Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract I-26-2060, titled Plaza Improvements, is a solicitation issued by the Illinois State Toll Highway Authority for infrastructure work on the Tri-State Tollway (I-94 and I-294) in Lake and Cook County, Illinois. The scope of work encompasses ramp pavement and shoulder replacement, the removal of existing toll plaza median islands, equipment, and canopies, and structure demolition. Additionally, the project includes the construction of barrier walls, installation of toll plaza monotubes, lighting, pavement marking, signing, and electrical work, as well as landscaping, erosion control, and maintenance of traffic. Specific performance locations include the Tri-State Tollway (I-294) from Mile Post 48.5 to 49.3 at Willow Road.
The project requires bidders to be IDOT prequalified and IDHR registered, with bids due by December 18, 2026. A bid guaranty of five percent of the total bid amount is required. Technical requirements include adherence to the 2010 Americans with Disabilities Act (ADA) and ISTHA Standard Specification Section 1001 for traffic maintenance. Key construction activities detailed in the schedule of prices include earth excavation, pavement and curb removal, the installation of portland cement concrete sidewalks, and the application of erosion control blankets and seeding. There is no specified set-aside status for this contract.
General Info
ISTHA contract for Tri-State Tollway plaza improvements, infrastructure work, and demolition.
HighAI Summary for CIP-97-985A Plaza 27 Removal and Ramps A & D Rehabilitation: Construction documents for the Illinois State Toll Highway Authority regarding Plaza 27 (Willow Road) removal and Ramps A & D rehabilitation on the Tri-State Tollway (I-294). The document includes an index of drawings, standard drawings, and general notes regarding safety and field conditions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract CIP-97-900A: I-PASS Installation for Ramp Plazas: Record drawings and technical specifications issued March 16, 1998, by the Illinois State Toll Highway Authority for the installation of I-PASS systems at Ramp Plazas 20, 22, 23, and 32. The document includes a comprehensive index of civil and electrical drawings, schedules of quantities, and standard construction details for pavement and protective devices.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract GRE-78-805: Sanitary Sewer and Water Main Construction at Willow Road Toll Plaza: Technical specifications and engineering drawings for the Illinois State Toll Highway Authority project GRE-78-805. The document includes site location maps, trench and bedding details, pump station top views, and control panel specifications for sanitary sewer and water main construction at the Willow Road Toll Plaza.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract GRE-80-O24: Plaza 23 (Half Day Road) Widening Record Drawings: Record drawings and specifications for the Illinois State Toll Highway Authority project GRE-80-O24 regarding the widening of Plaza 23 (Half Day Road). The document includes an index of drawings, general electrical notes, a four-stage construction sequence (clearing, pavement construction, and toll system removal), and a quantity table for building systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract GRE-82-053 Guardrail Modernization - Tri-State Tollway: Technical specifications and construction drawings for the Northern Illinois Toll Highway Authority Guardrail Modernization project (Contract GRE-82-053) from M.P. 53.3 to M.P. 70.7. Dated 9/30/85, the document includes Illinois State Toll Highway Standards, general safety provisions, construction area maps, and detailed work instructions for drainage structures, curb removal, and embankment grading.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract GRE-84-335 Index of Drawings and General Provisions: Document for the Illinois State Toll Highway Authority, Contract GRE-84-335, dated June 1, 1990. It includes an index of standard drawings for roadway sections, pavement reinforcement, and ramp sidewalks, as well as general safety provisions, material requirements, and installation standards for equipment and building materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract GRI-69-107: Toll Plaza Facilities-Interchange Reconstruction: As-built plans and specifications for the Northern Illinois Toll Highway Toll Plaza Facilities-Interchange Reconstruction (Contract GRI-69-107) at Willow Road and Tri-State Tollway. The document includes an index of drawings covering site plans, electrical, plumbing, and HVAC, as well as standard drawings for fencing and traffic control. It details construction staging and maintenance of traffic, with records dating from 1973 to 1987.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract GRO-85-345 General Notes and Index of Drawings: Technical document for Contract GRO-85-345 (Illinois State Toll Highway Authority) containing general safety provisions, OSHA compliance requirements, site safety protocols, and an index of drawings including beam, abutment, and pier details. Dated 2/20/86 and 12/31/2023.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract GRRS-76-246: Tri-State Tollway Resurfacing: As-built documentation for the Illinois State Toll Highway Authority contract GRRS-76-246 regarding Tri-State Tollway resurfacing. The document includes an index of drawings, general notes, standard design for traffic control devices, construction stages, and a summary of quantities. Dated April 1, 1998.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5221: Southbound Roadway Widening and Reconstruction: Record drawings and technical specifications for the Illinois State Toll Highway Authority Congestion Relief Plan, Contract I-07-5221. The document covers roadway widening and reconstruction of the North Tri-State Tollway (I-94) from mile post 56.5 to 59.7. It includes an index of drawings, quantity schedules, alignment plans, and general safety provisions dated July 10, 2007.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5222 Northbound Roadway Widening and Reconstruction - Record Drawings: Record drawings and index for the Illinois State Toll Highway Authority Congestion Relief Plan, Contract I-07-5222. The document covers Northbound roadway widening and reconstruction of the Tri-State Tollway (I-94) from mile post 55.5 to 59.7. It includes an index of drawings, lists of Tollway and IDOT standard drawings, and general safety and utility notification requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5243 I-294 Mainline Cross-Sections: Technical record drawings and cross-section specifications for the I-294 mainline project (Contract No. I-07-5243), prepared by Parsons Transportation Group. The document includes detailed engineering scales, staging layouts (Stage 1 through Stage 15), and elevation data dated 12/15/10.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5243 I-294 Mainline Cross-Sections: Technical engineering drawings and cross-sections for the I-294 Mainline project (Contract No. I-07-5243). The document includes detailed dimensions, scale data, temporary pavement stages, and record drawings dated 12/15/10, prepared by Parsons Transportation Group Engineers & Planners for the Illinois State Toll Highway Authority.
PDF
PDF, High priority: read this first48 pages · specifications
HighAI Summary for Contract I-07-5243 Index to Drawings: This document is an Index to Drawings for Contract I-07-5243, dated July 17, 2008, with record drawing updates from December 15, 2010. It provides a comprehensive list of drawing sheets across three volumes, covering roadway plans, drainage, utility plans, MOT (Maintenance of Traffic), erosion control, and specific bridge repairs for Sanders Road over I-294.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5243: Roadway & Bridge Reconstruction Northbound Tri-State Tollway I-294: Final contract plans and record drawings (dated 12/15/10) for the Illinois State Toll Highway Authority. The project covers roadway and bridge reconstruction from Willow Road to Dundee Road (Mile Post 48.3 to 51.3). The document includes drawing indexes, professional seals from Parsons Transportation Group and Singh & Associates, and references to Tollway and IDOT standard drawings.
PDF
PDF, High priority: read this first40 pages · specifications
HighAI Summary for Contract I-07-5243 Roadway Details - Concrete Barrier and Energy Attenuator: Technical drawings and specifications for Contract I-07-5243, detailing concrete pads for energy attenuators (QuadGuard System), double-face concrete barriers, and gutter profiles. Includes bill of materials, bar schedules, and construction notes for record drawings dated 12/15/10.
PDF
PDF, High priority: read this first36 pages · specifications
HighAI Summary for Contract I-07-5243 Willow Road Ramp Cross-Sections: Technical record drawings containing cross-sections for Willow Road Ramp 'C' and 'D' under Contract No. I-07-5243. The document includes engineering data, elevations, and match lines, prepared by Parsons Transportation Group, with record dates spanning 2008 to 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5245 - I-294 Mainline Record Drawings: Technical record drawings and cross-sections for the Illinois State Toll Highway Authority, Contract No. I-07-5245. The documents include drainage details, RCP and catch basin specifications, and staging for the I-294 mainline construction, dated June 7, 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5245 - Roadway & Bridge Reconstruction: Contract plans and record drawings for the Illinois State Toll Highway Authority regarding the roadway and bridge reconstruction of the southbound Tri-State Tollway I-294 from Willow Road to Lake-Cook Road. The document includes indices for roadway, MOT, drainage, lighting, landscaping, and bridges, dated June 2007 with record drawings from June 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5245: Roadway & Bridge Reconstruction - Southbound Tri-State Tollway I-294: Contract plans and specifications for the Illinois State Toll Highway Authority project I-07-5245. The project involves roadway and bridge reconstruction of the Southbound Tri-State Tollway I-294 from Willow Road to Lake-Cook Road (Mile Post 48.3 to 52.9). The document includes a detailed index of drawings across three volumes covering roadway, MOT, drainage, lighting, landscaping, and bridges, with record drawings updated as of June 19, 2007.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract I-07-5245: Roadway & Bridge Reconstruction - Southbound Tri-State Tollway I-294: This document contains contract plans and technical specifications for the reconstruction of roadways and bridges on the Southbound Tri-State Tollway I-294 from Willow Road to Lake-Cook Road. It includes record drawings dated June 19, 2007, and updated June 7, 2010, featuring a summary of quantities, general notes, structural repair details for Bridge 335, and drainage specifications.
XLSX
XLSX, High priority: read this first20 pages · bid-schedule
HighAI Summary for Contract I-26-2060 Schedule of Prices - Plaza Improvements Tri-State Tollway: A detailed Schedule of Prices for Contract I-26-2060 regarding Plaza Improvements on the Tri-State Tollway (I-94 and I-294). The document lists various pay items, designations, units, and quantities for construction activities including earth excavation, concrete work, pavement removal, and signage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract MIP-88-415R: Plaza 27 Rehabilitation Record Drawings: Record drawings and general notes for the Illinois State Toll Highway Authority Plaza 27 Rehabilitation (Contract MIP-88-415R), dated November 23, 1988. The document includes an index of drawings covering pavement reinforcement, drainage, electrical, and HVAC plans, along with general safety provisions, pollution control, and construction requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract MIP-93-584: Roadway Resurfacing and Rehabilitation: Record drawings and index for the Illinois State Toll Highway Authority project (Contract MIP-93-584) covering roadway resurfacing and rehabilitation from mile post 56.4 to 59.0. The document includes a drawing index featuring typical sections, construction details, and maintenance of traffic plans, dated April 1, 1994, with Addendum No. 1 dated 04-15-94.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract MIP-93-585: Tri-State Tollway Roadway Resurfacing and Rehabilitation: Record drawings and technical specifications for the Illinois State Toll Highway Authority contract MIP-93-585, dated 1/1/94. The document covers roadway resurfacing and rehabilitation from mile post 59.0 to 65.0, including an index of roadway and bridge drawings, maintenance of traffic stages, general safety provisions, and pollution control requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract MIP 95-736B: Plaza Modifications - Systemwide: Technical record drawings and general specifications for the Illinois State Toll Highway Authority contract MIP 95-736B. The document covers plaza modifications across the Tri-State and Northwest Tollways, including specific sites like Devon Ave and River Road. It includes a drawing index (75 sheets), site plans, and general notes regarding safety (OSHA), pollution control, and construction requirements as of October 1997.
PDF
PDF, High priority: read this first46 pages · specifications
HighAI Summary for Contract RR-13-4095 Index of Drawings and General Notes: This document is part of Contract RR-13-4095 for the Illinois State Toll Highway Authority. It includes an Index of Drawings covering RTMS/CCTV relocations, guardrail improvements, and sign truss repairs, as well as general construction notes regarding Maintenance of Traffic (MOT), electrical requirements, and permit compliance. It includes Addendum #1 and references IDOT and Tollway standard drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract RR-16-4277R Record Drawings - I-94 Pavement & Structural Preservation: Record drawings and technical specifications for the Illinois State Toll Highway Authority Contract RR-16-4277R. The project involves pavement and structural preservation and rehabilitation of I-94 from Half Day Road to Edens Spur Plaza. The document includes index sheets for roadway, lighting, ITS, and structural plans, as well as references to IDOT and Illinois Tollway standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract RR-16-9193 Systemwide CCTV Camera Construction Record Drawings: Record drawings and technical specifications for the Illinois State Toll Highway Authority Contract RR-16-9193. The document covers CCTV camera construction across the Tri-State, Reagan Memorial, and Veterans Memorial Tollways, including an index of drawings, electrical notes, MOT plans, and a summary of quantities/pay items.
PDF
PDF, High priority: read this first178 pages · specifications
HighAI Summary for Contract RR-17-4345: I-94 LED Retrofit and ITS Device Replacement: Record drawings and general notes for the Illinois State Toll Highway Authority contract RR-17-4345. The project involves LED retrofit and ITS device replacement on I-94 from mile post 11.5 to 22.0. The document includes a construction area map, index of drawings, and general notes regarding lighting schedules, guardrail installation, and fiber optic cable utility locates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract RR-18-4350 Specifications and Drawing Index: Technical specifications and drawing index for Contract RR-18-4350, dated November 30, 2019. The document includes a comprehensive index of drawings covering general plans, maintenance of traffic (MOT), roadway plans, utility matrices, and traffic signal plans, along with a list of applicable Tollway and IDOT highway standards and general construction notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract RR-20-4342R - Systemwide Ramp Queue Detection: Technical specifications and record drawings for Contract RR-20-4342R regarding Systemwide Ramp Queue Detection for the Illinois State Toll Highway Authority. The document includes ITS abbreviations, cable/conduit legends, a project schedule (February to October 2022), and a pay item list for various tollway locations (I-88, I-90, I-294, I-355).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract RR-RT21-B827 Record Drawings - Tri-State Tollway Pavement Rehabilitation: Record drawings and technical specifications for the Illinois State Toll Highway Authority contract RR-RT21-B827. The project involves pavement rehabilitation of the Tri-State Tollway (I-94) from Half Day Road to Atkinson Road. The document includes an index of drawings, professional seals, standard drawing references for roadway, drainage, and traffic maintenance, and general construction notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract T-10A - Northern Illinois Toll Highway Construction Plans: Construction drawings and specifications for the Illinois State Toll Highway Commission, Contract T-10A, covering STA. 2670+000 to STA. 2694+91.36. The document includes an index of drawings, plan and profile data, general notes, technical specifications for inlets and headwalls, and maintenance of traffic requirements. Dated July 1, 1976, with updates noted through 2007.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract TP-2 Index of Drawings and Site Plan Specifications: A technical document dated 12/31/2005 for Contract TP-2, containing an index of drawings for toll island and site plans, a summary of quantities for building repairs, and general notes regarding site plan drawings and engineering specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 2634-1-1 (T-10A): Technical engineering drawing and specifications for Project 2634-1, dated 10/03/2003. The document contains detailed dimensions, scale (1:100), and technical notes regarding special excavation, wall bearings, and cut/fill areas for sections T-10A through T-11B.
PDF
PDF, High priority: read this first47 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Plaza 22EB Improvements (I-25-2006): Revised October 15, 2026, this Geotechnical Investigation Report for the Illinois Tollway (Contract I-25-2006) covers the Plaza 22EB exit ramp to Townline Road in Lake County, Illinois. It provides subsurface soil and groundwater characterization, including results from six soil borings and one pavement core, to support the design of monotube structures, a prefabricated building, and roadway reconstruction.
PDF
PDF, High priority: read this first41 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Plaza 22WB Improvements: Revised October 15, 2026, this report provides a geotechnical investigation for the Plaza 22WB entrance ramp from Townline Road (Contract I-25-2006) in Lake County, Illinois. It includes subsurface soil exploration, laboratory testing, and engineering recommendations for monotube structures, prefabricated buildings, and roadway reconstruction.
PDF
PDF, High priority: read this first46 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Plaza 23EB Improvements: Revised October 15, 2026, this geotechnical report for Illinois Tollway Contract I-25-2006 provides subsurface soil and groundwater characterization for the Plaza 23EB improvements on the I-94 EB Exit Ramp to Half Day Road. It includes soil boring data, laboratory testing, and engineering recommendations for monotube structure foundations, prefabricated building footings, and roadway reconstruction.
PDF
PDF, High priority: read this first41 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Plaza 23WB Improvements (Contract I-25-2006): Revised October 15, 2026, this report by GSG Consultants, Inc. provides a geotechnical investigation for the Plaza 23WB improvements on the I-294 WB entrance ramp from Half Day Road in Lake County, Illinois. It details subsurface soil conditions, groundwater levels, and provides critical engineering recommendations for monotube structure foundations (drilled shafts), prefabricated building footings, and roadway reconstruction.
PDF
PDF, High priority: read this first42 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Plaza 27NB Improvements (Contract I-25-2006): Revised October 15, 2026, this report by GSG Consultants, Inc. provides a geotechnical investigation for the Plaza 27NB improvements on the I-294 NB entrance ramp from Willow Road in Cook County, Illinois. It details subsurface soil and groundwater conditions based on four soil borings and one pavement core to support the installation of monotube structures, a prefabricated building, and roadway improvements.
PDF
PDF, High priority: read this first47 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Plaza 27SB Improvements (Contract I-25-2006): Revised October 15, 2026, this Geotechnical Investigation Report for the Illinois Tollway (Contract I-25-2006) details subsurface soil and groundwater conditions for the Plaza 27SB improvements on the I-294 SB exit ramp to Willow Road. The report includes results from six soil borings and one pavement core, providing critical technical specifications for monotube structure foundations, shallow footings for a prefabricated building, and roadway subgrade recommendations.
PDF
PDF, High priority: read this first152 pages · specifications
HighAI Summary for I-07-5221 Project Drawings and Specifications: A comprehensive set of technical drawings and specifications for a highway project (I-07-5221). The document includes an index of drawings across two volumes, covering alignment plans, typical sections, maintenance of traffic (MOT), drainage, erosion control, and landscaping. It also references ISTHA, IDOT Highway, and IDOT District 1 standard drawings and includes a schedule of quantities for excavation and embankment.
PDF
PDF, High priority: read this first139 pages · specifications
HighAI Summary for I-07-5222 Drawing Index and Specifications: This document serves as a comprehensive index of drawings and standards for project I-07-5222. It includes Volume 1 (General Notes, Utility Matrix, Roadway Plans, Drainage, and Landscaping) and Volume 2 (Cross Sections), along with detailed Tollway and IDOT highway standard drawings for pavement, drainage, and traffic control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Illinois State Toll Highway Authority Contract CIP-97-8602 Record Drawings: Volume 3 Record Drawings for Contract CIP-97-8602, dated 11-30-2001, regarding the rehabilitation of Deerfield Road/Ramp F, Lake Cook Road Interchange, and Willow Road Ramps A & D on the Tri-State Tollway (I-294). The document includes an extensive index of drawings covering roadway plans, profiles, drainage, erosion control, and structural details for retaining walls and pump stations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Illinois State Toll Highway Authority Contract I-07-5243 Final Contract Plans: Final contract plans (Volume II) for the roadway and bridge reconstruction of the Northbound Tri-State Tollway I-294 from Willow Road to Dundee Road (Mile Post 48.3 to 51.3). The document includes record drawings dated 12/15/10, a drawing index, and references to both Tollway and IDOT standard drawings for pavement and bridge work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Illinois State Toll Highway Authority - Contract I-07-5243 Landscaping Plans: Technical landscaping specifications and record drawings for Contract I-07-5243. Includes general notes on construction, plant quality (ANSI Z-601), sodding requirements, and detailed landscaping treatment sections. Contains a landscaping schedule with item numbers and quantities, and site plans for the I-294 SB area. Dated 05/14/08 with record drawing updates from 12/15/10.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for Illinois State Toll Highway Authority Contract I-26-2060 Advertisement for Bids: Advertisement for Bids dated November 9, 2026, for Contract No. I-26-2060. The project involves ramp pavement and shoulder replacement, structure demolition, and toll plaza electrical work on the Tri-State Tollway (I-94 and I-294) in Lake and Cook County, Illinois. Bids are due by December 18, 2026, via BidBuy. Requires IDOT prequalification and IDHR registration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Illinois State Toll Highway Authority Contract RR-14-5692 - As-Built Plans: As-built construction documents for Illinois State Toll Highway Authority Contract RR-14-5692, covering the Grand Avenue Ramp Reconstruction and systemwide repairs on I-94, I-294, and I-355. The document includes professional seals from multiple engineering firms (Primera, EJM, Terra, Strand, Epstein, Lin, and Upchurch) and an index of drawings across three volumes, including general plans, drainage, utility, and structural geotechnical sections. Dated between 2014 and 2019.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Illinois State Toll Highway Authority - Contract RR-21-4575R Record Drawing: This document consists of record drawings and general notes for Contract No. RR-21-4575R regarding plaza improvements on the Tri-State Tollway (I-94/-294) across multiple plazas (20, 22, 23, 26, 24, 27, 28). Dated July 11, 2022, it includes an index of sheets, general safety and construction provisions, a summary of quantities, and specific pay items for sign removal and support installation.
The work under this contract includes ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; structure demolition; barrier wall construction; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, maintenance of traffic and other miscellaneous work
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.