirements, including configuration change management and bare item marking.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS