Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Playground Equipment, Surfacing, Installation & Repair

Closed
SDOC-24-B-094-MLState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 339920
New
SLED
Synthetic Skating Rink
Solicitation # 27-008
The City of New Britain is soliciting bids under solicitation number 27-008 for the furnishing, delivery, installation, commissioning, and warranty of a commercial-grade synthetic ice skating rink system. The project is located at 230 John Karbonic Way on the bituminous parking lot between Beehive Stadium and New Britain Stadium. The scope of work includes the synthetic skating surface, a perimeter dasher system with blade guard flooring, entry and exit gates, and necessary hardware. Additionally, the contractor must provide 144 pairs of skates, a commercial skate sharpening system with at least seven grinding wheels, three skate storage racks, and eleven rink panel storage units. The contractor is also responsible for site preparation, including surface cleaning and leveling, as well as providing staff training and operations and maintenance manuals. The contract will be awarded to the lowest responsible bidder based on the total base bid. Bidders must submit a comprehensive Statement of Qualifications, including their organizational history, financial solvency, and a record of contract completion. Required documentation includes a Non-Collusion Affidavit, a Certificate of Non-Arrearage to the State of Connecticut Second Injury Fund, and certifications regarding Equal Employment Opportunity and Affirmative Action. Bids must be submitted in sealed inner and outer envelopes to the City of New Britain Purchasing Department by 10:00 am on November 5, 2026. The successful contractor must provide a one-year guarantee on work and materials and adhere to the City of New Britain Standard Specifications for Municipal Construction.
DAS Procurement

POSTED

about 18 hours ago

DEADLINE

in 7 days
NAICS: 339920
New
SLED
WATER RESCUE SUIT
Solicitation # 49-27
Solicitation 49-27 is issued by the New Hampshire Department of Administrative Services to establish a purchase order contract for the procurement of water rescue suits. The required equipment is the Mustang Ice Commander v3 Ice Rescue Suit and Storage Bag (IC900103-6-0-202) or an equivalent product featuring a detachable inner buoyancy liner made of closed-cell AirSoft foam and SOLAS reflective tape. The award will be granted to the responsible vendor who submits a conforming bid that meets all technical specifications at the lowest total cost. Delivery must be completed within 30 days of receiving a purchase order, with the destination being the NH Fire Academy in Concord, New Hampshire. Bidders must submit their responses via email to [email hidden] by November 6, 2026, at 11:00 AM Eastern Time. Submissions must include a signed bid transmittal letter, a completed offer sheet, and a valid vendor application on file with the NH Bureau of Purchase and Property. Vendors are required to provide DUNS or SAM.GOV numbers and must disclose any conflicts of interest involving state officials. Additionally, contractors must provide Safety Data Sheets for products covered under the Workers Right to Know Act and notify the state if products contain mercury or PFAS. Payment is processed 30 days after the receipt of an itemized invoice, provided all items have been delivered and accepted.
Das Purchasing (statewide Bids & Contracts)

POSTED

5 days ago

DEADLINE

in 8 days
NAICS: 339920
New
Federal
Monterey Golf Range Technology
Solicitation # NAVMWR-27-R-0001
Solicitation NAVMWR-27-R-0001 is a design-build project for the renovation and expansion of the Monterey Golf Driving Range at NSA Monterey. The project aims to meet increased customer demand by repairing existing bays and adding 12 new hitting bays via a two-story hitting deck. The scope of work includes complete architectural and engineering designs for all civil, structural, electrical, and mechanical elements, the installation of a golf range technology system for ball flight tracking and interactive virtual golf, the construction of a 250 square foot range maintenance building, a chain-link fence evaluation, and the installation of three surveillance cameras. All work must comply with federal, state, and local codes, including the Uniform Federal Accessibility Standards Architectural Barriers Act. The contract will be awarded based on a best-value tradeoff between technical factors and price, with price weighted approximately equal to technical evaluations. Technical evaluation focuses on the proposed design solution, qualifications and experience, and the project execution method. Proposals must be submitted in two separate volumes, Technical and Price, by December 15, 2026. Key requirements include the appointment of a Chief of Construction Quality Control with at least 10 years of experience, the provision of payment and performance bonds by the prime contractor, and adherence to Davis-Bacon Act wage determinations. The government will retain 10 percent of all payments until final inspection and the delivery of all closeout documentation.
Commander Navy Installations Command

POSTED

6 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This contract involves the procurement of playground equipment, surfacing materials, installation, and repair services for the Osceola County School District in Florida. Bidders are required to submit fixed percentage discounts off their current catalogs or price sheets, which will be evaluated to ensure the lowest net cost for the district. The contract emphasizes the importance of adhering to safety standards such as those set by the Consumer Products Safety Commission, ASTM, and industry best practices, with certifications like IPEMA being preferred. All work must comply with school board regulations, industry standards, and safety guidelines, including proper coordination for utility locates and obtaining necessary permits. Bidders must hold appropriate occupational licenses, provide certification of authorized installation, and ensure all equipment undergoes approval by the district’s safety and environmental departments before purchase. Pricing submissions must include detailed cost tables for rubber mulch and surfacing products, with clear indication of company names, unit prices per square foot, and inclusion of all related costs such as freight, materials, and installation. The contract specifies that installation and repair services must be performed by certified personnel, with work inspected and approved prior to payment. Damage caused during work must be rectified at the contractor’s expense, and subcontracting requires prior approval and proper licensing. Overall, the contract aims to secure cost-effective, safe, and compliant playground solutions through a competitive bidding process, with responses due by March 20, 2024.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Osceola County
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Osceola County
Office AddressN/A
Contacts
Melanie Lachmiller

Full Description

Show more
1.04 PRODUCTS OR SERVICES TO BE PROVIDED, AND APPLICABLE SPECIFICATIONS Bids are being requested and will be evaluated on the basis of a minimum fixed percentage discount from bidders’ most current catalog(s), electronic or printed price sheet(s) for Playground Equipment, Surfacing, Installation & Repair in order to produce the lowest net cost for the District. Bidders shall provide a firm, fixed discount that will be applied to all items in the vendor’s current catalog(s), electronic or printed price sheet(s), if discount varies by manufacturer indicate that on the bid submittal form. Unless a change is deemed in the best interest of the School District there shall not be any discount adjustments during the term of the bid. Discount provided on the bid submittal form shall remain firm throughout the term of the bid. Bidders are encouraged to consider this requirement when offering discounts on the bid submittal form. If the order is estimated to be under $5,000.00, the schools and/or departments may use any of the awarded bidder(s). If the order is estimated to be over $5,000.00 the schools and/or departments must receive three (3) written quotes from the list of awarded Bidders, and the order will be awarded to the bidder with the lowest, responsible and responsive quote. Quotes shall be returned to schools and/or departments within three (3) days.A. SERVICES1) Play equipment must meet or exceed Consumer Products Safety Commission Guidelines and ASTM Standards. IPEMA Certification is desired, but not required. 2) Installation and repair services must be according to relative industry standards such as National Playground Safety Institute.3) Fall zone material and installation must adhere to industry related standards to include CPSC and ASTM.4) School Board regulations must be adhered to by all employees and the awarded Bidder(s) while on any School Board property.5) Any and all damage to grounds, underground utilities, buildings, shrubbery, District owned or leased equipment shall be made whole by the awarded Bidder(s).6) Awarded Bidder(s) must coordinate for “LOCATES”.7) Work shall be performed under a no cost permit issued through the District’s Permitting Department. 8) All work must be inspected prior to approval. Payment(s) are based on successful inspections.9) Bidders providing a service must hold an Occupational License. In accordance with Florida Statutes 205.065, a current Department of Professional Regulation certificate may be provided in lieu of an Osceola County Occupational License, with the copy of the Occupational License of home state/county/city.10) No part of this contract shall be subcontracted without the expressed permission of the Purchasing Department. Any request to subcontract must be in writing and accompanied by a copy of the subcontracting company’s license as stated in Section 105, A(9).11) All equipment/products must be approved by our Code Compliance and Environmental Safety Department prior to issuance of a purchase order. 12) All equipment/products must be approved by our Health and Safety Department. 13) Catalogs and price sheets for all play environment related products that you would like to be considered as part of this bid must be submitted with this bid response. 14) If freight charges apply to Surface Products it must be included in the bid price.15) If there is freight charges for playground equipment those charges must appear on the quotes for each project and must appear on the purchase orders issued to your company. B. INSTALLATION/REPAIR1) The installer/contractor shall be responsible for unpacking, uncrating and installation at job site in accordance with specifications.2) Installation and repair contractors must supply WRITTEN FACTORY CERTIFICATION that they are certified/authorized to install playground equipment as required by the manufacturer. Failure to supply this documentation with the bid proposal may result in bid rejection. Each Foreman on site supervising installation must have NPSI (National Playground Safety Institute) Certification or at least one member of the crew on site must have NPSI certification. The installing contractor has to provide a signed letter stating, “This equipment has been installed according to manufacturer’s specifications”. Letter must be provided at time of final inspection.3) If your company offers repair services the rates shall be a hourly rate on the bid submittal form.C. RUBBER MULCH Must meet or exceed Rainbow Turf Rubber Mulch1) Shall be composed of 100% recycled shredded SBR (styrene butadiene rubber) rubber tire buffing.2) Non-toxic iron oxide organic pigments and aromatic.3) Shall have been marketed by name with the United States for at least ten (10) years.4) Must meet or exceed the following:a) ASTM F1292 Stand Specification for Impact Attenuation.b) ASTM F1951-99 American with Disabilities Act Wheelchair Accessibility.c) ASTM D2859 Test for Burning Pill Test.d) ASTM F1551 Test for Water Permeability.e) Colorfastness AATCC Test Method 16E.5) Attach to the bid a price table for rubber mulch and must be included in your bid response stating:a) This price sheet may not contain other terms and/or conditions.b) Your company name must clearly be indicated on the price sheet.c) Prices must be stated per square foot, bag to include size and pallet with size of bag and quantity of bags per pallet.D. SURFACING PRODUCTS (POUR-IN-PLACE) Must meet or exceed Rainbow Turf Bond Poured-In-Place 3-Part1) Must meet or exceed the following criteria:2) Bonded rubber Poured-In-Place:a) Polyurethane.b) Blend of 100% recycled SBR (styrene butadiene rubber) and urethane.3) Shock Attenuation (ASTM F1292):a) Gmax: Less than 200.b) Head Injury Criteria: Less than 1000.4) Flammability (ASTM D2859)5) Tensile Strength (ASTM D412): 60 psi (4113 kPa).6) Tear Resistance (ASTM D6240: 140%7) Water Permeability: 0.4 gal/yd2/second.8) Accessibility: Comply with requirements of ASTM F1951.9) Required mix proportion by weight:a) Basemat: 16+% urethane (as ratio: 14% urethane divided by 86% rubber). 14% urethane, 86% rubber (based on entire rubber & urethane mis).b) Top Surface: 22% urethane (ration: 18% urethane divided by 82% rubber). 18% urethane, 82% rubber (based on entire rubber & urethane mix).10) Must meet current ASTM specification for determination of accessibility to surface systems under and around playground equipment. 11) Attach to the bid a price table for surfacing product and must be included in your bid response stating:d) List pricing based on thickness and color options.e) This price sheet may not contain other terms and/or conditions.f) Your company name must clearly be indicated on the price sheet.g) Prices must be stated per square foot and must include all materials, adhesives, non-woven geotextile membrane, delivered, supplied, and installed.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS