Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Playground Installation and Site Preparation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the South Redford School District involves the physical installation of playground equipment and comprehensive site preparation. The scope of work includes excavation, field verification of dimensions, and the installation of main structures and independent play items. Additionally, the contractor is responsible for installing snow fencing to ensure proper site access and student separation, while maintaining strict adherence to prevailing wage requirements and federal and state safety codes to deliver a fully compliant playground area. The project is categorized under NAICS code 238990. The solicitation was posted on November 20, 2026, with a response deadline of December 3, 2026. There is no specified set-aside status for this contract.

General Info

Subcontract for South Redford School District playground installation, site preparation, and safety compliance.

Documents

This scope was carved out of RFP-SRS-270000000347.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP-SRS-270000000347-1 | Addams Elementary School Playground Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 13 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom RFP-SRS-270000000347-1 | Addams Elementary School Playground Improvements
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → South Redford School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs physical installation of playground equipment and site preparation for prime contractors on South Redford School District projects. Executes excavation, field verification of dimensions, and installation of main structures and independent play items. Installs snow fencing for site access and student separation. Adheres to prevailing wage requirements and federal/state safety codes. Delivers a fully installed and safety-compliant playground area.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a construction effort located at the Main Wastewater Treatment Plant in California. The project has an estimated value between 18.5 million and 19.5 million dollars. The scope of work involves the rehabilitation of open and covered concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, and the installation of new instrumentation, electrical systems, and motor control center components. Additional tasks include excavation, trench work, surveying of reactors, and the installation of platforms for improved access. The solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The project encourages the participation of certified DBE, DVBE, and SBE subcontractors for services such as welding, electrical work, concrete rehabilitation, and coating. All work must comply with applicable state, county, and federal regulations. The response deadline for this solicitation is December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Michigan → South Redford School District

Same awarding agency

NAICS: 236220
New
SLED
RFP-SRS-270000000347-1 | Addams Elementary School Playground Improvements
Solicitation # RFP-SRS-270000000347
The South Redford School District is soliciting proposals for the construction of a new approximately 2,000 square foot play area at Addams Elementary School. The project scope includes the installation of equipment tailored for children aged four and younger, featuring a main structure with slides and climbing, as well as independent spinning, climbing, musical, and imaginative play items. The installation must utilize engineered wood fiber for surfacing and adhere to all federal and state safety rules and codes. The total budget for the project is capped at $175,000, which includes a $5,000 allowance for the owner's discretion. All work and final payments must be completed by June 1, 2027. Proposals must be submitted by November 23, 2026, via Buildingconnect.com or physical delivery. Required documentation includes a Proposal Pricing Form, a list of K-12 references, evidence of insurance, a Familial Disclosure Affidavit, and an Iran Sanctions Act Affidavit of Compliance. Bidders must provide bid security equal to 5% of the proposal, and contractors with bids of $50,000 or more must furnish 100% performance and payment bonds. This is a prevailing wage project. The School District reserves the right to award the contract to a provider other than the low bidder based on evaluation factors including experience, insurance, and regulatory compliance.
Commercial and Institutional Building Construction

POSTED

about 18 hours ago

DEADLINE

in 13 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS